Good morning, ladies and gentlemen. Welcome to the First Quantum Minerals Quarterly Results Conference Call. I would now like to turn the meeting over to Bonita To, Director, Investor Relations. Please go ahead, Ms. To.

B
Bonita To

Thank you, operator, and thank you, everybody, for joining us today to discuss our third quarter results. Before we begin, I will draw your attention to the fact that over the course of the call, we will be making several forward-looking statements. I encourage you to read the cautionary note that accompanies our most recent MD&A and the related news release as well as the risk factors which are detailed in our most recent AIF and available on our website and on SEDAR. And a reminder that the presentation which accompanies this conference call is available on our website. On today's call, we have Tristan Pascall, our Chief Operating Officer, who will provide an overview of operations and share his perspective on the company's outlook moving forward. Hannes Meyer, our Chief Financial Officer, will review the financial results, and Tristan will wrap things up with an overview of our key strategic priorities. After that, we'll open the line to take questions. And with that, I'll turn it over to Tristan.

T
Tristan Pascall
Chief Operating Officer

Thanks, Bonita. Hello, everyone. Q3 was another strong quarter for First Quantum, both financially and operationally. Debt reduction remains a major focus for First Quantum. I'm proud to say that with the strong operational cash flows during the quarter, driven by continued high operational performance and supported by commodity prices steadying at higher levels, plus the rolling off of our hedges and combined with the closing of the sale of the 30% stake in Ravensthorpe, we were able to reduce our net debt by approximately $450 million during the third quarter. We are well on our way to achieving our objective of $2 billion in gross debt reduction on an accelerated time frame within the first half of 2022.Before going into the operational performance during the quarter, I would like to take this moment to reiterate 2 of our other commitments that we have made to our stakeholders. Firstly, we are on track to deliver targets for our greenhouse gas emissions by the end of this year. And during the quarter, we introduced an internal carbon price that will now be integrated into the evaluation of new projects at First Quantum. In addition, we remain committed to defining a more meaningful dividend framework for our shareholders by the start of next year. Operationally, copper production in the quarter was just shy of 210,000 tonnes, an increase of 5% quarter-over-quarter, mainly attributable to strong production from Cobre Panama and Sentinel, but also ongoing consistent production from Kansanshi. Due to a difficult shipping environment, our copper sales in Q3 was somewhat lower than production at just over 197,500 tonnes. In particular, anode shipments in Zambia were impacted by a global shortage of container shipping capacity as well as congestion at the Durban, Walvis Bay and Dar es Salaam port. Consequently, a number of planned shipments were rolled into the fourth quarter, but these have now been caught up and shipped.We do expect shipping and logistic challenges, in particular in relation to Zambian sales and finished goods inventories to continue throughout the first quarter, although we will continue to address these directly through our relationships with customers and shippers. Some marginal impact from logistics, shipping, fuel and consumable costs and labor has been felt on operating costs in Q3. Our C1 cost guidance for the year has been narrowed by 0.005 -- sorry, by $0.05 to $1.25 and $1.35 per pound. However, our all-in sustaining cost guidance for 2021 of $1.80 to $1.95 per pound remains unchanged.At Cobre Panama, it is very pleasing to see the operation continuing to achieve new milestones with production in Q3 reaching a quarterly record of over 87,000 tonnes of copper. During the quarter, some portions of higher grade ore from the mine were brought forward from the fourth quarter in order to smooth the copper production profile and derisk the remainder of the year. Grades are expected to be lower in the fourth quarter. However, given the level of confidence in production, we have increased the lower end of the range for Cobre Panama guidance by 10,000 tonnes. So the overall guidance of 2021 production is now 320,000 to 335,000 tonnes of copper. With the recent escalation in global energy prices, including thermal coal, it is worth mentioning that a collar structure for all of Cobre Panama supply requirements has been in place since May 2020, with the same price rates at the end of Q2. This prevents exposure to further increases in the coal price until December 2023. In parallel, we continue to study options moving the energy supply for Cobre Panama to a less carbon-intensive and more renewable mix over time. I'm also pleased to share that due to the high vaccination rates at Cobre Panama being around 97% of the workforce. As of October 11, fully vaccinated employees are no longer required to enter -- preventative isolation prior to arrival to site. In addition, the limit on the number of personnel on site has been lifted, which now allows the operation to return to optimal staffing levels. With regard to Law 9 discussions, we continue to be engaged in formal discussions with the high-level ministerial commission and constructive progress has been made. The government's commitment to the process is evidenced by the contribution of 4 cabinet ministers to the commission meetings throughout the month of September.At the end of the quarter, the Ministry of Commerce publicly announced the culmination of discussions on environmental and labor matters, while discussions on financial matters were continuing. The company welcomes the transparency, the high-level commission process and the opportunity to resolve this matter in the medium term. In Zambia, Q3 marked the general elections in the country and a smooth transfer of power to the opposition party, the UPND, and to the new President, Hakainde Hichilema. We welcome the display of healthy democracy demonstrated so well by the country and its citizens. We look forward to working with the new government on their objectives of empowerment through economic management, job creation and democratic governance and in their stated desire to partner with the mining sector to significantly increase copper production in Zambia.The expected 2022 budget announcement at the end of this week will provide us with initial indication of the policy that will accompany these objectives. Sentinel delivered its best quarter of the year in Q3 and produced 59,931 tonnes of copper, up 10% from the previous quarter. A record milling rate was achieved in the month of August and improved ore grades were processed in September and we expect these trends to continue into the fourth quarter. As a consequence, the guidance range for full 2021 production from Sentinel has been narrowed to between 235,000 tonnes and 245,000 tonnes of copper. The fourth in-pit crusher at Sentinel is scheduled for commissioning in December 2021, which will enable the process plant to ramp up throughput to 62 million tonnes per annum. Kansanshi produced another consistent quarter, albeit on lower grades with copper production of 50,987 tonnes, which was the best in the year so far. The Kansanshi smelter ramped up on schedule in early July and process just over 325,000 dry metric tonnes of copper concentrate during the quarter.We continue to expect Kansanshi mining grades to remain lower in the fourth quarter. And consequently, we have reduced the top end of the range for Kansanshi guidance by 10,000 tonnes, so that overall guidance of 2021 production is now 200,000 to 205,000 tonnes of copper for the year. Zambia's electricity generation is largely hydropower and so remains somewhat insulated from the energy dynamics currently playing out in other parts of the world. The level of water supply in the Kafue and Kariba systems remain stable, and we're confident in the outlook for power supply for the remainder of the year. COVID-19 border -- COVID-19-related border closures and labor shortages in Western Australia continued to impact Ravensthorpe during the third quarter, which negatively impacted the quarter's production and costs. Despite these challenges, commissioning of Shoemaker Levy at Ravensthorpe progressed and saprolite ore was introduced in the third quarter. Due to delays accumulated to date, 2021 nickel production has been revised lower and costs have been revised higher from prior guidance.Completion of construction and commissioning works at the Shoemaker Levy project and the delivery of limonite ore is the main priority for the fourth quarter of 2021. I would like to express my gratitude to the First Quantum team for their hard work throughout the period of the global pandemic. In all of the countries that we operate in, we continue to work closely and support the various levels of government and health authorities to ensure the health and safety of our employees. COVID-19 continues to present challenges, and it remains a top priority for First Quantum to provide support to our local communities, particularly the most vulnerable. As an example, in Zambia, when schools that are around our Kansanshi mine closed during the pandemic, First Quantum helped transition students to remote learning via 2 FM radio stations. Teachers from around the region were broadcasting 12 hours a day and have been able to engage some 42,000 students across the period. During these challenging times, I'm not only proud of the accomplishments of our operations but also the work we have done with our local communities who are so important to our growth success. With that, I'll turn things over to Hannes, and I'll be back in a few minutes to wrap things up. Hannes?

H
Hannes Otto Meyer
Chief Financial Officer

Thanks, Tristan, and good day to everyone. I would like to direct you to a slide called Financial Overview on Slide 10 in the presentation. The financial performance in the quarter was driven by higher metal prices, together with strong operational performance, which resulted in a significant increase in comparative EBITDA and net earnings as well as a notable further reduction in net debt. Gross profit of $613 million and comparative EBITDA of $886 million in the quarter were significantly higher than the same period in 2020, attributable to the increase in sales volumes at Cobre Panama as well as a 34% increase in the net realized copper price. Net earnings attributable to shares of the company of $303 million and comparative earnings of $197 million represented a significant improvement on the same quarter of 2020. Net debt decreased by $449 million this quarter, and it's now at $1.4 billion reduction since June 2020, down to a level of $6.3 billion as at the end of September. With the current strength in the copper price, we foresee a further reduction in the last quarter of this year. Cooper C1 cash cost of $1.26 was $0.19 per pound higher than the third quarter of 2020, driven by higher fuel costs and freight charges and also lower production at Kansanshi, Sentinel and Las Cruces. The company has completed the sale of the 30% equity interest in Ravensthorpe for cash consideration of $240 million from POSCO. Post quarter end, on October 14, the company signed a new $2.925 billion term and revolving credit facility with its bank groups.Turning to the next slide on quarterly unit cash cost. Total copper C1 cash cost was $0.19 higher than Q3 2020, driven by higher fuel and freight charges and also the lower production, as mentioned before. Guidance on unit costs for the full year has been narrowed to between $1.25 a pound and $1.35 per pound. All-in sustaining cost for the quarter was $0.39 higher than Q3 2020, impacted by higher C1 costs and higher royalty rates in Zambia, which was driven by the higher market copper prices. All-in sustaining cost guidance remains unchanged. Turning to the next slide and the financial overview. Comparative EBITDA of $886 million was 38% higher than Q3 2020 attributable to a 34% increase in net realized copper price and increased sales volume at Cobre Panama. However, as Tristan mentioned earlier, Zambia sales volumes were impacted by port congestion and global shortages of containers, and we see such logistical challenges continuing throughout the fourth quarter. Comparative earnings for the third quarter of $197 million is an increase of $133 million compared to Q3 2020.Basic earnings per share of $0.44 and comparative earnings per share of $0.29 or $0.40 and $0.20, respectively, higher than the same quarter last year. Basic earnings benefited from unrealized foreign exchange gains in Zambia. There was a reduction in the net debt, as previously mentioned in the quarter, which brings this total reduction down to $1.4 billion since June 2020. Turning to the next slide, significant increase in gross profit. With a $267 million increase in Q3 gross profit from improved metal sales and higher contribution of Cobre Panama, it was impacted by the lower sales in Zambia and Las Cruces, which sees open-pit mining in August 2020. Turning to the slide on debt and the liquidity profile. Company's net debt of $6.3 billion at the end of the quarter, as previously stated, decreased by $1.4 billion in the last 15 months. The company ended the quarter with $1.9 billion of net unrestricted cash and cash equivalents and was in full compliance with all its financial covenants. Company signed a new $2.925 billion term loan and revolving credit facility maturing in September 2025. This replaced the existing $2.7 billion credit facility. The refinancing extends the debt maturity profile and removes all material debt maturities through April 2023. As Tristan has already highlighted, the tapering of the hedging program will further benefit financial results in the remainder of the year. So turning to the hedge slide then. So approximately 1/6 of our expected copper sales for the next 12 months are hedged at an average floor price and average ceiling price of $3.41 per pound and $4.23 per pound, respectively, and this is a blended rate between the swaps and the collars. So turning to the -- and this compares then to approximately 1/4 in the previous quarter of sales at an average price, which is probably about 4 and ceiling of probably about 10% on average lower. At the end of September, the company had 12,500 tonnes of forward -- and margin copper forward sales at an average price of $3.01 per pound, for periods of maturities through December this year. In addition, the company had 125,750 tonnes of unmargined 0 cost copper collar sales contracts with maturities to June 2020 at a weighted average price of $3.45 per pound to $4.35 per pound.Thank you. And with that, I'll now hand back over to Tristan.

T
Tristan Pascall
Chief Operating Officer

Thanks, Hannes. As debt reduction at First Quantum accelerates, we have stated our intent to post more meaningful dividends based on our outlook for solid cash flow generation from the business. Notwithstanding these intentions, delivering growth has always been one of First Quantum's core competencies and reinvesting in the business remains central to our business strategy. In this regard, we are focused on our 4 main low-cost and low-risk brownfield projects in the near term. These 4 brownfield projects, which we've presented in the slide deck today are the expansion of Cobre Panama to 100 million tonnes per annum throughput; the S3 expansion at Kansanshi; the Enterprise nickel project near Sentinel; and the Las Cruces underground project. In many ways, the variety of these projects reflect the ongoing diversification of our business, spanning 3 continents, a mix of both copper and nickel, a mix of both open pit and underground. What they all have in common is that they leverage existing infrastructure, operating teams, existing license to operate and strong community relations. This reduces both the completion risk and the capital intensity of these near-term growth projects for us. Progress was made on all 4 of these projects during the quarter. The Cobre Panama preparation to move to the Colina pit, which will support the 100 million tonne per annum expansion continued in Q3 with initial groundbreaking for development of the Colina box cut and ongoing development of the overland conveyor corridor. Orders for the additional mine fleet for Colina were placed at the front end of quarter 3, including a fifth Komatsu P&H 4100 rope shovel and 8 of Liebherr ultra-class 360 metric tonne trucks during the quarter. On S3, discussions continued with the Zambian government in relation to the stable fiscal conditions required to proceed with the expansion, including addressing the nondeductibility royalties. Once built, S3 will materially increase Kansanshi's annual throughput to well over 50 million tonnes per annum and ensure production levels remained strong for more than 20 years.At the Enterprise Project, the decision to proceed is expected by the end of this year. The process plant for Enterprise is already built as part of the original Sentinel construction and so capital spending of approximately $90 million is mostly comprised of pre-strip work, which is scheduled for the dry season after April 2022. The enterprise project has the potential to add 30,000 tonnes per annum of nickel with production likely to ramp up from early 2023. Work towards fully permitting Las Cruces underground continues. The last major permit remaining is for the water concession and progress on this permit is expected in an orderly manner. Resource delineation drilling was completed in Q3, which will support the release of NI 43-101 resource state by early next year. Our portfolio of growth options include several major greenfield opportunities, notably Taca Taca and Haquira. And while we are excited about the long-term potential that they offer, we will take a more measured and cautious approach towards these 2 projects as our priorities remain on debt reduction, brownfield growth and establishing a more meaningful dividend for investors. Finally, on behalf of the entire company, I want to thank our people again. Our workforce continues to demonstrate adaptability, commitment and resilience and make significant contributions to the success of the business and our positive impact on the communities around us. I'm proud of how our workforce has continued to focus on executing in a safe and sustainable manner in the face of ongoing logistical and operational challenges resulting from the COVID-19 pandemic. Operator, we would now be happy to take questions.

Operator

[Operator Instructions] The first question is from Orest Wowkodaw with Scotiabank.

O
Orest Wowkodaw

Tristan, I was hoping you can give us some more color on the Law 9 negotiations in Panama. And specifically, whether you're seeing anything that might be outside of the existing mining code. And I'm also wondering if you can give us an expected time line for the conclusion of these negotiations.

T
Tristan Pascall
Chief Operating Officer

Sure, Orest. Look, Law 9 has been very constructive during September and -- Law 9 was very constructive during the quarter. We managed -- and you saw the announcements from the Minister of Commerce that on the culmination of matters relating to environmental issues and also on labor issues and the work on the financial side of things is continuing. There has been noise around that, and you would have seen that in the press. But in the discussions, it's been constructive. And look, I can't really be drawn on too much else that it's in that room. In terms of timing, we're optimistic that it's gaining momentum off the back of the commitment from 4 senior ministers in the cabinet, that's fully 1/3 of the cabinet that's been present in those discussions and also the movement in the discussions themselves. So it is difficult to draw a time line around that, but we would hope to be in parliament with a piece of legislation, I think, early in the new year, if not before. And that would then be a timetable around the ratification of that new legislation.

O
Orest Wowkodaw

And just as a follow-up, is there anything left to negotiate beyond fiscal terms at this point?

T
Tristan Pascall
Chief Operating Officer

Yes. We had some discussion around sort of social infrastructure, but it's part of those discussions at the moment.

Operator

The next question is from Abhi Agarwal with Deutsche Bank.

A
Abhinandan Agarwal
Research Analyst

Congrats on a solid set of results, team. I have a couple of questions, please. The first one is on hedging. While the amount of hedges, which were put on were quite small, should we expect continued opportunistic hedging going forward? That's my first question.

T
Tristan Pascall
Chief Operating Officer

Thanks, Abi. Hannes, do you want to take that question?

H
Hannes Otto Meyer
Chief Financial Officer

Sure. Abhi, what I would expect is that the average amount of hedges continuing to decrease. So last quarter, we were at 25% or 1/4 hedged. And this quarter, we ended at 16% hedged or 1-6. So you should see that trend continuing.

A
Abhinandan Agarwal
Research Analyst

Got it. The next question I had was regarding the Zambian budget, which I think is this slide. Could you talk a bit about what your expectations are with the budget? And also, what would you look for as you move closer to the decision to improve the Kansanshi S3 project?

T
Tristan Pascall
Chief Operating Officer

Thanks. Yes. Look, we certainly will be listening on Friday. Obviously, we couldn't comment what will be in the budget other than to say we've had the constructive discussions with the government. And certainly, in terms of everything that we've heard in their conversations with us privately, but also more broadly, conversations with the IMF, with the U.S. and the reengagement with the U.S. and the UN and so on has been very constructive. But really, I think the budget is where we'll start to see that policy enter the implementation phase, and that's what we're watching. Beyond that, yes, S3, as we said, is really around fiscal stability in the country. Again, nondeductibility of royalties is high on their list, but there's a broader range of issues to be tackled there, and that's what the conversation is around. So it won't necessarily follow from the budget and automatic move on S3, there is a broader discussion to occur.

Operator

The next question is from Greg Barnes with TD Securities.

G
Greg Barnes
MD & Head of Mining Research

Tristan, you talked about renewable power for the expansion at Cobre Panama. I'm not sure what avenue you go down. But what's a realistic time frame for converting the current coal plant? And what is the plan at the initial stages? And how much will it cost?

T
Tristan Pascall
Chief Operating Officer

Sure, Greg. And yes, I mean, the first thing is, we will come out later in the year and make that clear. In terms of the increment that's required for the expansion, it's about 60 to 80 megawatts, something in that range. And for that, we said that we won't be expanding the existing coal-fired power station in order to cover that additional increment. And so there is the opportunity for lower carbon or renewable to come into the mix, and so certainly, we're out in the market on the moment on that. And then more broadly, look, and I wouldn't want to preempt what we do and what we say at the end of the year, but we've been looking very closely at how we can then expand and address the broader greenhouse gas emissions from the power station, the existing unit. And there isn't -- the mix in Panama is there. There's a range of hydro wind power is there, but it's sort of around 30% available across the year and solar less at about 15%. So there's no silver bullet there, and it's important to bear in mind our impact on the national grid in terms of pricing if we fully came off. So those are the considerations that come together, and we'll outline more specifically by the end of the year.

G
Greg Barnes
MD & Head of Mining Research

Can you convert the coal plant to LNG or something like that? I have no idea whether that's even possible?

T
Tristan Pascall
Chief Operating Officer

Greg, yes, it can be converted. It's very capital-intensive. But yes, there's a technical solution and has been done elsewhere. So the actual conversion of the units themselves is straightforward, but then you have to install all the gas infrastructure in order to be able to do that. That's obviously the ability to offtake gas and the storage and so on, and then that gets quite -- there's a lot of capital on that. So there is gas already in Panama at another location in Colon. And so part of the consideration is where that would be more capital efficient at an existing facility that has gas and needs power lines, but is there as compared to a full adjustment to our facility.

Operator

The next question is from Lawson Winder with Bank of America Securities.

L
Lawson Winder
VP & Research Analyst

I would like to touch on your outlook for Cobre Panama. You provided some comments, but basically going back to Q2 results, you guided to 10% lower grades in the second half versus H1. Obviously, Q3, with anything but that, it was actually a little bit higher at 0.46%. So can you maybe just give us a little bit of help understanding why there was such a material upside surprise in the grade, but also should we be expecting a fairly substantial drop-off in Q4 '21? Any quantification around that would be super helpful.

T
Tristan Pascall
Chief Operating Officer

Yes. Thanks, Lawson. I think I remember our conversation at the time. Yes, I guess -- so what we see -- what we've done in this quarter is bring forward some areas of higher grade in the pit, and that was to derisk the end of the year. So what we were seeing was our copper production schedule showed a very high peak in December. And rather than put that in a time which is a higher rainfall part of the year, we brought that forward and put it in the bank. So that's in the bank in Q3 now. And as a result, we will return to the sort of more life of mine grades and it will come off. But as I said, we nonetheless are very confident in the guidance that we've given for the year, and we fully expect to be within that guidance. We will see throughput go up a little bit, we expect, because it's sort of softer material compared to where we've been mining this quarter, on average, but lower grade. Does that help answer the question?

L
Lawson Winder
VP & Research Analyst

Yes. That's very helpful. And then maybe on a follow-up, I would like to ask about Sentinel. So you've provided some guidance again on 2022. You expect Sentinel to reach 62 million tonnes per annum run rate next year. What -- how should we think about the timing on the 62 million tonnes per annum? I mean, is that something you can hit basically from the start of the year? Or should we think of it being obtained sometime sort of mid-year?

T
Tristan Pascall
Chief Operating Officer

No, Lawson. It was in the introduction of the fourth crusher that just opened up our ability to deliver into the process plant and the process plant can certainly take it. So as soon as that fourth crusher comes in and is feeding, we have the capacity to run at that annualized rate. So we expect that to be commissioned by the end of the year, and then it would just be into production. So there might be a small ramp-up at the start of the year, but we should be on those rates or that kind of annualized rate fairly early in the new year.

Operator

The next question is from Jackie Przybylowski with BMO Capital Markets.

J
Jackie Przybylowski
Analyst

And congrats on the quarter. It's a great quarter. I guess I wanted to ask you sort of how you're looking at the balance sheet now. I mean, it's in much better shape. I recognize you're still adding hedges. Can you maybe talk a little bit about what balance sheet you'd need to see to fully stop adding hedges? And I guess on the same page, like, where you're maybe thinking of the dividend at this point in terms of, like, how much the balance sheet could support next year?

T
Tristan Pascall
Chief Operating Officer

Sure, Jackie. Hannes, do you want to take that question?

H
Hannes Otto Meyer
Chief Financial Officer

Sure. Jackie, I think I've largely answered already that, look, we'll see that trend -- reducing sort of trend continuing. So as I said, 1 quarter last -- 1 quarter H, last quarter, and now we're at 1-6 now, and that should roll off now in the next -- as we go along, that should come down.

J
Jackie Przybylowski
Analyst

Sure. And I guess -- I mean, I think, I asked you the same question last quarter, and I think you kind of suggested that -- and maybe I just misinterpreted what you said that you weren't adding new hedges. So I was expecting just to see the existing hedges roll off. But is it fair to say you'll add more going forward as well?

H
Hannes Otto Meyer
Chief Financial Officer

Jackie, the hedges we've had this year were all collars and all quite wide. So it shouldn't be an impediment to receiving the current spot price. So that wouldn't be, but overall there's [indiscernible] and reduction on that. I think, Tristan -- I mean I could just -- on the dividend, I think we'll have an update early next year. Tristan, I don't know if you want to take that?

T
Tristan Pascall
Chief Operating Officer

Yes, Hannes, I think, Jackie, we just say we'll stay tuned. And what we're saying is that the nominal dividend that we've been paying we're aware of that, and it is the Board's intention to come and address that with shareholders.

J
Jackie Przybylowski
Analyst

Okay. Maybe in the meantime, until we get the full update from you. Can you give us a picture of sort of what copper prices you guys are assuming for next year? Is that a fair question?

H
Hannes Otto Meyer
Chief Financial Officer

It's somewhere above the BMI price, I would guess.

T
Tristan Pascall
Chief Operating Officer

Yes, Jackie, we're trying to strike the balance there on that dividend, and that will be cautious. We'll enter that slowly. But what we're signaling is the cash flow generation that we see coming from the business.

Operator

The next question is from Chris LaFemina with Jefferies.

C
Christopher LaFemina
Senior Equity Research Analyst

Congratulations on another good quarter. Good to see deleveraging really starting to happen now the cash flow kicking in that should be good for your stock price. But a question I have regards cost inflation. So we hear a lot about mining cost inflation in places like Australia and Brazil, but not so much about what's going on in Panama and Chile -- I'm sorry, Panama and Zambia. And if we look at your unit cost progression, so far through 2021, your costs have been pretty flat. I know third quarter costs were up pretty materially on a C1 basis year-over-year, but cost this year have been -- net cash costs have been flat despite the streaming deals you have on gold. You're not getting the benefit of higher gold price and despite, again, the fact that you have shipping issues and energy prices rising and all sorts of inflationary pressures. Just trying to understand how we should think about costs heading into 2022? Is there a reason to believe that some of the inflationary pressures that we're seeing in mining globally will begin to impact you in the near future? Or what is going on specifically potentially in Panama or Zambia or with you specifically in terms of how you're managing your operations to control cost inflation that others are struggling more with.

T
Tristan Pascall
Chief Operating Officer

Chris, thanks for noticing. Yes, there's been a lot of effort and talking to the guys in Zambia in the last few weeks around the efforts that are going in on managing those costs. So yes, you saw Kansanshi. It is the most production in the quarter this year, but there's been a lot of work on the cost side to manage that. And so really, that's been the impact. The ability for us to protect that into 2022, I think that remains to be seen. So the cost inflation is definitely there, and we're seeing that on things like steel price, you mentioned shipping, fuel costs. You mentioned labor, particularly in Australia labor rates. In Zambia, there has been a movement of the kwachas. So we went down to the exchange rate at around 23, that's come back to 16 or 17 now. And so that is having an impact there on labor rates. The work that we've been doing is really with our big suppliers, in terms of managing that and the contracts that we have with them and that's been the effort that's gone in. I think where we're most seeing it is on capital projects. So certainly, Ravensthorpe is an early receiver has seen that on things like steel price and shipping. And as we look, I guess, we would telegraph that we're seeing that, and we'll address our capital guidance early in the new year. And what we would telegraph is that definitely, it's a cost inflationary market at the moment, and it's on all of those main inputs around capital projects.

Operator

The next question is from Ian Rossouw with Barclays.

I
Izak Jan Rossouw
Director

I maybe just wanted to follow up on Greg's question on the power station at Cobre Panama. Tristan, you mentioned sort of noise around the Law 9 discussions. And I wonder if that's referred to the Energy Minister's commentary around ending coal imports in 2023. I'm just sort of curious what's your view on that and how that sort of -- if that was actually part of the discussions with the other 4 cabinet ministers. And then maybe just a follow-up on Ravensthorpe. You mentioned in the release sort of cost inflation pressures from higher sulfur prices. I just wanted to get an insight into your sort of contract structure there, how much spot exposure do you have? And I guess if there's a lag effect we will see coming through from next year on higher sulfur prices.

T
Tristan Pascall
Chief Operating Officer

Thanks, Ian. So the first question on coal imports. Yes, certainly, look, we wouldn't comment on the government's planning around greenhouse gas emissions. Panama will go to COP26, the President of Panama will be there on Monday, and we'll talk about Panama being 1 of the 3 countries in the world that is negative in terms of greenhouse gas emissions. So that's where Panama stands today. And look, our planning, it certainly takes into cognizance of the endeavors of the government of Panama, but it also needs to balance our impact on the community, and I talked about possible impacts on pricing and so on and also the stability of the national grid, and we're seeing that in Europe at the moment. That when -- that these things need to be managed well. So those are the considerations we take and, as I said, will come out by the end of the year to comment on those. So there were those comments in the newspaper, and it certainly is part of a discussion, and that's fine. We're happy to do it in that forum. But the planning there, and we'll look to align our planning with the government's own ambitions on Greenhouse gas emissions. In terms of Ravensthorpe and the sulfur price, at the moment, as far as I'm aware, it's 100% exposure to the spot price. It's something that we're actively managing with our suppliers and looking to -- given where sulfur price has gone to certainly well above what we've expected. And I think that's -- Ian, in this, you're seeing some of the secondary impacts of the change to renewables is that fertilizer, food production, all of those things, there's going to be a lot of ripple effects through the economy, and I'm not sure that all of those are taken into account in the way economists are looking at the situation. But yes, certainly for us, an area to work closely on, and we're certainly doing that directly with our suppliers.

Operator

The next question is from Ioannis Masvoulas with Morgan Stanley.

I
Ioannis Masvoulas
Equity Analyst

Most have been answered, but I'd like to ask on Zambia and that's very ambitious target by the new government to hit 2 million tonnes of copper production by 2026. Given that you have operated in the country for a number of years, and you've been in touch with the government. Could you share your views on how realistic that target is? And also whether First Quantum could play a role here beyond the S3 expansion and beyond enterprise?

T
Tristan Pascall
Chief Operating Officer

Sure, Ioannis. Yes, I think the Zambian government had put on record, they'd like to see copper rise 2 million tonnes per year, if not 3 million tonnes per year. And so those are certainly ambitious targets. As I said, the new government came in on a platform of really jobs and youth empowerment, and that's important. And they have a challenge on their hands. As you look at the debt situation in Zambia, there's certainly going to be challenged to cover all that ground. And I think this budget will be an indication as to where they're going, but not an easy task in managing a default situation with the IMF and then coming out and spurring that growth. But their program seems to be very constructive in terms of the economy and delivering through the economy to their electorate, but let's see. In terms of our contribution, I mean, we would say that we're very willing to support Zambia, and we believe we're one of the strongest spokespeople out there for Zambia, and it's a destination for investment and a destination for mining. So certainly, we're part of that future, and we think S3 is an important part of that future. Beyond that, if you're intimating at Mopani or the situation at the dam, so that's not something we're entertaining at the moment at all. But more broadly, in the country, we will continue to remain a strong supporter of Zambia and its ambitions.

I
Ioannis Masvoulas
Equity Analyst

Okay. That's clear. And the second question around your funding mix. You recently refinanced your bank debt. And I just wanted to figure out what's the next sort of prerequisite before or milestone before you look to refinance some of the bond maturities? And ultimately, are you happy with the current mix between bond and term debt and bank loans? Or is there potential to shift that as leverage continues to come down?

T
Tristan Pascall
Chief Operating Officer

Hannes?

H
Hannes Otto Meyer
Chief Financial Officer

Sure. You would have seen them, and we've talked about $1.4 billion net debt reduction over the last 15 months. So with the new facility, we'll definitely use some of that proceeds then to start chipping away at the bonds. The first bond maturity is only in April '23. So there's quite a bit of time before that. So we generate quite a bit of cash at the moment, and we've got the benefit of the new facility as well. So we'll start managing those maturities coming up now.

Operator

The next question is from Emily Chieng with Goldman Sachs.

E
Emily Christine Chieng
Associate

My first question is just around the disruption in shipping that you noted during the third quarter. Maybe do you expect those volumes that have been produced but not shipped to drive a catch-up in sales volumes in the fourth quarter? Or do you expect still a little bit of a mismatch given some of the port congestion challenges you're seeing there?

T
Tristan Pascall
Chief Operating Officer

Thanks, Emily. Yes, I think we said that we'll continue to see those challenges through the fourth quarter. So look, we're directly managing it and that -- so we have our own trading desk that manages that logistics chain and then all the way through to the customer. And we've been working not just on an exclusive basis, also with the others in the region that are similarly challenged. So it is a -- the region and then the world is challenged by this at the moment. And our customers, it's part of something that they need to resolve as well in terms of getting the shipments in through the front door. So it's covering the whole supply chain. At this stage, yes, it's -- Q4 looks as hard as Q3. And the indications are, when you speak around the market that, that's expected to continue on into 2022. So we don't -- I guess, we're telegraphing. It will continue to be at these levels through the end of the year and maybe into the next year, but it's certainly something that we're directly managing. And because of that management in our business, it's not as high as it might otherwise have been without the sort of the day-to-day in the trenches fighting to get our containers on to ships.

E
Emily Christine Chieng
Associate

Got it. That's really clear. And maybe shifting gears a little bit. How should we think about the partnership between First Quantum and POSCO. I think when 30% of the Ravensthorpe asset was sold down, it was mentioned that an MoU was signed around the path to producing battery cathode materials. How should we think about that program?

T
Tristan Pascall
Chief Operating Officer

Thanks, Emily. Yes, we did sign that MoU, and we're very excited by the opportunities in that batteries, metals and batteries chain. We think that Ravensthorpe is very well positioned in terms of being an ESG-friendly and delivering a product that's well liked by the market and well recognized. It's at a very early stage, the discussions with POSCO around that are really picking up from the completion of the deal and so on. But it's something that is an active piece of work for us.

Operator

The next question is from Ralph Profiti with Eight Capital.

R
Ralph M. Profiti
Principal

Two questions. My first one is on Sentinel. In addition to the 62 million tonnes a year, we're also seeing some work being done on flotation. And just wondering is that really just positioning the back end of the plant for the higher throughput? Or could we see some recovery improvements? When I look at the 62 million tonnes a year, it doesn't take much to get you to the upper end of that guidance range at Sentinel. Just wondering what we could see on recoveries as well.

T
Tristan Pascall
Chief Operating Officer

Sure. Ralph, the work there on the flotation circle is really on the column cells and that was around improving our concentrate grades. It was done during the last year or so. And that was really in order to optimize the transport of feed to the Kansanshi smelter and also to make sure that we are in the right mix of the carbon in -- that feeds into that smelter. That's been done very well. And that program, we're now rolling over to Kansanshi. Kansanshi is similarly upgrading its cleaner circuit and also columns in Jameson's around that cleaner circuit for the same purpose. That just allows us to optimize feed into the smelter and get the optimal -- because it's limited by feed rather than copper production. And so that allows us to do that. Sentinel, in terms of upside on recovery, I think the guys would be cautious to talk too much beyond where they are, but they've done extremely well over the last few years to manage what they call ore Type A and ore Type B, which is the sort 2 major feeds that we see around the different weathering in the pit. And they've done a terrific job over the last 2 years in getting to the levels of recovery. Beyond where they are now, I think they'd be cautious to add much around.

R
Ralph M. Profiti
Principal

Got it. And then my second question, Tristan, is on flexibility for S3 expansion CapEx, depending on what we hear tomorrow from Zambia. I'm just wondering -- there's a little bit of smelter CapEx in 2021, '22 and '23, a bigger chunk of CapEx in 2023. Could we see some bringing forward of capital or pushing some back depending on what we hear tomorrow?

T
Tristan Pascall
Chief Operating Officer

Yes, Ralph. Look, we -- so as I said, the discussion around S3 is broader than the budget. But from our perspective, it would be very interesting, and we think there'll be some key markers in the budget around that, but it's a broader discussion around predictability and stability. The -- but yes, we can change the timing of S3. The reality is the capital expenditure won't accelerate too much in terms of payments going out the door just because of the timing that's already there and our ability to change that dramatically, even if we were able to bring forward, but we could push harder on it. At the moment, though, all of our thinking will come together in the guidance that we put out early in the new year, and that's where I think we'll give you the clearest indication of what we think is the -- our best approach at the moment. Yes.

Operator

The next question is from Jatinder Goel with BNP Paribas.

J
Jatinder Goel
Research Analyst

A couple of questions. The first one on capital allocation. Las Cruces is a brownfield project. So after Cobre expansion and probably even S3, is Las Cruces going to be the next likely project ahead of the greenfield Taca Taca and Haquira? And if that's the case, would you have a project building capacity and capital outlay ceiling on how much you want to do annually? I'm just trying to understand how would you prefer sequencing? And if there will be an annual ceiling on your CapEx outlook, you've done more than $2.5 billion annual CapEx, I think, in the past. Is the company willing to go there if projects are ready? And do you have the capacity to execute more than one big project simultaneously.

T
Tristan Pascall
Chief Operating Officer

Thanks, Jatinder. And look, you touched on really the core issue there, which is around people and the ability of the teams to cover all this ground. So we're seeing that across the industry. So particularly as we look at engineering in the major centers of Western Australia or out of South Africa, that -- and that's being experienced on Ravensthorpe is that the engineering firms are very heavily weighed with this. Our engineering, our project teams as much as they've come off big projects like Cobre Panama are pretty fully occupied at the moment with these potential projects, and that will be the challenge is how to walk through all of that. We certainly think that these 4 projects can be done in a sequence that will make sense in terms of that capacity for people and resourcing and also in terms of CapEx. We, as brownfield projects, they're very much less capital-intensive than a big greenfield, and we see that in terms of the returns that come back from them. And they also, as I said, have the other elements there existing operating teams, the social license to operate or the license to operate is in very good standing at each of those and because it's near to mine, all the shared infrastructure that's already on the ground. So Cobre/Las Cruces, if you were to do a greenfield projects in pyrite belt, there's a $1 billion process plant that would be needed, which is already built at Cobre/Las Cruces. Notwithstanding that CLC, we don't really think about it in what -- in terms of sequence and how does it stack up with the others. So that's one of the considerations, but really on its own merit that goes ahead. So that's the evaluation work that we're doing at the moment. As I said, we're working on the technical report, the 43-101 and that will come out early in the year as a resource statement, and that will give us more guidance around the shape of CLC. But the reality is, we'll be working across that, I think, next year in firming that project up.

J
Jatinder Goel
Research Analyst

Understood. That fairly clear. And just a quick one on coal exposure. When you say you're not exposed to coal price -- further increase in coal price rise, what's your reference point for further increase? Is it from today? Or is it from the second quarter which seemed to be the peak or the ceiling of your collar structure?

T
Tristan Pascall
Chief Operating Officer

Yes. Jatinder, from the end of Q2, so the prices that we're seeing there, we're basically at the top of the collar now, and it won't go in terms of impact. No further impact. Does that help?

J
Jatinder Goel
Research Analyst

Yes.

Operator

The next question is from Bryce Adams with CIBC Capital Markets.

B
Bryce Adams
Analyst

I wanted to follow up from an earlier question around Cobre Panama expected grades through to the year-end. Q3 was a positive surprise, and you're confident in your guidance. That said, is it possible to talk to the head grade that you've seen in October so far, just so that we can get a sense of how Q4 is tracking?

T
Tristan Pascall
Chief Operating Officer

Yes. Sure, Bryce. So look, you've got to bear in mind Cobre Panama, the volume is significant. So I think the difference in grade was 0.47 this quarter compared to 0.43 earlier in the year. So 4/10 of 1% of copper has that kind of impact on our business. And that's really the challenge for us because you're starting to get into the resource estimation side of things. That's very good for us. The reconciliation continues to be slightly positive and slightly -- so we don't have any problems with the grade control model or the original ore body model in terms of reconciliation. What we are seeing, however, is as we get into areas of waste that we're finding some more copper tonnes. So in the northern box cut, for example, it's spotty, but we're a little bit ore bound at the moment. There's more ore there than was in the original planning around the waste delivery. That continues on. We've done some drilling between the Medio and Colina pits and starting to link those together. And clearly -- so not any higher in grade but just very apparent that these pits are now linking together a lot more as we do the delineation drilling. And we expect -- we probably do for an update on the 43-101 at some stage. But certainly, as we look at Colina pit, that's part of our thinking and part of the planning there. In terms of grades in October, I mean, no, we've been tracking along as expected. What we will see is the grade that we took and brought forward in the mine plan won't be there for us in December, and so that's why the grade does come off. We'll be pushing through a little bit more volume. But overall, very happy with the guidance that we've provided. I hope that gives you a flavor.

B
Bryce Adams
Analyst

Yes. That's very useful. I guess, just following on from that and the step down in grade, if it's only in December, Q4 will probably be a modest step down versus Q3 and in the first half.

T
Tristan Pascall
Chief Operating Officer

It will be October, November and December, let me be clear there. So Bryce, we're confident in our guidance and the grade will be a bit less.

Operator

The next question is from Matthew Fields with Bank of America.

M
Matthew Wyatt Fields
Director

I hate to keep asking about this, but hopefully, it's the last 1 or 2 calls where I get to. Just a lot of fixed income investors are a little bit confused about your strategy on those front-end bonds. The credit markets are so accommodative to you at this point that you could -- the 7.25% could be refi-ed 200 basis points less than that. You've got so much cash on the balance sheet, you think more than you've ever had at $1.9 billion. I think what do you say to fixed income investors who kind of are wondering sort of what you're waiting for to take care of that front-end maturity.

T
Tristan Pascall
Chief Operating Officer

Hannes, do you want to...

H
Hannes Otto Meyer
Chief Financial Officer

Matt, look, I've said it earlier as well. So we will start addressing those front-end maturities now. In terms of refinancing, we're generating a lot of cash. There's no real liquidity need at this stage. I think what you will see in the future is an overall reduction in the size of our bond portfolio. And so in time, we'll add new bonds, probably smaller size, but just to keep the sort of yield curve current. But there's no need to rush out and add longer-dated noncallable debt at this stage, while we're generating good cash flow. So we -- you should see reduction of those nearer-term bonds in the near future.

M
Matthew Wyatt Fields
Director

So we should think the $1.6 billion of 7.25% gets refinanced with, call it, $800 million of some longer-dated bond at a lower coupon.

H
Hannes Otto Meyer
Chief Financial Officer

No, that's not -- look, I can use cash and facilities that I have got available. So I'm not committing to any of that at this stage.

M
Matthew Wyatt Fields
Director

Okay. And then on that new facility, I see the amortization schedule on the slide deck, that's very helpful. Is it sort of $455 million a year semiannually, so $220 million every 6 months.

H
Hannes Otto Meyer
Chief Financial Officer

That's correct. That's semi annually. That's correct.

M
Matthew Wyatt Fields
Director

On the rate, on that, I know the rate is not disclosed, but can you give us kind of a ballpark estimate or guidance of how the rate on this current facility compares to the rate on the older facility?

H
Hannes Otto Meyer
Chief Financial Officer

It is a significant improvement compared to the old facility.

Operator

The last question will be from Orest Wowkodaw with Scotiabank.

O
Orest Wowkodaw

Just thinking sort of big picture long term now with First Quantum. I mean, you've gotten the balance sheet well on its way to deleveraging. You've got obviously some brownfield opportunities ahead. But I'm just thinking more longer term, when you start thinking about next challenges on the greenfield side, do you -- are you starting to look externally at all for potential deposits that as an alternative to either Taca Taca or Haquira, just given both those -- it's not clear to me that either one of those projects makes sense to develop even in the medium term for various reasons.

T
Tristan Pascall
Chief Operating Officer

Sure, Orest. Thanks. Look, I mean we're excited about Taca Taca. We put out the 43-101 at the end of the last year, and we like the project. It steps up well. But certainly, we need to have regard to the business case or investment into Argentina, and that's where the work is going at the moment. So we -- there is progress. We've put in environmental permit, the infrastructure permit. We need to submit the order permit and so on around that. But there's good work happening there and in conjunction that, speaking with the federal government and also the regional government in Salta around the fiscal conditions for investment into Argentina. Haquira is an interesting project for us and certainly reliance on community relations there that's been harder with COVID-19. But I think it's something that we're interested to get more on the ground and deliver on. More broadly, yes, we look at opportunities. They come across our desk regularly. What we look for is projects that we can apply our capabilities and make a difference in terms of value. So there's obviously been quite a bit of activity recently. And I guess what -- where we would be distinguishing ourselves is around the ability to add value in terms of execution on the project side or operations excellence or on the ESG side in terms of changing the environmental picture there or otherwise. So that's what's important. But in terms of that, yes, the longer-term picture for First Quantum is continue to build on that growth. And really, that's around adding a third leg in time beyond Zambia and Panama and giving us that broader diversification and geopolitical diversification.

P
Philip Kelvin Rodda Pascall
Chairman & CEO

Tristan, let me handle that. I'd comment that Tristan has answered very well. We know that First Quantum is recognized for its growth and for having the capability to address projects. We needed particularly through the end of 2022 to consolidate all kinds of reasons, not least that we've always said we would deleverage, but also, we had some brownfield work that we wanted to put out the way. What I can assure you of is that we are looking at opportunities for growth because that's important both to maintaining that capability and exploiting and also because I think it's what our shareholders would want. So we have projects that, as Tristan says, Taca Taca is a really good project, and things in Argentina just do need some improvement or appreciation of what it's going to take to attract mining investment. And I'm sure that that's happening. And I think that, to some extent, Haquira is a development that we've kept working on and see possibilities with. But we need to and we do look beyond that, both in our exploration activities, which are quite fruitful and also to ensure that we have things we can work on. That time frame, as you know, is especially that big is one that's quite lengthy. So you have to start working on those things from quite early on, even though the capital expenditure might come later. And we understand that and are mindful of it, and with timing, we will see the impact of it.

T
Tristan Pascall
Chief Operating Officer

Thanks, operator. And just to say thanks to everyone for joining today's call. Please enjoy the rest of your day, and we look forward to speaking to you again at our Investor Day in January. Thanks, everyone.

Operator

Thank you. The conference has now ended. Please disconnect your lines at this time, and we thank you for your participation.