Portland General Electric Co
NYSE:POR

Watchlist Manager
Portland General Electric Co Logo
Portland General Electric Co
NYSE:POR
Watchlist
Price: 46.18 USD -0.32% Market Closed
Market Cap: 4.8B USD
Have any thoughts about
Portland General Electric Co?
Write Note

Earnings Call Transcript

Earnings Call Transcript
2024-Q1

from 0
Operator

Good morning, everyone, and welcome to Portland General Electric Company's First Quarter 2021 Earnings Results Conference Call. Today is Friday, April 26, 2024. [Operator Instructions]. For opening remarks, I'll turn the call over to Portland General Electric's Manager of Investor Relations, Nick White. Please go ahead, sir.

N
Nick White
executive

Thank you, Norma. Good morning, everyone. I'm happy you can join us today. Before we begin this morning, I would like to remind you that we have prepared a presentation to supplement our discussion, which we will be referencing throughout the call. The slides are available on our website at investors.portlandgeneral.com. Referring to Slide 2. Some of our remarks this morning will cost forward-looking statements. We caution you that such statements involve inherent risks and uncertainties, and actual results may differ materially from our expectations. For a description of some of the factors that could cause actual results to differ materially, please refer to our earnings press release and our most recent periodic reports on Form 10-K and 10-Q, which are available on our website. Turning to Slide 3. Leading our discussion today are Maria Pope, President and CEO; and Joe Trpik, Senior Vice President of Finance and CFO. Following their prepared remarks, we will open the line for your questions. Now it's my pleasure to turn the call over to Maria.

M
Maria Pope
executive

Thank you, Nick, and good morning, everyone. Thank you for joining us. Portland General Electric is on track in 2024, and the stage is set for steady normalized growth. After top weather and extensive customer restoration in January, our results this quarter speak to strong execution. Beginning with Slide 4, I'll speak to our financial results and key drivers. For the first quarter, we reported GAAP net income of $109 million or $1.08 per diluted share. On a non-GAAP basis, net income was $123 million or $1.21 per diluted share. This compares with first quarter 2023 GAAP net income of $74 million or $0.80 per diluted share. First quarter 2024 GAAP results excluded the 20% nonrecoverable costs of the reliability contingency events incurred in the January storm event. Results this quarter, which Joe will discuss in his remarks, were driven by robust low growth from semiconductor and data center customers and our focus on operational execution. This focus was evident throughout the quarter and no more so than during the January storms. Our PGE team members navigated regional resource constraints, gas network disruptions, severe winter conditions that resulted in hundreds of thousands of customer outages. I'd like to again commend and thank my colleagues for their extraordinary work during this challenging event. As we look ahead to the balance of the year and beyond, we remain focused on 3 main areas: first, rapid transformation of our energy systems propelled by continued investments in our service territory by semiconductor and digital infrastructure customers. Second, executing our capital plan to meet customers' priorities for clean energy and increased grid resilience. And third, delivering on our ongoing commitment to operational discipline by reducing risk, controlling costs, driving efficiencies and managing customer affordability. This is a period of rapid growth and transformation for both our energy system and our region. The robust growth of the semiconductor and digital sectors will enable system-wide infrastructure and reliability investments and we'll continue to engage our customers, regulators and other stakeholders to ensure that this growth benefits all customers, industrial, commercial and residential alike. We continue to see significant residential transformation in our region as well with strong growth of rooftop solar and electric vehicle adoption. Together, these changes are requiring us to think differently and innovate as we build and upgrade transmission and energy infrastructure on a scale, reminiscent of on our industry first electricals. Moving to Slide 5. Industrial growth. First, industrial load growth increased 4.9% compared to the first quarter last year. State and federal investments are bolstering semiconductor expansion in our service area. This quarter, Intel announced investments across 4 states, backed by $8.5 billion in federal funding. Intel expects that $36 billion will be spent in Hillsboro, Oregon in the Western part of our service territory. This is in addition to the significant semiconductor investments by Analog Devices, Microchip and many others. This will drive economic growth for years to come, helping to cement Oregon silicon for us as the premier hub for semiconductor manufacturing, research and development. These investments will have broad benefits across our regions, strengthening our communities, creating jobs, providing workforce development and higher education opportunities. Moreover, Oregon continues to reinforce its position as a hub for the digital infrastructure that underpins our global economic growth fueled by generative AI. A recent study by Cushman & Lake ranked Oregon as the fifth largest data center market nationally and globally. With this mature digital ecosystem in our area, we've been fortunate to enable growth, observe emerging trends and plan accordingly. Last year, as part of our combined Clean Energy and Integrated Resource Plan, we increased our expectations for industrial energy usage in our service territory by over 40%, anticipating the rapid growth that we are seeing today. Additionally, these plans emphasize the need for expanded transmission investments, which we highlighted in our recent capital plan update. As industry continues to reshore and expand, we recognize the importance of electric infrastructure, clean energy supply and reflected our region's focus on sustainability, economic security and transformative operation opportunities for our next generation. Capital plan execution. The ambition and clean energy goals of our customers underscore the importance of Portland General Electric's commitment to transform our energy systems to pursue clean energy resources and expand transmission and invest in grid resilience. These investments not only position us for long-term growth, but also create significant benefits for all customers. Our generation, battery storage and grid infrastructure projects are great examples. The forthcoming comfortable and shine battery storage projects will play a critical role in matching variable renewable production with customer demand. The flexibility these batteries provide will allow us to navigate increasingly frequent and costly periods of power cost volatility. Similarly, the clear water development that came online in January has allowed PGE to generate more wind energy than ever before and will lead to customer price reductions while providing important geographic resource diversity. We're also continuing to modernize and harden our grid to accommodate emerging technology and to improve resilience in the face of severe winter and summer weather. These investments on behalf of customers from battery storage to grid modernization and resiliency projects are at the center of our 2025 general rate case filed in February, which Joe will touch on shortly. Operational discipline. As we advance critical investments to strengthen our system, affordability remains squarely in focus. This means finding opportunities to drive efficiencies and savings through power cost management and operational discipline. In March, PGE announced plans to join other Western utilities in the CISO extended day-ahead market. ENAM offers us a larger operational footprint that will enhance reliability and help alleviate power cost pressure. On the operational front, PGE teams are deploying technology to prioritize work, optimize business processes and focus on key risks like cybersecurity and wildfire mitigation. For example, as we progress through our year-round wildfire program, we are enhancing our vegetation management and investing in system hardening, situational awareness and operational practices. This includes AI equipped cameras, weather stations, reclosers, fire mesh poll wraps and early fall detection. As we look ahead, we have a solid first quarter, and we are focused on execution and delivering on expectations. Our plans are exciting, achievable, and we're going to get it up. With that, I'll turn it over to Joe, who will walk us through our financial results in more detail. Thank you.

J
Joseph Trpik
executive

Thank you, Maria, and good morning, everyone. Turning to Slide 6. Our Q1 results reflect continued demand growth from industrial customers, dynamic weather and ongoing efforts to derisk our operations. Weather in our area was variable throughout the quarter with colder conditions in January, followed by more mild conditions in February and March. Overall, heating degree days for the quarter were 8.9% lower than in Q1 2023. Q1 2024 loads decreased by 0.9%, but increased by 1.2% weather adjusted compared to Q1 2023. 2024 residential load decreased 3.6% year-over-year due to mild weather, but increased by 0.5% weather-adjusted. Residential customer account increased 1.3%. Commercial load decreased 2.1% or 1.3% weather-adjusted driven largely by lower commercial activity during the January winter storm. The industrial class sustained its momentum with load increasing 4.9% or 5.2% weather adjusted. Demand growth for digital and semiconductor customers supports this growth trend reinforced by the ongrowing investment Maria highlighted. We maintained good visibility to our robust pipeline of incoming projects and remain confident in the strength of our service territory. Given these factors, we are reiterating our 2024 weather-adjusted load growth guidance of 2% to 3% and our long-term growth guidance of 2% through 2027. I'll now cover our financial performance quarter-over-quarter. We observed a $0.03 decrease in revenues, primarily due to weather-driven decreases in deliveries, an $0.18 increase resulting from the rightsizing of our cost structure and improved recovery of wildfire mitigation, education management, other O&M and capital assets serving customers. Power costs drove a $0.30 increase in EPS, driven by a $0.13 EPS increase due to Power cost detriments in Q1 2023 that reversed for this comparison and a $0.17 increase in EPS from lower power costs than anticipated in the annual update tariff driven by derisking actions taken throughout the quarter. We had a $0.04 decrease in other items, including the dilutive impacts of recent equity draws, lower regulatory program interest and higher property taxes, partially offset by higher AFUDC and lower income tax expense generally from PTC effects. And lastly, a $0.13 decrease to GAAP EPS resulting from the 20% portion of nonrecoverable January storm RCE costs, bringing us to a GAAP EPS of $1.08 per diluted share. After adjusting for this $0.13 impact, we reached our Q1 2024 non-GAAP EPS of $1.21 per diluted share. On to Slide 7 for our current capital forecast. Our plan for 2024 remains on track, including progress on the Constable and seaside battery project as well as our transmission and base system investments. The ongoing RFP is moving ahead as we seek additional resources to serve customer growth and make progress on our clean energy targets. Bid submissions will conclude in April, and we will then move to the evaluation and scoring phase as selection criteria continue to focus on lease cost and lease risk. Submission of a shortlist for acknowledgment by the OPUC is expected in early Q3 and bid selection is anticipated in the third or fourth quarter. We will keep you updated as the RFP progresses. As we've noted previously, the figures in our capital plan do not include any potential forthcoming RFP projects. Turning to Slide 8 for a summary of the 2025 general rate case filed in late February. This filing is largely focused on the recovery of our incoming battery storage project and continued system investments for reliability, resiliency and grid modernization. A procedural schedule has been posted for the rate review docket, and we look forward to engaging stakeholders at upcoming settlement discussions, the first beginning next week. Review of the filing will continue through the year and all items remain subject to OPUC approval. New customer rates are anticipated at the beginning of 2025. On to Slide 9 for a summary of our liquidity and financing. Total available liquidity at March 31 is $1.1 billion. Our investment-grade credit ratings, stable credit outlook and balance sheet strength remains static since our last disclosure. In late February, we executed $450 million in long-term debt issuances. And in March, we drew $78 million previously priced under our ATM program, focused on rate base investments. The ATM continues to provide adequate capacity and flexibility to support our ongoing base capital plan and our access to both equity and debt capital markets remain strong. Capital structure maintenance, tercile dilution management and capital deployment for accretive rate-based investments remain the pillars of our financial strength. We'll continue to calibrate our approach as investment opportunities evolve, including from the RFP, and we will keep you informed as we proceed. Reflecting on Q1, our results represent a solid step forward in our long-term growth trajectory. This plan is underpinned by our continued focus on operational efficiency, thoughtful cost management and strategic capital investments. The strength of our region, highlighted by the continued load growth expectations I noted earlier as well as our focus on consistent execution and performance give us confidence in our performance for the year and beyond. As such, we are reaffirming our 2024 adjusted guidance of $2.98 to $3.18 per share and our long-term earnings and dividend growth guidance of 5% to 7%. Regarding dividends, we recently announced a $0.10 annual dividend increase, in line with our targeted growth range and our 60% to 70% payout ratio target. As we turn to the balance of 2024, we remain centered on our strategic plan that will deliver results and value for our customers, shareholders and the communities we serve. And now, operator, we are ready for questions.

Operator

Thank you. [Operator Instructions]. Our first question comes from the line of Richard Sunderland with JPMorgan.

R
Richard Sunderland
analyst

Can you hear me?

M
Maria Pope
executive

Yes, we can.

R
Richard Sunderland
analyst

Great. Appreciate the color on the RFP process. I'm curious if the projects come through at the pace you expect, what could that potential equity need be? And just for comparison's sake, how should we think about that equity versus equity for the base plan as it stands today?

M
Maria Pope
executive

Sure. Let me have Joe talk to you about our financing plans and how we've reflected them. But overall, with the RFP process, we expect a really robust pipeline of renewable and capacity projects. We should probably have a good short list as well as some conclusions around late second quarter, beginning of the third quarter, and we would hope to be able to have contracts executed towards the end of the year, maybe even spilling into the first quarter. Joe, with regards to equity?

J
Joseph Trpik
executive

Richard. As it relates to equity, any equity needs coming from the RFP would be incremental to our plan. And we have said that we expect to finance that in both a solution management approach, matching the cash flows to the needs as well as possible as well as maintaining a 50-50 cap structure balance. As it relates to pricing, we will wait and see how this sizes out. I mean I think our guidance that we -- or I'm sorry, our illustrative presentation that we gave on rate base growth in our investor deck is probably our best proxy to build off of as it relates to equity. To Maria's comment, we do anticipate a pretty active RFP process and timing wise and cash flow wise. As you think about it, we are looking for projects that are able to come online by the end of 2027 that also aligns with what is our preferred portfolio.

R
Richard Sunderland
analyst

Okay. Understood. And then turning to the rate case, the precuts early, but how is the process unfolding so far? I'm hoping you can frame the revenue ask here versus the prior few cases, thinking across size and composition of, say, capital, O&M and power? And then given this follow-up is last year's case, is settlement the expected outcome here? How should we think about that?

J
Joseph Trpik
executive

So sure, I'll start us off on the rate case. So our -- the rate case focus that we have this case is mainly about capital. So I would think of it as 65% of this case is capital and then 25% O&M and 10% for our power cost. This is a change from our last case. Our last case upon ultimate settlement, over half of the case was power costs. So we really look at this case as making sure that we're as efficient as possible and really looking for recovery of putting these assets in service, including the battery projects that we've talked about that really drive benefits for the customer. And then as it relates to settle, the settlement processes will start next week, as I mentioned previously, and we hope to get aligned with parties to be able to settle. But each case stands on its own, and we hope to have a pretty open and productive dialogue with all interested parties starting.

R
Richard Sunderland
analyst

Okay. Got it. I'll leave it there for now. Thank you very much for the time

Operator

Our next question comes from the line of Shahriar Pourreza with Guggenheim Partners.

S
Shahriar Pourreza
analyst

Maria, I know this year has kind of a shorter session for the legislature. Can you give us any updates on efforts around maybe a state wildfire fund and what the groundwork, if any, looks like for the longer legislative session ahead? I mean, given what you know today, is this something you could see get done by 25.

M
Maria Pope
executive

Sure. We are working on place solutions, both at the state and the federal level. And on the state side, we have been talking with a number of parties from the force organization to representatives and senators to our customers and to leadership across the entire state. Clearly, wildfire is a social risk, and we want to address it from a solution, not just one that's solely focused on the utility, but a broad set of solutions that really works for Oregon. And then also on the federal side, there's a lot of discussions taking place from how our forestlands are managed nationally through the U.S. Forest Service and the Bureau of Land Management to also ensuring that not only utilities have access to insurance, but also homeowners and others. This area is combined with all of the operational work that we're doing, the very important operational work we're doing is our #1 priority to keep our customers and the communities that we serve safe.

S
Shahriar Pourreza
analyst

Got it. Perfect. Perfect. Perfect. Perfect. And then just on power cost, I mean you had a substantial deferral during the storms in January and the MVPC is otherwise kind of below the baseline. Can you remind us, is there a cap on the amount you could defer under the RCE construct. I guess can we just put a finer point on what you saw during the event and how it interacts with the MVPC. And then secondly, how are things, hydrosnowpack looking for the summer peak.

M
Maria Pope
executive

Sure. So let me take the first one in terms of the conditions during the January period of time. It was really extraordinary. Early on, the January event, Alberta came very close to a crew energy crisis, and that's spilled over into the Pacific Northwest. Later on, a couple of days later, a major storage facility in the Pacific Northwest came offline. And so generators throughout the entire region scrambled. We maximized energy flows coming in from the Desert Southwest and California. But we hit a number of transmission constraints. And we also brought in much higher levels of power out of British Columbia. Most of that was hydro-based. What we have seen is that our experience was not too different from some other large investor-owned utilities. Through our RC mechanism. We are able to defer 20% excuse me, we're able to defer 80%, and then we retain 20% was closed through the PCAM mechanism. There is no cap on that. And we are overall really focused on managing power costs. We've seen them come up quite significantly and a big issue for us as well as for others. With regards to hydro conditions, they're pretty similar to where they were last year. Obviously, we're in the springtime, so we'll see hydro pick up in the second quarter. And quite frankly, we had stronger flows than we expected in the first quarter. As you look towards the summer time, there is very little snow pack in Canada and in British Columbia, in particular, where most of our hydro comes and what drives the market price of power through the region. So even though you see year-to-year similarities, I think we are setting up for a very tough power cost summer. Overall, hydro throughout the entire region is about 80% of normal.

S
Shahriar Pourreza
analyst

Got it. Perfect. Thank you, Maria. I appreciate the color. Thanks so much.

Operator

Our next question comes from the line of Paul Fremont from Ladenburg Salmon.

P
Paul Fremont
analyst

I guess my first question has to do with some of the demand that you're seeing on the data center side, is that demand fully at this point incorporated into the IRPs that you filed? Or do you see sort of incremental demand above what you're projecting?

M
Maria Pope
executive

Sure. So as you know, we did our first ever plan and follow-on IRP last year. About this time last year, we filed a supplemental to that and took up the energy demand by about 40% from what we were projecting previously. After you look at the efficiency of combined technologies and what we were seeing in some of the new deployments that we have as well as how we're using the distribution system more effectively, that came down to about 14% overall. But it's a 40% increase in demand is a huge increase. And it certainly got everybody's attention. And I think that it's absolutely what we're going to be probably as a floor on what we'll see as we move forward. Just for perspective, of our industrial customer base, about 20% are digital data center type customers. The real bulk of our industrial base is really actually semiconductors. And about 15% of semiconductors in the U.S. are actually manufactured in our service territory. And most recently, the State of Oregon created a matching fund to the SaaS, about $240 million, $250 million and 85% of the allocation of those funds with those specific companies are companies who have operations in our service territory. So we continued growth from not only from data centers, but also from semiconductor manufacturers through the next decade that will probably only get higher, not lower.

P
Paul Fremont
analyst

Great. And I guess the most likely period if you were to settle in the rate case, would that be before hearings?

M
Maria Pope
executive

No, I would imagine that we'll probably have a number of discussions and workshops with staff and parties. We try and settle before we ever get to a commission or order or whatnot. We generally are a pretty collaborative state as we work through issues. Obviously, customer prices has always been and will continue to be a major focus for us, and we've had some pretty big increases. So these conversations are going to be a challenge.

P
Paul Fremont
analyst

And then last question for me. Can you just reiterate in terms of M&A whether what the company would be open to or not open to in the future potentially?

M
Maria Pope
executive

Sure. As you know, we don't comment on any sorts of discussions along those lines, and we're not changing our policy.

Operator

Our next question comes from the line of Gregg Orrill with UBS.

G
Gregg Orrill
analyst

So back to the drivers for the quarter. There was the management of power cost, which was a $0.17 benefit. How does that flow through or the PCAM? Or where does the PCAM stand?

J
Joseph Trpik
executive

Gregg, this is Joe Trpik. So as you may recall, the PCAM has an astric dead band of $15 million below before a sharing calculation is done or $30 million above where we sit currently. So during the quarter, really, what we saw was the pretty productive management of cost and then also a stable market. We didn't see the volatility that we have seen in prior periods on gas prices and things like that. So where we sit currently is we are $19 million below the PCAM baseline currently. Now part of that is due to the shaping of the way that the rates are set in the automatic adjustment tariff as it goes through the year. We've disclosed in the 10-Q that we think we'll be somewhere around the edge of the baseline by the end of the year. But we do see that $19 million favorable to baseline currently.

Operator

Thank you. [Operator Instructions]. Our next question comes from the line of Will Grainger with Mizuho Securities.

W
Will Grainger
analyst

Good morning, everybody. Maybe just one, if you can unpack for us a little bit. I understand there's 2 buckets with costs associated with the January storm. You have the $75 million RCE associated with the RCE event and then a separate $48 million. Could you maybe talk to how you're thinking about the timing of the recovery of those dollars?

J
Joseph Trpik
executive

Sure. The reason that they are separate like that, and I'll talk to is they are recovered under there are 2 different regulatory mechanisms that they're covered. And I'll start with the $75 million deferral. The $75 million deferral is an RCE deferral under the PCAM. As it relates to the timing, that recovery will be assessed in a process that will go through mid-2025, and we would expect currently that the recovery of whatever amount is settled in that process would start in 2026. The reason they expect the RCE mechanism is new, and the methods will be part of the -- our recovery will be part of that discussion. Separately, we incurred $48 million in O&M and capital cost as it related to the physical restoration of the system during that storm period in Ford into our provisions that allow for the recovery of those costs when the state of emergency is declared enter such damage, that proceeding has started and that sort of that cost proceeding has started, but the time line is not set. So there's a filing made, there's a time line underway. If I hadn't put an expectation at some period in 2025, once it settled there would be a recovery. But right now, there's not a same close date for the proceeding for me to be able to say what date that recovery would occur nor do we have until the proceeding ends, what the time period of that recovery could be, it could be a short period or up to several years based on what decisions are on.

W
Will Grainger
analyst

I appreciate the color. And then maybe one more on the extended day ahead market proposal to join the Cal ISO, would that allow you to get any sort of FERC at ROE adder or any sort of incremental transmission build to the capital plan? And maybe how should we be thinking about that?

M
Maria Pope
executive

Yes. That's a good question. No, it would not. It's a part of an ISO. There is no RTO in the West, and we're probably quite a ways off from that if we ever do get to an RTO. It allows us to move from the energy and balance market, which is essentially a real-time market to the day ahead. And there's some pretty significant customer benefits that we'll realize from that, but also some important operational benefits as we maximize the diverse renewable resources from the Desert Southwest and extensive solar to the Pacific Northwest hydro and all of the wind energy in between. So it allows for really a more planful portfolio effect and it builds upon the really good work that has already been done through the energy and balance market.

Operator

Thank you. I'm currently showing no further questions at this time. I'd like to hand the conference back over to Maria Pope, President and Chief Executive Officer, for closing remarks.

M
Maria Pope
executive

Great. Thank you for joining us today. We appreciate your interest in Portland General, and we look forward to connecting with you soon. Thank you very much.

Operator

This concludes today's conference call. Thank you for your participation. You may now disconnect. Everyone, have a wonderful day.