Ladies and gentlemen, good morning, good afternoon, good evening. My name is Zed. I'll be your conference operator today. At this time, I would like to welcome everyone to the NJ Resources Q3 FY '21 Conference Call. [Operator Instructions]

I now invite Dennis Puma, Head of Investor Relations. You may please begin the conference, sir.

D
Dennis Puma
executive

Thank you, Zed. Good morning, everyone. Welcome to New Jersey Resources Third Quarter Fiscal '21 Conference Call and Webcast. I'm joined here today by Steve Westhoven, our President and CEO; Pat Migliaccio, our Senior Vice President and Chief Financial Officer; as well as members of our senior management team.

As you know, certain statements in today's call contain estimates and other forward-looking statements within the meaning of the securities laws. We wish to caution listeners of this call that the current expectations and beliefs forming basis for our forward-looking statements include many factors that are beyond our ability to control or estimate precisely. This could cause results to materially differ from our expectations as explained on Slide 1.

These items can also be found in the forward-looking statement section of today's earnings release furnished on Form 8-K and in our most recent Forms 10-K and Q as filed with the SEC. We do not, by including this statement, assume any obligation to review or revise any particular looking statement referenced herein in light of future events.

We will also be referring to certain non-GAAP financial measures such as net financial earnings or NFE. We believe that NFE or net financial loss provides a more complete understanding of our financial performance. However, they are not intended to be a substitute for GAAP. Our non-GAAP financial measures are discussed more fully in this presentation in today's earnings release and in Item 7 of our 10-K.

Our agenda for today is found on Slide 2. Steve will begin today's call with highlights from the quarter, followed Pat who will review our financial results. We'll then open the call to your questions. The slides accompanying today's presentation are available on our website and were furnished on our Form 8-K filed with the SEC this morning.

With that said, I'll turn the over to our President and CEO, Steve Westhoven. Steve?

S
Stephen D. Westhoven
executive

Thanks, Dennis, and good morning, everyone, and thank you for joining us today.

This morning, we reported a third quarter GAAP loss of $1.16 per share and a net financial loss of $0.15 per share. During the quarter, we incurred a onetime after-tax impairment charge $72.7 million related to our investment in the PennEast project. While this is included in our net income for the quarter, it is excluded from and does not impact our net financial earnings. It remains our belief that PennEast is important and needed project to serve energy demands in the Northeast. The impairment we've taken reflects the ongoing uncertainty around the project's in-service date and the regulatory milestones needed to achieve it. As a reminder, in November, we moved PennEast from our forecast and the impairment has no bearing on our long-term growth targets.

Moving on to the highlights of the quarter. We are increasing our fiscal 2021 and NFEPS guidance to a range of $2.10 to $2.20 per share. This guidance increase, the third one for this year, is driven by better-than-expected results at Energy Services and our BGSS incentive program at New Jersey Natural Gas. We are also pleased to report that construction and final testing on the Southern Reliability Link are complete with an expected in-service date later this month.

At Clean Energy Ventures, despite delays for some of the in-service dates of some of our investments, our project pipeline remains robust. We now have more than 70% of our original $315 million CapEx target for fiscal years '21 and '22 either operational, under construction or under contract.

Leaf River, our natural gas storage facility in Mississippi, increased the long-term commitments of new and existing customers, significantly derisking our future revenues. And finally, Adelphia Gateway received a FERC notice to proceed for construction of laterals and interconnects in the South zone of the project. We expect to place a number of Adelphia's project facilities into service by the end of this year.

Turning to Slide 4. We wanted to provide an update on the progress made on some of the initiatives we discussed during our Analyst Day last November. At New Jersey Natural Gas, we completed the construction of SRL and filed a rate case. We're also excited to report that construction has begun on our first green hydrogen project. This is an important step in the decarbonization strategy laid out during our Analyst Day that furthers our efforts to decarbonize our business as we move towards a future that includes more low- and zero-carbon fuel sources.

As promised, we began to diversify our CEV project pipeline. Nearly 25% of our fiscal year '21 and '22 capacity target is expected to come from projects outside of New Jersey. We also took steps to reduce the volatility of CEV's earnings by adopting the deferral method of accounting for ITCs, and we're improving our cash returns by utilizing tax equity financing for our solar projects, helping to accelerate the monetization of our tax attributes.

As I mentioned earlier, our Storage & Transportation business has derisked future revenue streams by increasing Leaf River's long-term contracted revenues with high-quality customers. And as we'll discuss later, our progress continues in Adelphia Gateway's construction despite some regulatory delays.

Our Energy Services business entered into a series of asset management agreements that will significantly increase the predictability of that segment's earnings while still allowing them to retain the potential upside associated with our long option strategy. These accomplishments have led to solid financial results and strong cash flows that provide a clear pathway for achieving our long-term earnings growth target of 6% to 10%.

Turning to Slide 5. I'll provide an update on our rate case. Last month, we adjusted our filing to include 9 months of actual results. Also, since we expect SRL to be in service by the end of this month, it will no longer the treated as a post-test-year adjustment. In total, we are now requesting an increase to base rates of almost $164 million. The rate case is progressing as scheduled we hope that the BPU's review will be completed before the end of 2021. We will continue to work with them towards a resolution that balances the interest of our customers and the company.

Turning to the business unit results. On Slide 6, New Jersey Natural Gas has invested $365 million so far this year with about 25% of the CapEx providing a near realtime return. And despite the pandemic, we added over 5,400 customers so far this fiscal year.

Turning to Slide 7. As part of the decarbonization outlined at our Analyst Day, we discussed the important role hydrogen will play in our energy future. Our first power-to-gas project is now under construction and will enable the blending of hydrogen into our distribution system. This will create awareness with our regulators and policymakers to build expertise to allow us to scale as the market continues to develop. Using electricity source from the adjacent solar facility, water will be separated into hydrogen and oxygen, and the carbon-free hydrogen will be blended into our distribution system. We expect the project to be in service this fall, and once completed, will be the first utility on the East Coast directly injecting green hydrogen into an existing natural gas distribution system.

Green hydrogen isn't the only alternative fuel opportunity that New Jersey Natural Gas is pursuing. And on Slide 8, you see that we are working towards a broad sustainability strategies focused on decarbonizing of our core infrastructure. In addition to our hydrogen project, we're exploring investment opportunities in renewable natural gas within our service territory. As RNG and hydrogen technologies continue to scale, we expect that our existing natural gas distribution system will deliver more decarbonized fuel, dramatically reducing emissions without the need for a massive build-out of costly infrastructure required to full electrification. By maximizing the benefit of our existing infrastructure, which is best-in-class, we see a practical path towards decarbonization for both New Jersey and rate payers. Our team is focused on putting our strategy into action through new investments, and we'll provide updates as we progress.

Turning to CEV on Slide 9. Through the first 9 months of the fiscal year, we had an 8.4 megawatts of incremental capacity, which is lower than originally anticipated. The in-service dates of several our commercial projects has shifted in fiscal -- to fiscal 2022 due to pandemic-related permitting and interconnection issues. And while these challenges have significantly impacted project completion in fiscal 2021, we view these industry-wide impacts as short term.

Moving to Slide 10. You'll see our commercial CapEx target remains at $315 million for years '21 and '22. And as mentioned earlier, more than 70% of this CapEx target is already operational, under construction or under contract.

We will continue to monitor any potential ongoing pandemic factors as our pipeline of project progresses. And in addition, CEV continues to diversify and grow its project pipeline through expansion efforts outside of New Jersey.

Turning to Slide 11. On July 28, the BPU approved the initial phase of the New Jersey Solar Successor program, announcing incentives for landfill to net metered solar projects under 5 megawatts in size. The second phase of the Successor program will be based on a competitive bid process for projects greater than 5 megawatts. Both phases will be independent of the SREC and TREC programs. The current TREC program will close to new applications on August 27. And the new program, SREC 2 will open to new applications on August 28. We are pleased to report that more than half of our fiscal '21 and '22 New Jersey projects have been secured under the TREC program. And that percentage may increase based on pending applications.

New Jersey is committed to its solar industry, targeting 750 megawatts per year of new capacity through 2030. And as part of the new program rollout, the state is committed to access -- assess progress after 12 months to ensure New Jersey is on track to meet its solar targets. The Successor program will provide CEV with investment opportunities that combined with out-of-state diversification will allow us to achieve the goal of doubling our installed capacity by 2024.

Now let's talk about our Storage & Transportation business, beginning on Slide 12. Critical federal and state approvals have been attained for both Phases 1 and 2 of the Adelphia Gateway project. During the quarter, the project received its FERC notice to proceed for Phase 2 of the construction on the South zone, which includes key laterals and interconnects with Columbia, Transco and PECO. As you may recall, construction on Phase 1 began last October. We expect a number of Adelphia Gateway's facilities to be operational by the end of this year, and our expectation is the project will be fully in service by the end of 2022. S&T remains on track to achieve a 4-year adjusted EBITDA CAGR of 20% as we discussed at our Analyst Day.

Slide 13 details the progress that we have made towards derisking Storage & Transportation's future revenue streams. The team has done an excellent job of increasing the percentage of long-term contracted revenue associated with our Storage & Transportation assets that we -- further, we've secured $45 million of additional contracts through fiscal 2024 with new and existing creditworthy customers.

I'll now turn the call over to Pat for some details on the financials. Pat?

P
Patrick Migliaccio
executive

Thanks, Steve, and good morning, everyone. Slide 15 shows the main drivers of our NFE for the third quarter. We reported a net financial loss of $14.1 million or $0.15 per share compared to NFE of $2.7 million or $0.03 per share in the third quarter of fiscal 2020. NJNG's NFE was lower due to O&M expenses related to increased bad debt and compensation expense. CEV saw a modest increase in NFE due to lower depreciation expense, partially offset by increases in O&M expenses related to project maintenance and leasing. S&T was lower, primarily due to higher interest expense related to Adelphia Gateway and Leaf River acquisitions. Energy Services was down $5.9 million due to timing of certain storage hedges.

Also, although excluded from NFE, we incurred $92 million or $72.7 million after-tax impairment charge on our investment in the PennEast project. Since we previously removed PennEast from our financial projections, the impairment has no impact on our ability to achieve our long-term NFEPS, dividend and cash flow from operations growth targets.

On Slide 16, I'll summarize the evolution of our NFEPS guidance for fiscal years 2021 and 2022. Fiscal year 2021 was going to be a reset year with lower NFE than in fiscal 2020 due primarily to the change in the accounting for ITCs going from flow through to the deferral method and also some regulatory lag related to items we expect to recover as part of our 2021 rate case filing.

In March and then again in May, we increased our NFEPS guidance due to the outperformance of Energy Services resulting from winter storm Uri. Today, we're increasing our fiscal '21 guidance again due to better-than-expected results from NJNG's BGSS incentive program and also Energy Services, driven by volatility associated with slightly warmer-than-normal weather in the summer, coupled with certain interstate gas pipeline constraints.

Fiscal year 2022, our NFEPS guidance was originally in the range of $2.05 to $2.15 per share. Subsequent to Analyst Day, we announced that Energy Services had entered into a number of asset management agreements with investment-grade rated utilities. During the Q1 earnings call, we raised our NFEPS guidance for us for fiscal 2022 to a range of between $2.20 and $2.30, mostly driven by the Energy Services and AMAs, and saw the in-service dates for many of our CEV commercial projects shifted to fiscal 2022. The capital related to projects placed in service for the fiscal year-to-date is about $17 million, while the total capital spend is approximately $50 million.

We've adjusted our capital plan accordingly. For fiscal '21, we now expect to spend between $50 million and $60 million CEV compared to our prior forecast of approximately $66 million to $88 million. And for 2022, we now expect to spend around $280 million compared to our prior estimate of $250 million.

Turning to Slide 18. You can see the update to our cash and financing projections. Our cash flow from operations remained strong, and we have no block equity needs for the foreseeable future. During the quarter, we cash-settled the last portion of the equity forward that we place related to our December 2019 equity issuance.

On Slide 19, we've highlighted the details of our SREC hedging program. We're well hedged for the next 3 energy years and now have 94% of our 2024 volume hedged. The market fundamentals for energy years '25 and '26 are supporting strong pricing. with SREC trading at or above 85% of SACP. We're now at 37% and 11% hedged for those years, respectively.

I'm going hand the call back to Steve for some closing remarks.

S
Stephen D. Westhoven
executive

Thanks, Pat. Before I open the call to questions, I'd like to summarize the quarter. NJR continues to deliver strong results for the first 9 months of this year. The strength of our business led by Energy Services and New Jersey Natural Gas has allowed us to increase NFEPS guidance for the third time this year. Our rate case continues to progress on schedule, and we look to forward to a resolution later this year. SRL is now complete, and we expect it to be in service later this month. Our CEV project pipeline remains strong with over 70% of our targeted CapEx either operational, under construction or under contract. We received FERC approval and began construction on the second phase of Adelphia Gateway. And Leaf River significantly derisked its revenues going forward through long-term contracts with the new and existing customers.

I want to thank all of our employees for their hard work throughout this year, and I'll now open the call for questions.

Operator

[Operator Instructions] The first question is from the line of Gabe Moreen from Mizuho.

G
Gabriel Moreen
analyst

I just wanted to maybe start off and ask on sort of the hydrogen potential RNG investments. Maybe if you can, Steve, speak to kind of how you view this hydrogen investment in terms of what the next steps would be if this investment proved successful? Do you have room to potentially build additional plans on your existing sites, for example?

And then as far as RNG goes, can you just remind us what the latest developments are in terms of regulatory treatment around RNG, whether it's rate basing your own investments or being able to pass through RNG costs or cost of gas to customers and recover those costs? So just curious how you're thinking about kind of going down that RNG path?

S
Stephen D. Westhoven
executive

Okay. So Gabe, I'll answer the first question just broadly. So injecting hydrogen into our system, it's not a new technology. They're doing it over Europe, and in fact, in other parts in the U.S., they're doing it. So we're going to prove it out for our system. We expect it to be successful. And then we will have the ability to scale. I mean this is really part of the decarbonization strategy for the fuel that we delivered to our customers. And really to prove out not only that we're able to do it, but we should be able to decarbonize and do it cheaply and effectively in the future.

We are pursuing a number of RNG opportunities within our service territory. But I'm going to ask Mark Kahrer, who's the Senior Vice President and Head of Regulatory, to answer the question about how that will flow through essentially rate case regulatory treatment.

M
Mark Kahrer
executive

Thanks, Steve. Gabe, there are 2 opportunities that we're looking at right now. One would be a direct investment in the processing plant. We believe we have authority under what was the 2005 Energy Legislation. That enabled us to invest not only energy efficiency but also in renewables as well. And the definition of renewables is that what renewables has been modified by the state a number of different times, which incorporates the renewable natural gas. So we believe we have the authority to continue to have discussions with our regulators about that.

There's also pending legislation that has been introduced in the state also to encourage BPU to take a closer look at RNG and hydrogen ensuring that not only direct investment and operation of those assets, but also procurement of renewable natural gas would be under their authority renewed and done effectively within the state and begin decarbonizing the gas streams as well.

So the second opportunity would be a direct purchase from another facility that whether it's food waste anaerobic digester or another processing plant that's taking landfill gas and cleaning it up and having it ready to inject into our line and basically buying it from, I guess, a third party -- buying from that third-party and inject directly into our system. So we believe we have authority to do all that now. But again, it's something that we'll continue to work with our regulators to ensure that everybody is on the same page as we go forward with this.

P
Patrick Migliaccio
executive

This is Pat Migliaccio. Just as a reminder, from a capital planning perspective, we've only included the one hydrogen pilot project and a potential RNG opportunity. Those investments total between $30 million and $40 million over the next 2 years and ultimately support the double-digit rate base CAGR that we talked about at our Analyst Day.

G
Gabriel Moreen
analyst

Got it. And then maybe if I can switch a little bit the midstream side of things. Can you just maybe talk about some of these new contracts at Leaf River? Do you think those were prompted mostly by winter storm, LNG, all of the above? And I'm just curious, relative to expectations, what the pricing has been on those contracts, whether you're seeing some sort of uplift relative to prior contracts?

S
Stephen D. Westhoven
executive

So a number of those were in motion prior to Uri occurring. But certainly, an extreme event like that doesn't hurt the contracting on a forward basis for any facility down in that region. I think as gas becomes such an important part of making a reliable energy mix that quick turn storages like Leaf River will become even more valuable. But just a little bit of color, I think it's probably similar to slightly ahead of what our existing contracts were. So overall supporting the investment thesis that we had for making the investment in Leaf River, and it's certainly very supportive of essentially the market going forward.

G
Gabriel Moreen
analyst

Great. And then last one for me, if I can. Just on the CEV side of things. If I'm hearing correctly, it doesn't sound like the shifting regulatory landscape in New Jersey is altering either your CapEx plan in the state versus out of state? And can you just speak to whether or not you think the shifting landscape alters the earnings trajectory significantly here over the next, call it, 24 months over the 5-year plan?

S
Stephen D. Westhoven
executive

No, it doesn't alter it. I think what we expect is New Jersey has been a strong supporter of solar for quite some period of time. And if you look at the target capacity that they want to install over here, it's about 750 megawatts per year. And typically, we've been installing about 300 megawatts per year over the past 10 years. So I think that that's a statement in itself. And we expect that the programs that they're rolling out that we'll be able to participate, and we're optimistic for the future. So we're not expecting to change in any guidance that we've given in the past due to this.

Operator

Our next question is from the line of Travis Miller from Morningstar.

T
Travis Miller
analyst

Assuming you had a constructive outcome in the rate case, and as you look in the capital plan, what's your thought of medium-term timing on going back to regulators for either rate relief or potentially even some kind of project-specific type of tracker or something like that?

S
Stephen D. Westhoven
executive

So I'm going to ask Mark Kahrer to answer that question.

M
Mark Kahrer
executive

So Travis, we are taking a look at the timing of our next rate case, the next base rate case. That was in our Investor Day. We think that somewhere out into '23, '24 time frame. That's contingent upon the completion of the IT projects where we're basically expanding substantial capital on both the replacement of the working asset management system and the customer information system. With respect to other infrastructure trackers that we might have, we're right now assessing as we wrap up our SAFE II program what a Successor program could that may look like. So we do have vintage pipe that where the code, [ disaster ] code existing right now . It is cathodically protected. So we're assessing both the timing of that and the timing of that assessment and the timing of that infrastructure tracker as well.

T
Travis Miller
analyst

Okay. Great. And then just to follow up on the previous question about the incorporation of the hydrogen system. Do you think there's regulatory backing or supports to put a tracker in for those type of products? Or is that something that you foresee going through future base rate cases?

S
Stephen D. Westhoven
executive

So Travis, I mean it certainly aligns itself with the Governor's Energy Master Plan and certainly decarbonizing our fuel stream and deliver it to our customers. So I think the way to answer that question is that we're working through the process now. We've got an ongoing rate case and certainly a project that's active. And we're optimistic that due to the alignment with the administration that we should be able to receive some regulatory treatment of that for our customers.

T
Travis Miller
analyst

Okay. And then just real quick clarification. Would you anticipate putting that -- the project that's going on right now, the powered gas in a future rate case? Or have you already talked about a potential tracker, if you see stuff like that?

S
Stephen D. Westhoven
executive

That project is part of our filed rate case that will hopefully conclude at the end of this calendar year.

Operator

[Operator Instructions] Our next question is from the line of Julien Smith from Guggenheim Partners.

K
Kody Clark
analyst

It's Kody Clark from Bank of America here. So maybe if we can go back to the Solar Successor program quickly. And I think previously, you're assuming 0.9 factor on the TREC going forward. And you had that revenue mix kind of out through 2024 of -- I think it was around 20% just from TRECs. I'm wondering how you're thinking about that going forward with this new incentive level? What are you assuming for new projects? What incentive level are you assuming? And then I guess how does that revenue mix change going forward?

S
Stephen D. Westhoven
executive

So Kody, Pat can answer the question on the details with TREC factors.

P
Patrick Migliaccio
executive

Yes. Kody, it's Pat Migliaccio. I think obviously, there are a number of various incentives underneath the Successor program. And so our prior assumption as of the Analyst Day that we've baked in was that roughly 50% of our projects would have been sourced within New Jersey, 50% outside of New Jersey. As we communicated, that was a planning assumption. Ultimately, what we've actually seen date is that 20% of the projects are out of state, leaving the majority in state.

The Successor program is broadly supportive of continued investment. And at the end of the day, we're going to direct our investments towards those projects that allow us to preserve the returns achieved and get it closer to that 7% to 7.5% IRR. And so that's the way that I think you're getting to a modeling question here, which is if you just think about support level to get you to that 7% to 7.5% IRR.

K
Kody Clark
analyst

Okay. Got it. And then just on the 750-megawatt goal that New Jersey has outlined versus kind of what we've been seeing historically, that 300-megawatt level, wondering what you've seeing historically in market share of that 300 megawatt and then what you're assuming going forward?

S
Stephen D. Westhoven
executive

I think historically, we've been about 10% of the market share. So we'll see how it ends up playing out. The BPU will be doing a solicitation for large projects, and we'll be participating in that. But as things progress, we'll certainly keep everybody informed how we're doing.

K
Kody Clark
analyst

Got it. Okay. And then sorry to stick with the Clean Energy Ventures being here, but it looks like you narrowed your CapEx estimates on the commercial solar side just quarter-over-quarter. What's driving that confidence and being able to narrow your CapEx range?

And then second to that, how are you seeing the kind of inflationary backdrop that we've seen with panels and freight and everything? How is that playing into that?

S
Stephen D. Westhoven
executive

So I'll -- Pat and I were motioning on who's going to take the question. So I'll take the second part of the question as far as the inflationary. So if you look at the projects that we have in the pipeline for the next 2 years, we largely have, I guess, the majority of the materials purchased or locked up as far as it goes. So we're -- we'd be dipping into late '22 or early '23 into kind of the inflationary pressures, if there are any at that point. As far as the CapEx narrowing the guided range, Pat, would you want take that?

P
Patrick Migliaccio
executive

Yes. so Kody, in terms of narrowing the range, it really ties back to the fact that we've got over 70% of the projects identified in the pipeline. So a clear line of sight on what those projects look like, what they'll cost. And so that confidence in the pipeline allows us to narrow the range of the capital plan.

Operator

Thank you very much. As there are no further questions, I now hand the conference over to the presenters. Please go ahead.

D
Dennis Puma
executive

Okay. Thank you, Zed. I want to thank everyone for joining us this morning. As a reminder, a recording of this call is available for replay on our website. As always, we appreciate your interest and investment in New Jersey Resources. Please stay safe, everyone. Goodbye.

Operator

Thank you very much. Ladies and gentlemen, this concludes today's conference call. You may now disconnect your lines. Thank you.