Operator

Greetings. Welcome to Fortuna Mining's Q3 2024 Financial and Operation Results Conference Call. [Operator Instructions] Please note, this conference is being recorded.

I will now turn the conference over to your host, Carlos Baca, Vice President of Investor Relations. Carlos, you may begin.

C
Carlos Baca
executive

Thank you, Paul. Good morning, ladies and gentlemen. I would like to welcome you to Fortuna Mining's Third Quarter 2024 Financial and Operational Results Conference Call. Hosting the call today on behalf of the company will be Jorge Alberto Ganoza, President and Chief Executive Officer; Luis Dario Ganoza, Chief Financial Officer; David Whittle, Chief Operating Officer, West Africa. Today's earnings call presentation is available on our website.

As a reminder, statements made during this call are subject to the reader advisories included in yesterday's news release, the earnings call webcast presentation, MD&A and the risk factors in our annual information form.

Financial figures contained in the presentation and discussed in today's call are presented in U.S. dollars unless otherwise stated. Technical information in the presentation has been reviewed and approved by Eric Chapman, Fortuna's Senior Vice President of Technical Services and qualified person.

I would now like to turn the call over to Jorge Alberto Ganoza, President, Chief Executive Officer and Co-Founder of Fortuna.

J
Jorge Durant
executive

Thank you, Carlos. Q3 performance demonstrates the strength of our business. We remain focused on delivering value to our shareholders through our strategic investments, operational excellence, unlocking geologic potential of our properties and responsible mining practices.

Fortuna has had a record quarter on several key financial metrics, starting with record sales of $275 million and we're tracking to generate sales of over $1 billion this year. We benefited from incrementally higher gold prices, selling at an average realized price of $2,490 per ounce compared to $2,330 in the second quarter and $2,080 in the first quarter.

We recorded earnings of $50.5 million and earnings per share of $0.16, well ahead of analysts' consensus of $0.11. Our EBITDA was a strong $131 million, representing a 48% margin over sales, which is an increase from 43% in the second quarter and 42% in the first quarter.

Our free cash flow from ongoing operations was a strong $56 million compared to $38 million in the second quarter. We remain disciplined with our costs, achieving a cash cost of $1,059 per gold equivalent ounce in the quarter and $977 for the 9 months. We're well aligned to meet our guidance for the year of $935 to $1,055. That's our range for guidance.

Throughout the mine portfolio, we're not experiencing significant inflationary pressures on labor, services or consumables against our annual budget. Our West African operations, Yaramoko and Seguela are driving performance and tracking on the low-end of cost guidance. In Argentina, Lindero is about 10% above guidance for the year due to lagging currency devaluation against inflation.

Our capital projects are also tracking well against guidance. Under the concept of sustaining capital at our mines, we have a global budget figure for the year of $130 million. For the 9 months, we have executed $98 million or 75% of the annual budget.

Currently, all our mines remain within their capital execution plans and are expected to finish the year within budget range, with the only exception of the Yaramoko Mine, which is accelerating 2025 underground development in the second half of this year with an additional capital budget of $11 million. This unbudgeted development is bringing new mineralized zones identified throughout 2024 into the 2025 mine plan.

Additionally, our largest sustaining capital project in 2024 is the Lindero leach pad expansion with a budget of $42 million. The project remains on time and on budget. We started placing ore on the leach pad in mid-October, and the project is scheduled for completion with final demobilization of contractors taking place in January and February of next year.

I remind you that in 2024, this project alone represents approximately $400 in the Lindero AISC and $90 in our consolidated AISC. This project, once completed, serves the mine for a decade.

Our AISC for the quarter and 9 months were $1,695 and $1,618, respectively. AISC is tracking on the upper end of the guidance range for the year, driven by the aforementioned increase in underground development to access new resources at the Yaramoko Mine and the higher costs at Lindero resulting from the lagging peso devaluation against the inflation.

Regarding exploration, we have increased our 2024 global budget from the original $37 million to the current $44 million in order to expand our drill program at the Seguela Mine's Kingfisher discovery made earlier this year and also continue extending deeper mineralization at the Sunbird deposit in support of an underground mine plan. Our aim remains to produce an updated resource estimate for Seguela before the end of the year, encompassing new mineral deposits and extensions such as Kingfisher, Badior and Sunbird pit.

With respect to the San Jose Mine, after 13 years of operations, we have made a decision to initiate a progressive mine closure starting in Q1 2025. Our project team is expected to deliver the final closure plan and budget in the fourth quarter of this year, which considers closure and monitoring activities over an 8-year period. Closure activities will be concurrent with continued mining and processing at a reduced rate of under 1,000 tonnes per day for approximately the initial 18 months starting next year.

Management expects cash flow from continuing operations during 2025 and half of 2026 will offset closure costs currently provisioned at around $15 million to $20 million, but expected to increase as a result of the updated feasibility level closure plan being developed.

With respect to our capital allocation priorities, first, we have achieved the set objective of putting together a fortress balance sheet after a capital-intensive few years here at the company. We recorded a net cash position this quarter and reduced and restructured our credit lines, providing for liquidity of about $350 million, maintaining our debt-to-EBITDA ratio under a low 0.2 and reducing per quarter financial costs year-over-year comparison by about $3 million.

Second priority, we continue investing record annual amounts to unlock the geologic potential and value of our properties. We're focused on high-value opportunities in our portfolio at the Seguela Mine, the Diamba Sud project in Senegal, and the Lindero Mine in Argentina.

With that, thank you for your continued support. I'll now let David Whittle provide us with an update on West African operations.

D
David Whittle
executive

Thanks, Jorge. I'm pleased to report on the strong operational performance and significant milestones achieved by our West African operations during the third quarter of 2024. Both mines exceeded their planned production targets, and again, reported 0 lost time injuries for the quarter.

Seguela and Yaramoko had a successful third quarter regarding production, combining for 63,004 ounces of gold for the quarter and 189,168 ounces for the first 3 quarters of 2024. The power interruptions experienced by both Yaramoko and Seguela did not extend into the third quarter, which enabled both mines to surpass their production targets for the quarter.

In the third quarter, Seguela mined 484,000 tonnes of ore at an average gold grade of 2.48 grams per tonne and 2.9 million tonnes of waste, achieving a strip ratio of 6.1:1. The processing plant treated 418,000 tonnes at an average grade of 2.69 grams per tonne, producing 34,998 ounces of gold for the quarter and totaled 102,537 ounces for the first 9 months of 2024.

The increased run-time due to the additional power availability at the processing plant allowed for the processing of additional lower grade ore when compared to previous quarters. Plant throughput averaged 210 tonnes per hour for the quarter with a peak of 216 tonnes per hour averaged in September.

Initiatives have started in order to further optimize the processing plant's performance. The increased throughput at Seguela has necessitated the advancement of preparations for the next lift of the tailings storage facility. The design for the next lift has been completed, which when constructed will see sufficient tailings storage capacity until mid-2029 at the planned throughput rates. Contractor quotations have been received and construction activities are expected to commence in the fourth quarter.

In the third quarter, Seguela experienced full power availability from the national grid. Backup power generating capacity is now installed on site to mitigate any further power supply issues, and work is scheduled to commence on the construction of the solar power plant in the fourth quarter.

Mining activities at Seguela continue to be focused on the Antenna, Ancien and Koula pits, with mining at each of the 3 pits being in line with the mine plan. Continued exploration success, combined with the processing plant optimizations providing exciting opportunities for the Seguela Mine to surpass previously expected annual production targets and 2025 will see us bring forward a number of capital initiatives to exploit these opportunities.

Extensive drilling is continuing at the Kingfisher deposit and Sunbird underground project. It is expected that a maiden resource for the Kingfisher deposit will be produced by year-end. Drilling at the Sunbird underground project is producing good results and mining feasibility work is progressing well. Both deposits have the potential to be core production deposits for a number of years at Seguela.

In addition, an initial scoping study is currently being conducted with regards to underground mining opportunities at the Ancien pit, whilst further drilling continues within the lease on some of the many identified exploration targets. The continued strong production performance at Seguela resulted in a cash cost of $655 per ounce and an AISC of $1,176 per ounce of gold. Seguela remains ahead of schedule year-to-date and is on track to achieve annual production guidance of between 126,000 and 138,000 ounces.

At Yaramoko, 102,000 tonnes were mined at an average grade of 7.75 grams per tonne for 25,589 ounces of gold. The processing plant treated 124,000 tonnes with an average grade of 6.71 grams per tonne, producing 28,006 ounces of gold, in line with the mine plan and totaling 86,631 ounces for the 3 quarters of 2024.

Following the seismic event in the second quarter, mining schedules at the Zone 55 ore body were reassessed to mitigate the effects of future seismic events. This review and subsequent resequencing of mining activities reduced the availability of the higher grade stopes during the third quarter, leading to the slightly lower production when compared to the second quarter.

As a result of this review, Fortuna has been able to optimize the development layout of the mine and reduce future development requirements. As such, it is now expected that development operations will cease at the Zone 55 ore body late in the fourth quarter with only stoping activities occurring in 2025 and beyond.

Mining operations at the QVP ore body continued in line with the mine plan. Recent drilling is indicating the potential for the extension of mining further along stripe to the east and development will commence to test those extensions in the fourth quarter. Yaramoko's strong production during the quarter resulted in a cash cost of $974 and an AISC of $1,373 per ounce of gold and remains on track to achieve its production guidance of 105,000 to 119,000 ounces of gold.

On the Diamba Sud project in Senegal, drilling will recommence in the fourth quarter now that the wet season is over. A resource update is currently being prepared based on the drilling to-date. Geotechnical, hydrological, environmental and other studies are continuing in order to be able to produce a PEA in 2025.

Our West African operations have demonstrated resilience and strong performance. We remain focused on optimizing production, advancing our exploration opportunities whilst maintaining our commitment to safety and operational excellence. Back to you, Jorge.

J
Jorge Durant
executive

Thank you, David. Luis will now take us through the highlights of our financials report.

L
Luis Durant
executive

Thank you. Attributable net income to Fortuna shareholders for the quarter was $50.5 million or $0.16 per share. This compares to 13% in the prior quarter and $0.09 in Q3 of 2023. Our strong financial performance in the quarter was the result, as Jorge emphasized, of record-high metal prices and cost per ounce aligned with our guidance for the year.

Our cash cost per gold equivalent ounce was $1,059, higher than the last 2 quarters, but still within our annual forecast. When compared to the same quarter in 2023, cost per ounce was higher by $244, mostly as a result of higher costs at Seguela and Yaramoko and with a lesser impact at San Jose. In the case of Seguela, costs are higher due to the low-cost production in Q3 of the previous year related to low stripping ratios and higher initial head grades.

A few comments on the income statement. Depreciation and depletion in the quarter was $59 million, which includes $16.8 million in depletion of the purchase price related to the acquisition of Roxgold in 2021. On the general and administration line item, expenses were $16 million. And as shown in the breakdown we provide in our -- in Page 11 of our MD&A and in the news release, this was comprised of $9.9 million of in-country G&A at our mining operations, $3.96 million of corporate G&A and $2.2 million of share-based compensation.

We recorded investment gains of $3.2 million for the quarter from cross-border Argentine peso-denominated bond trades and $8.3 million year-to-date. This is a benefit granted to exporters by the Argentine government, whereby 20% of export proceeds is allowed to be converted into pesos at a preferential exchange rate.

We saw a $2 million reduction in interest and finance cost this quarter, contributing to our overall cost efficiency. As shown in Note 21 of the financials, the actual interest expense charge was $3 million below the prior year, reflecting lower debt balances and lower cost of financing year-over-year.

Our effective tax rate was 21% for the quarter and 22% year-to-date. The 9-month period is distorted by the $12 million deferred tax recovery related to the convertible note offering closed in Q2. Excluding this effect and quarterly variability from foreign exchange, at current metal prices, we expect our effective tax rate to be in the 28% to 30% range and our current tax rate to be in the 32% to 35% range.

Moving on to the cash flow. We generated $92.9 million of net cash provided by operating activities, which includes $26.4 million of negative changes in working capital. The bulk of this negative change is related to timing of accounts receivable. As we have disclosed before, we have been experiencing challenges in the collection of VAT at our Yaramoko operations in Burkina Faso, and anticipate this might continue to be a challenge moving forward. VAT receivables at Yaramoko increased $2.6 million in Q3 and $12 million year-to-date.

In the investing section of the cash flow statement, we recorded $50.2 million under additions to property, plant and equipment, consisting of approximately $38 million of sustaining capital, including brownfields exploration and $12 million of non-sustaining capital expenses. Year-to-date, we have recorded additions to property, plant and equipment of $141.9 million, consisting of $103 million of sustaining capital and around $39 million of non-sustaining capital. This includes $19 million in exploration, $11.4 million in Diamba Sud, and $6.5 million repurchase of the Seguela NSR back at the beginning of the year.

For Q4, we expect to see similar levels of CapEx as in Q3, mostly related to the conclusion of the leach pad expansion at Lindero. Our free cash flow from ongoing operations was $56.6 million. This is after corporate expenses, interest and all sustaining capital expenditures. Our net free cash flow after all capital expenditures was $44 million.

Moving on to the balance sheet. We closed the quarter with a cash position of $181 million and total liquidity of $431 million, including the full undrawn amount of our $250 million revolving credit facility. Subsequent to the end of the quarter, we have amended the credit facility to reflect a stronger balance sheet position coming out of the convertible note offering in the second quarter. The amendment includes a resizing of the facility from $250 million to $150 million.

Additionally, the prior facility carried an accordion feature of $50 million, which has been increased to $75 million. We have also achieved improvements in the pricing grid and covenant terms. In summary, this has allowed us to reduce our cost of capital and provided us with added financial flexibility.

Back to you, Jorge.

J
Jorge Durant
executive

Thank you. Carlos?

C
Carlos Baca
executive

I would like -- sorry, we would now like to open the call to any questions that you may have. Please, Paul, if you can prompt the audience.

Operator

[Operator Instructions] The first question today is coming from Don DeMarco from National Bank Financial.

D
Don DeMarco
analyst

Congratulations on the strong quarter. So, first question, Jorge, I'm just reading in the MD&A that at Lindero, the company may be required to temporarily repatriate U.S. dollars into Argentina and convert them into Argentine pesos. Can you just give us a sense of what -- maybe quantify the financial implications of this?

L
Luis Durant
executive

So, what we were disclosing is that in the next few quarters, what we expect to see in Argentina is a shift from what we have been seeing up to now. where we had been able to repatriate cash surpluses from Lindero through the intercompany financing arrangement we had in place. That has been exhausted by now. And we will find ourselves in the situation most exporters are in today.

Any cash surpluses will have to be either kept in country or we'll be looking into different alternatives as to how to manage that exposure. All cash surpluses are kept in local currency, in pesos, in country, right? So, we are going to only start accumulating cash locally towards year-end. It will build up at current prices over the course of 2025, and we're looking into different alternatives as to manage that exposure. That's the best we can say at this stage.

D
Don DeMarco
analyst

Yes.

J
Jorge Durant
executive

And this is subject, of course, to the current FX restrictions in country. The government has consistently been signaling lifting of those restrictions, but have not provided a date. As we know, Mr. Milei is a very pro-market President trying to promote investment into the country and the removal of those FX controls is central to that?

So, I mean, he indicates his priority -- lifting those FX controls is a priority, but he has not provided a date. For that, we believe the country is tracking in the right direction, but we still need to see some of those milestones. There are some positive signs there. The gap between the official rate and the parallel rate in the street has significantly narrowed. Country risk is coming down. But again, positive signs, but we're not -- we are still subject -- in the country, the country is still subject to those FX restrictions, right?

D
Don DeMarco
analyst

Okay. And do you have any opportunities to invest either at Lindero or in Argentina?

J
Jorge Durant
executive

Yes, absolutely. We -- well, one, we've been expanding our leach pad for the next decade. That has been a $42 million project that sets the mine, as I said, for a very long time for the life of reserves we currently have. And we have other opportunities in the Arizaro porphyry, in other properties in South, if that were to be the case. But we're looking at options. I think it's still very, very dynamic.

We are in a different situation than about a year ago, with respect to the government. The previous government -- for the previous government, removal of those FX controls was not a matter of discussion. For this government, it is a priority. So, now when it happens, it is something we're all looking and watching carefully, right? Consciously.

D
Don DeMarco
analyst

Okay. Then just one more question on the mining codes in or proposed changes to mining codes in [ Cote d'Ivoire ] and Burkina Faso. Have you been in touch with the government or have any dialogue with the government or have a sense of what the potential implications of these changes might be on either Yaramoko or Seguela or separately Diamba Sud?

J
Jorge Durant
executive

Yes. The answer is, we are in a very close and sometimes intense dialogue with both governments on the matter at a company level and also through the mining chambers that are quite active in both countries. And with respect to the changes recently enacted in Burkina Faso, they really do not impact us. Today, we do not see an impact to our business.

And with respect to Cote d'Ivoire, there is a different process being driven. I believe the authorities are doing the right thing. There is a draft, a new mining code being circulated and properly consulted with industry. And that's what's taking place right now, and we see that as positive. And I would say, if I have to characterize it, the process in Cote d'Ivoire has been far more orderly than what we've seen in Burkina Faso. But yes, we're very engaged. And right now, we don't see any dramatic change to our business in Cote d'Ivoire or Burkina Faso as an outcome of these changes.

D
Don DeMarco
analyst

That's all for me. Good luck with Q4.

Operator

The next question will be from [ John Pereira ]. John is a private investor.

U
Unknown Attendee

Jorge, yes, congratulations on a good quarter, to the team. From the last call, you reported that the leach pad, and I think you just mentioned that was a $42 million project, correct me if I'm wrong, was, you're expecting to complete the CapEx spend on that during Q3. And I think I heard earlier that that was going to extend into January of 2025. Can you just elaborate on what's still left to complete, not the details of the project, but in terms of the spend here in Q4 and -- so, how much more is left on that CapEx spend?

J
Jorge Durant
executive

Okay. Thank you for your question. The leach pad has a couple of key components. One is the availability of that real estate for placing ore, for leaching, right? So, that has been met even ahead of time in early-mid-October, right? So, we are -- the leach pad has been turned to operations and we're placing ore on the leach pad, right?

The second one is, there are some ancillary activities that don't impact the continued operations of the expanded leach pad. That will drag on until early 2025 and conclude with the mobilization activities of the contractor and whatnot in January, perhaps extending into February. But the key thing is that the leach pad is operational.

With respect to the leach pad amounts that we might see still coming into 2024, Luis do you have the updated figure?

L
Luis Durant
executive

Yes. Not in an isolated manner for the leach pad, but we can -- what we can say is that part of the payments expected in Q3 associated to the leach pad have -- are rolling into Q4. As Jorge mentioned, the project, for all material purposes, is on track. It's a matter of timing of payments, mostly. And the leach pad exclusively might be in the range of $10 million to $15 million, right, in Q4. The expectation that we had provided before with respect to a bit of the spend taking place in January hasn't changed for any significant purposes.

J
Jorge Durant
executive

Yes, it's about $10 million what we might see coming into Q4, in the range of $10 million. Yes.

U
Unknown Attendee

Okay. Yes, so you had $38 million of sustaining capital in Q3. Are you expecting any upward surprises then in sustaining capital here in Q4? Or are you expecting then that the sustaining capital cost should start to diminish as time goes on because essentially, this project is completing?

J
Jorge Durant
executive

Yes, that is the case. That is the case. As I said, we'll see a bit of a spillover into 2025, a few -- a couple of million dollars, something in the range of $4 million, $5 million and then something in the range of $8 million still attached to these final activities of the leach pad in Q4, yes.

U
Unknown Attendee

Yes. I'm just trying to get a sense for the cash flow number -- overall cash flow number and net cash flow. But anyway, just a second question, a follow-up on Burkina Faso. You mentioned in terms of the government noise about the licenses, it's really not going to affect Fortuna. And I think the understanding from the news release you put out on it was that those were just -- their impact would be just on new mines and new licenses being issued going forward. Is that kind of the sense that you're getting from the government?

J
Jorge Durant
executive

So, I believe you're referring to an unfortunate statement made by the President of Burkina Faso, Captain Traore, some weeks ago. Is that what you're referring to?

U
Unknown Attendee

Yes. Yes, that's correct.

J
Jorge Durant
executive

Yes. He was misquoted, really. What he was saying in that statement is that companies that do not comply with the new mining code could be subject to a cancellation of their licenses. And I think that as a general statement is something we're all subject to in many jurisdictions all the time. If you don't comply with the law, well, you're subject to cancellation of your concessions.

But I believe that statement was caught by Reuters and put out there without much context. We do not see, as I restate, any implication to our business from the mining -- new mining code or any actions that the government could take or not. I think the government of Burkina Faso, in spite of all the challenges the country is going through on security, humanitarian crisis and political instability, is quite receptive to the foreign mining companies in country, right?

If we -- if I need dialogue with the Minister of Finance, he is available; with the Minister of Mines, he is available; with the Head of National Security, he is available. So, all of that is going well.

U
Unknown Attendee

Okay. Yes. And then, there was another statement that was made earlier about the recovery of -- was that of VAT, I didn't quite understand, and is that in Burkina Faso? What -- can you just elaborate on what that was?

J
Jorge Durant
executive

Yes, yes. All companies are struggling to get the VAT recovery in Burkina Faso. That is not an inconsequential amount of money that's building up on VAT. For us, towards the end of the year, it's a figure in the amount of $40 million to $50 million. The government of Burkina Faso, I would say, up to a year ago, has been quite diligent in providing returns on VAT, but that has stopped.

As I said, the country is going through all sorts of crises, not only security, humanitarian, financial crisis as well. So, we did receive an advance on VAT within the last 3, 4 months, about $1.5 million. But it's trickling down, right? It's coming slowly, and it's building up, right, particularly at these prices.

U
Unknown Attendee

So, when you're reporting your cash flow numbers, are you accruing for these VAT numbers? Are they included and they're accrued or they are just not included in the cash flow number because you haven't recovered it yet?

L
Luis Durant
executive

It is included as a negative change in working capital, right? So, when we talk about free cash flow, it is considering the fact that we're seeing those delays in collecting VAT. Yes.

U
Unknown Attendee

So, is that part of the $25 million in receivables that was referenced? Is that VAT? And that -- which reduced...

L
Luis Durant
executive

Yes, that's correct.

U
Unknown Attendee

Okay. Okay, good. Al right. So it's not in -- you're not including it in your cash flow. It's affecting your cash flow. So that will come through whenever that comes through and be built into the cash flow at that time.

J
Jorge Durant
executive

That is correct, yes.

U
Unknown Attendee

Okay. And then the last question, I'm sorry for taking up so much time. But the last question with respect to San Jose. We didn't see any further drill results on San Jose, but I guess I'm going to assume that there's nothing meaningful that would allow the company to make the decision to continue to run the mine, a combination of higher silver prices and a new find. Has the company looked at potentially selling that mine versus, obviously, sustaining the closing costs that you're going to have to absorb over the next months or years?

J
Jorge Durant
executive

With respect to the first part of the question, we have stopped exploration at this stage. And as I stated during the call, we are planning to carry mining at least for 18 months because the mine, although it is exhausting the reserves we estimated a year ago, still has resources, right? The discovery of the Yessi Vein and resources at the Victoria Vein and other portions of the mine.

So, yes, we are updating those resources based on not only the current prices, but also the current exchange rate, which has moved in our favor. Current peso to the dollar is at around MXN 20 when a year ago was closer to MXN 16, right? So, all of those things do have an impact. But the way we see it is, it's just residual mining, right? We are always considering strategic options for the asset, yes. But independent of those that might come or not, we have a base case, which is the progressive closure.

U
Unknown Attendee

Okay. So, like the current [ strategy ], you're calling it a progressive closure, so you continue to mine on a reduced rate to help absorb whatever...

J
Jorge Durant
executive

18 months, pretty much. So we will -- we're winding down operations. We have a -- this year already, we executed a significant reduction in workforce. And concurrent with mining activities in 2025 and into 2026 that will be taking place at a reduced rate. We will be conducting also closure activities of ancillary facilities. We have 2 tailings disposal facilities. We have a dry stack facility and a conventional tailings facility.

We will be starting the work to close one of those. So, concurrent with the production at a smaller rate, there are a lot of activities that we can initiate. And at the same time, as I say, we keep the strategic options open, right? There are still remaining resources and exploration opportunities in a bigger property package that we have decided, for strategic reasons, not to pursue.

U
Unknown Attendee

Okay. Yes, and then the last point is, I think the -- I read the expectation is that the ongoing reduced mining operation will -- should cover costs. So, you're expecting that that mine is not going to be a cash drain. It's going to continue to at least breakeven during that 18-month period?

J
Jorge Durant
executive

We are doing a trade-off between a complete halt of production and just carrying the closure cost, which is a project, right? A closure is a project. So, you will be carrying a project that will be intensive in the initial 24, 36 months and then goes into more of a monitoring phase, right? So, we trade off a complete halt of operations versus that option, where the alternative is where we can continue doing some residual mining, generate some positive cash flows that help offset some of those costs that we would be incurring anyhow, right? Those project costs, if you will. So, in our estimate to-date, we see a benefit, an economic benefit of continuing with that residual mining while we concurrently do closure activities, starting with ancillary facilities, right?

U
Unknown Attendee

Okay. And then, you had accrued for the mining closure costs. I think it was $90 million several quarters ago. So, the effect would -- there would not be an effect on the net earnings number, just an effect on -- potentially effect on the cash flow number. Do you believe that what's been accrued on the balance sheet should -- will be adequate at this point?

J
Jorge Durant
executive

We are updating. We are currently, as I stated during the call, updating a feasibility level closure plan. And we anticipate that as an outcome of that with a bit more basic detail engineering on some of the closure activities, that figure will increase, right? So, the final study will be complete this fourth quarter, probably end of November, sometime in December, we should have the final numbers, but we can anticipate that that provision will likely increase, right?

L
Luis Durant
executive

To be precise, the numbers in the balance sheet for direct closure costs are in that $10 million range. The provision we carry in the balance sheet plus end of last year, we took a provision, a charge for $6 million of severance costs of which around $2.5 million have been spent. So, that is the amount that's currently in the balance sheet, something in the range of $14 million.

J
Jorge Durant
executive

Yes. We anticipate that number will increase, right?

U
Unknown Attendee

Okay. I [Indiscernible] I have to go back and look at that.

Operator

And the next question will be from Adrian Day from Adrian Day Asset Management. Your line is live.

A
Adrian Day
analyst

I had 2 questions, if I may. Sorry, one just quick follow-up if I may, I'm sorry about this, on San Jose. So, does the residual mining get -- does the cost of residual mining continue to show up as a cash cost of mining? And does it get included in your all-in sustaining costs? I'm obviously asking because with the lower production, those costs are going to go way up and it's going to affect your company-wide costs? Or does it just count as a -- sorry go on.

J
Jorge Durant
executive

No, no, that's a very good topic of question for us right now, and that's something we're looking into as we speak, Adrian. What would be the more adequate way to account for that income, right? The way we see it technically is, we have a closure project that's generating some income. We're even considering if we should include those ounces, which are small, in our guidance, right, in our 2025 guidance.

We're giving consideration to that. We're talking with the auditors. We're talking with -- we're analyzing that as we speak. I wanted -- we'll have more clarity when we provide guidance next year on how all of this is going to manage. But we did -- we've been telling -- sharing with investors, with analysts that we will be taking a position with respect to the future of San Jose in the third quarter.

And consistent with that is that we are advancing to [ you all ] that San Jose is going into closure, and that we have the opportunity to offset a significant portion of those closure costs in the initial 2 years by carrying some residual mining of resources that we have, which are high- grade, right? Some of the higher-grade resources updated to current exchange rate and prices do, we believe, provide an economic benefit to the project, right? Offsetting closure costs.

So, that is what we're advancing. But we certainly have a bit more work to do. As I said, we do not have final closure numbers yet. We can anticipate that it's going to be a number higher than what we currently have in the provision, as discussed with the previous caller. And how we're going to manage the reporting of those ounces or not is something that we're still figuring out.

A
Adrian Day
analyst

Okay. Okay. The second question, if I may, is on exploration. So 2 parts. One is, what is the proportion of your total exploration spend that is on new projects, new exploration projects? And then, do you look at new exploration projects when you're looking at a potential for a new exploration project, is it purely opportunistic or do you -- are you favoring particular regions? And I'm just hypothetically, because you'd like to rebalance a little bit more to Latin America from West Africa or are you favoring certain metals? Or is it purely opportunistic as to whether you take on a new project?

J
Jorge Durant
executive

I will start with the second part of your question and then allow Luis to provide the breakdown. But to answer the second part of your question, we have the benefit of being in different geographies and that we see opportunities emerge in all of them. And what we do, Adrian, is we rank them based on their own merit, on their own technical merit first. And then, depending on the nature of the opportunity, we decide if tactically it makes sense for us.

Strategically, we are very comfortable for the long term being in all the jurisdictions where we are, right? Now, tactically, there are places where we could commit to deploy more capital than others. Today, we clearly favor Cote d'Ivoire, Senegal ahead of Burkina Faso, or for any large capital investment, ahead of Argentina, right?

But our process, to help you understand it, is we first rank -- we see opportunities emerging throughout. We rank each one on their technical merit, and then we assess tactically if we can -- if it's an opportunity with hydrologic potential, but correspondingly low financial risk to the company, well, we can be a bit more adventurous on where we move or not versus opportunities that demand high capital commitments.

So, we do not gear or the opportunities, as always, we want to be more weighted towards Latin America now or more weighted towards silver or not? No. we rank the emerging opportunities on their own merits first.

Luis, on the breakdown?

L
Luis Durant
executive

Yes. So, just to try to answer that question in the most effective way possible, the only new project really where we're spending exploration dollars is Diamba. There is a bit of greenfields, $2.5 million, but the only new project really is Diamba. The bulk of our exploration budget is being spent in the areas around our existing projects, our existing mines, I should say, and mainly today, Seguela, right?

J
Jorge Durant
executive

But what goes -- we have a breakdown of sustaining versus non-sustaining?

L
Luis Durant
executive

Yes. If the question is between sustaining and non-sustaining in terms of what we would call brownfields exploration expenditures, around 1/3 today is staying in sustaining and 2/3 is being classified as non-sustaining. So we -- the objective of those budgets is to expand resources and the exploration camps, right?

J
Jorge Durant
executive

Yes. So -- yes, close to $15 million allocated to sustaining and the balance to non-sustaining, Adrian.

A
Adrian Day
analyst

Okay. Okay. I was thinking of new greenfields like, say, the joint venture or the earn-in you have with Riverside on Cecilia in Mexico. Is that all very, very small?

J
Jorge Durant
executive

Well yes, our -- as described by Luis, our largest greenfields project is Diamba. We have a total budget allocated to Diamba in 2024 in the range of $13 million total budget that includes exploration, engineering or owners' cost associated with being in country, managing the project. So, that figure hovers around $13 million, probably $9 million out of that is classified as exploration.

Operator

[Operator Instructions] The next question is coming from [ Peter Freeze ], who is a private investor.

U
Unknown Attendee

Congratulations on the solid quarter. My questions are regarding the normal course issuer bid, specifically the approximately $36 million that you had in funds that were to satisfy the 2019 convertible debentures and why none of those funds were then used to repurchase the 7,184,000 shares that were converted despite several many opportunities to repurchase those shares at below $5. And then also, what does this mean for the company's NCIB program going forward?

J
Jorge Durant
executive

Well, in terms of execution on the NCIB, we've been -- as you would expect, we've been managing it at the discretion of management based on the opportunities we see in the market. We have not committed publicly to any particular price. And I think all that's relevant to say on that point is that we will continue taking those opportunities as we see them in the market, given the restrictions we typically have around certain blackouts during the year. So, we -- I mean, with a specific reference to $5, I don't believe we've made any commitments again to any specific share price, right?

L
Luis Durant
executive

Our capital allocation priorities, I think, are clear. We've been first giving priority to providing the strength we need in the balance sheet. I believe at times like these, companies -- mining companies where we have no purchasing power -- pricing power, of course, need to work on the balance sheet. And that's something we've been doing after many years of capital-intensive phase, right?

It's the first time we pivot into a net cash -- net positive cash position in several years. So, with that, it's a set priority that strengthen the balance sheet and return to shareholders, of course, for us, it's not a question of when -- of if, but when. And we have in place the NCIB and be sure that we are keen to provide at the right time, returns to our shareholders, right, via the buybacks or the institution of a dividend policy. That's something that's being analyzed and discussed at the Board level at this time.

Operator

And there were no other questions from the lines at this time. I would now like to hand the call back to Carlos Baca for closing remarks.

C
Carlos Baca
executive

Thank you, Paul. If there are no further questions, I would like to thank everyone for listening to today's earnings call. Have a great day. Bye.

Operator

Thank you. This does conclude today's conference, and you may disconnect your lines at this time. Thank you for your participation.

J
Jorge Durant
executive

Thanks, everyone.