Freeport-McMoRan Inc
NYSE:FCX

Watchlist Manager
Freeport-McMoRan Inc Logo
Freeport-McMoRan Inc
NYSE:FCX
Watchlist
Price: 43.72 USD -0.09% Market Closed
Market Cap: 62.8B USD
Have any thoughts about
Freeport-McMoRan Inc?
Write Note

Earnings Call Transcript

Earnings Call Transcript
2022-Q3

from 0
Operator

Ladies and gentlemen, thank you for standing by. Welcome to the Freeport-McMoRan Third Quarter Conference Call. [Operator Instructions] I would now like to turn the conference over to Ms. Kathleen Quirk, President. Please go ahead, ma’am.

K
Kathleen Quirk
President

Thank you and good morning everyone. Welcome to the Freeport-McMoRan conference call. Earlier this morning, we reported third quarter 2022 operating and financial results, and a copy of today’s press release and slides are available on our website at fcx.com. Our call today is being broadcast live on the Internet and anyone may listen to the call by accessing our website homepage and clicking on the webcast link for the conference call. In addition to analysts and investors, the financial press has also been invited to listen to today’s call and a replay of the webcast will be available on our website later today.

Before we begin our comments, I’d like to remind everyone that today’s press release and certain of our comments on the call include forward-looking statements and actual results may differ materially. I’d like to refer everyone to the cautionary language included in our press release and presentation materials and to the risk factors described in our annual report on Form 10-K filed with the SEC.

On the call today with me are Richard Adkerson, our Chairman and Chief Executive Officer; Maree Robertson, our CFO, is on the line; Josh Olmsted, who heads our Americas operations is on the line; Mark Johnson, who heads our Indonesian business is on the line; Rick Coleman is on the line, who have helped us with the projects and construction; Cory Stevens is on the line, who is spearheading our engineering and technical services groups, including the leaching initiatives; and Mike Kendrick is on who runs our molybdenum business; we also have Steve Higgins, our Chief Administrative Officer. Richard is going to make a few opening remarks and then we will turn to our presentation, slide materials and go through that and then open up the call for questions.

And so now I’d like to turn the call over to Richard for his opening comments.

R
Richard Adkerson
Chairman and Chief Executive Officer

Thank you, Kathleen and we really appreciate each of you joining our call today. I am just going to make brief comments about how our company is positioned in the current market and for what we believe will be a very bright future for the copper business as we go forward.

As we talked about on our last call, it remains a world of two cities. The macroeconomic sentiment continues to be weak and you all see that in your everyday lives. On the other hand, the fundamental physical copper market is strikingly tight globally right now. The macroeconomic situation is driven by the strength of the U.S. dollar, the Fed and central banks tightening, concerns about China dealing with COVID in this property section and then the serious problems in Europe coming out of the Ukraine situation and how that’s affecting energy prices and economic outlook. All those things are realities we have to face up with, but we continue to work to position our company to deal with these situations.

We now have a very strong financial situation that allows us to do that effectively and we are increasingly confident about the outlook and position of the copper markets and where Freeport is positioned to take advantage of that and our confidence continues to grow. Global copper inventories remain at historical levels. You see production reports from producers across the globe reporting challenges in meeting their production targets and the industry is facing increasingly challenges in developing new supplies. In the current environment, stretch supply chains, production shortfalls are becoming commonplace and cost curves are rising. We, at Freeport, are realistic about the potential for weaker global GDP. We prepared our business and taken steps and have plans for other steps to take, depending on the near-term steps as what occurs. We have an old saying around Freeport. We don’t ring our hands we roll up our sleeves.

The positive thing is that new sources of copper demand are emerging now and there is widespread recognition that copper demand will be significantly benefited by the ongoing global electrification around the world, investments to reduce carbon, they are beginning to accelerate and this is going to occur more rapidly in the future and it’s going to be a big impact on copper demand.

To meet that demand, the energy transition will require a massive amount of copper and other steps to deal with it. Higher prices will be required to bring on new supplies, much higher prices than we have now, simply because the current price is not sufficient to incent new supply development on the scale that will be required to meet this increasing demand. I am real proud of our Freeport’s global team. We are focused on executing our plans effectively and focused on managing what we can control and not getting distracted by things we cannot control. I want to particularly highlight our Grasberg team for the great results they achieved this quarter and the ongoing success our team is achieving in ramping up the large-scale, low-cost underground operations in Indonesia.

Just 3 years ago, we were completing mining the open pit and what this team has achieved despite the challenges of COVID is truly remarkable. I was pleased to visit our site in Papua during this past quarter and had the pleasure, along with our team, of showcasing what we have accomplished during a visit by Indonesia’s President, Joko Widodo. He was the first President of Indonesia to visit our job sites and Suharto did in the early ‘70s when production there commenced. And it was truly a pleasure to be able to show him what we have accomplished what we are accomplishing in the underground and to point out our workforce there, where 98% of our employees are Papuans – are Indonesians and over 40% of Papuans.

It’s really noteworthy that he was there. And he expressed a lot of positive comments about it. For me, it was something that was really special since I have been going there for over three decades and to be able to review it with him. As a follow-up, he asked me to accompany his Minister of Investment on a roadshow type tour of 6 universities, 7 universities in Indonesia and they estimate there was 10,000 students and faculty at these sessions as well as it was streamlined to many more. That was a special time for me and for our company and it just illustrates the much improved partnership we have now with the government of Indonesia and the President and his Ministers.

I just want to close by saying just to reemphasize how I believe we are well positioned at Freeport to be a global leader in the copper business. We have long life reserves, large scale global operations, established track record of managing responsibly the development and operation of among the largest mines in the world. We have got a great team that’s been experienced and stuck together through all the things we faced. And so I am just very pleased about that.

We are going to take steps to create value for this company over time. You will hear today about the exciting work we are doing with leaching technology that can add values in a low-cost carbon-friendly way. We have got large scale brownfield development projects ahead of us and we are going to use technology, continue to use technology to help us operate efficiently and create value.

So with that, I am going to turn the call over to Kathleen, who will review the quarter and our outlook. And then I look forward to your questions.

K
Kathleen Quirk
President

Thank you, Richard and we will start on Slide 3 with a summary of the quarter’s highlights. As you have seen, we achieved strong production and sales performance in the quarter. And as Richard mentioned, we are continuing our focus on effective execution of our plans in a challenging environment. Sales volumes for copper were 3% higher than last year’s third quarter and 4% higher than our guidance going into the quarter. Our gold sales were above the year ago quarter by 19% and 20% above our July guidance and that reflects very strong performance at Grasberg during the quarter.

From a cash cost standpoint, our consolidated average unit net cash cost were $1.75 in the quarter, they averaged $1.75 and that was about 5% above our estimates going into the quarter. As Richard referenced, cost pressures continue to be a significant issue for our operations and really across the global mining industry. In the current market, many of our input costs are above historical correlations to the copper price. We can’t predict how long this dislocation will occur, but based on history, we typically see a high correlation of many of our input costs with the price of copper. As Richard mentioned, we are going to continue to focus in those areas of cost and efficiencies that we can control to help mitigate these cost increases.

Adjusted EBITDA in the quarter was $1.5 billion. This was net of $228 million reduction associated with copper sales that were provisionally priced at the end of June at $3.75 per pound, which remains subject to final settlement. The decline in copper prices during the quarter resulted in this negative adjustment. We have got a reconciliation of the EBITDA calculations on Page 31 of the slide deck.

Adjusted net income for the quarter was $375 million. That excludes $0.02 in non-recurring gains that are detailed on Roman numeral Page 7 of our earnings release, so $375 million or $0.26 per share in the third quarter of adjusted net income. Operating cash flows of roughly $800 million in the quarter approximated our capital expenditures. Our capital spending during the quarter included $400 million for major projects, principally associated with our Grasberg underground projects and $200 million to advance construction on the Indonesian smelter.

During the quarter, we continued opportunistic purchases of our public debt securities in open market. So far, in 2022, we have purchased approximately $1.1 billion of our notes at a discount to par, including $400 million in principal amount in the third quarter. The market conditions in recent months have provided a great opportunity for us to reduce our absolute debt levels at attractive prices and these purchases generate approximately $50 million per annum and interest cost savings.

We continue to maintain a strong balance sheet. We have got a large cash balance and significant liquidity. We ended the quarter with $1.3 billion in net debt, excluding the $800 million in net debt associated with the Indonesian smelter. That’s well below our targeted net debt range of $3 billion to $4 billion. The authorization under our share purchase program remains at $3.2 billion. Since reaching our net debt target in the range of $3 billion to $4 billion in the middle of last year, we have used over 50% of our free cash flow for shareholder returns. That totaled $2.7 billion in share purchases and dividends over that period. We did not purchase shares since mid-July and that reflects our priorities on our balance sheet and our policy of using excess cash flows for shareholder returns and the timing of our future purchases will be dependent on our cash flows and overall market conditions.

I want to point out that we recently published our updated Annual Climate Report that’s available on our website. The report includes an update on our progress to improve our energy efficiency and integrate lower carbon alternatives into our operations and we are making great strides in that area. As Richard talked about and we talked about on our July call, we commented on the magnitude of the sharp decline in copper prices that we experienced in recent months. We benefit from having the balance sheet, the asset quality and experience to successfully manage the volume in uncertain market environment. And despite the recent weakness, we remain confident in our strategy centered on being foremost in copper. We are positive about the strong future fundamentals for copper and the strength of our assets and team to increase value for stakeholders.

I will move to Slide 4, which is a graph of the year-to-date copper prices. We discussed on our last earnings call that the price move appeared to be anticipatory and financially driven by global macroeconomic conditions. This backdrop continues to be challenged by rising interest rates to tame inflation, concerns about Chinese economic growth and pressures in Europe associated with energy and geopolitical turmoil. We also indicated on our last call that markets remain strong, physical markets remain strong for copper. Our customers are reporting solid orders. Physical market was tight as evidenced by low levels of inventories. The situation is much the same today. Copper demand remains healthy. The industry continues to struggle to meet production targets and inventories remain low by historical levels.

And as we look forward, we see copper demand that will benefit from the substantial requirements for metals required for electrification and the energy transition. This new demand is emerging and is driven by secular trends rather than economic cycles. The industry does not have a current pipeline to meet this demand and the recent weakness in copper prices will only make this development more difficult. Richard talked about we are realistic about the current macro conditions creating uncertainties, but we do have strong conviction about the long-term fundamentals for the copper markets and we expect to start seeing as we go through this period of increased demand from decarbonization, large gas supply-demand gaps emerging in the copper market.

On Slide 5, we will turn to operations and you will see we present here a summary of our sales by region for the third quarter. And I’ll just go through around the globe how our teams are doing. Starting with the U.S., our teams are focused on meeting our production targets safely and efficiently in overcoming challenges with limitations on available labor. We are ramping up the Safford mine, we are ramping up mining rates in the U.S. and we are aggressively pursuing leach production and continuing to study the possible expansion of the Bagdad mine in Northwest Arizona.

Moving to South America. Our team at Cerro Verde in Peru continues to execute very effectively and produced at an average of over 400,000 tons of ore per day through the concentrator during the quarter. We faced some challenges during the quarter with byproduct molybdenum productions, and that impacted net unit cash cost. The team is doing great work to overcome this challenge as we look forward into the fourth quarter and beyond. And we’re particularly proud of the exceptional work Cerro Verde does in the community, and that provides a sustainable model for the operations. At El Abra, we’re continuing to optimize the existing operation, while we consider the larger expansion options in the future.

Richard talked about Grasberg. We benefited from continued outstanding execution of the plans that allowed us to exceed our third quarter sales guidance with strong production results in the quarter, higher than forecast grades and an exceptional loading and shipping performance. The team loaded and shipped all of its third quarter production and available concentrate inventories during the period. We’re also continuing to advance several projects at the site related to our mill work to add a new mill circuit, working on power infrastructure, we’re continuing to advance the development of Kucing Liar and we’re progressing with construction of the new smelter in Eastern Java, with a targeted completion of that project in 2024. We show unit costs at the bottom of the slide on a consolidated basis. As I mentioned, the costs in the third quarter were about 5% above our guidance. That mainly, on a consolidated basis, was associated with higher maintenance and the increased cost of supplies.

Breaking it down by region, the U.S. was challenged with higher maintenance, supplies and labor. In South America, the variance to our expectations related to lower molybdenum by-product credits, and Grasberg was in line with our prior estimate, but they were offsetting variances, higher maintenance costs and supply costs were offset by stronger gold byproduct credits in the quarter. We have adjusted our annual cost guidance for 2022 to average $1.55 per pound. That compares with the previous estimate of $1.50 per pound and we’ve got a reconciliation provided in the reference materials on Slide 22.

On Slide 6, we wanted to highlight the progress at Grasberg that Richard referred to. Since reaching the targeted run rate in the second half of last year, the team at Grasberg has just done a great job demonstrating sustained large-scale production for several quarters now. We benefit from our industry-leading expertise in block caving and we’re effectively managing the largest underground mining complex in the world. This is a major accomplishment, not only for our company, but in the history of the global mining industry. The resource at this site where we’ve been operating for over 5 decades is significant. And with the success of this project, we’re engaged in discussions regarding an extension of our operating rights beyond our current 2041 time frame.

Richard talked about earlier we have got some pictures from the visit on the slide. We were honored in late August to host Indonesia’s President at the Grasberg site. He toured the site extensively. He visited the former surface mine, had an in-depth tour of the underground and actively engaged with our team. He expressed great pride over what has been achieved technically and for the people of Papua in the country. It was really a happy time, special time for our entire team who’s worked so hard over the years to make this project such a success.

Another exciting area that we wanted to talk more about today on Slide 7 is our reach innovation initiatives. This is really focused in the Americas and our drive – we’re capturing higher recoveries from leach stockpiles is gaining a lot of momentum. The economics of this opportunity are extremely attractive, very low capital intensity, low incremental operating costs, low carbon footprint, the lowest cost copper units in our Americas portfolio and the carbon intensity is low because the mining costs have already been incurred. And so essentially, we’re doing here is extracting more copper from what historically would be considered waste.

We are using new data analytics capabilities, and those are providing valuable information to guide us and prioritize our work on the highest value. We’re continuing efforts to retain heat in the stockpile. We are moving forward to apply covers to our leach stockpiles because the retention of heat within the stockpiles is proving to enhance recoveries. We’re also applying solutions to new areas that were not pursued historically. And we continue to test various additives that can further enhance recoveries.

The progress to-date and early results are leading us to a target run rate of 200 million pounds by the end of next year, and that is at the top end of what we were prior thinking was 100 million to 200 million pounds. Success at this level would give us a road map to scale larger, and that’s what we’re focused on. And we’re really taking advantage of the long history we have in leaching significant stockpile material, the availability of new technologies that weren’t available in the past and we’re in a really strong position to lead the innovation in this area. We are managing this project and this initiative as we would a major project. And when we think about it, it’s similar to a – has a similar production to what we would look at, at a project within the U.S. to add concentrator, but we don’t have the capital associated with it and the operating costs are very low. So we’re allocating a meaningful amount of significant expertise and technical resources and are aggressively pursuing this opportunity.

I am going to move to Slide 8, which provides a 3-year outlook for our sales volumes. As you’ll see, the 2022 volumes are very similar for copper, 4.2 billion pounds of copper for 2022. Gold sales are about 5% higher than our prior estimate for the year and that reflects the [indiscernible].

The sales mix for 2022 is roughly 35% coming from the U.S., 28% from South America and 37% from Grasberg. You’ll note that our 2023 copper sales guidance have been adjusted. They are lower by about 150 million pounds from our prior estimate. That’s roughly 3%. About half of this is a timing matter and does not represent a production shortfall. And this goes to a change in the commercial agreement of our arrangement with PT Smelting, the existing smelter in Indonesia, which we own a 40% interest in currently. That commercial arrangement is converting in 2023 from a purchase and sale agreement to a tolling agreement.

And so PT-FI’s production a portion will be deferred in inventory until final sale, but it does not represent a production shortfall. And in fact, PT-FI’s production is going very well in line with expectations. The balance of this change is associated with updated mine plans in the Americas, and that includes the impact of anticipated lower grades than we were previously forecasting for 2023 at Cerro Verde. The rest of the guidance is pretty similar to what we were guiding to last quarter.

And we are going to move to cash flows on Slide 9, and you’ve seen these charts before. As a leading producer of copper, our earnings and cash flows have significant leverage to the price of copper. And we show modeled results for our EBITDA and cash flow at various prices and with the current cost structure of the business, which, as we’ve talked about, has increased in recent quarters. We have shown a broad range of prices ranging from $3 per pound to $5 per pound. Just to recall – remind everyone in the first half of this year, prices averaged nearly $4.50 a pound, and we’re approaching $5 a pound earlier in the year. We don’t believe the current copper price is sustainable long-term given the cost structure of the industry, the need for new supply development in the future.

Modeled results using the average of ‘23 and ‘24 with the current volume and cost estimates, holding gold flat at $1,700 per ounce and molybdenum flat at $18 per pound, our annual EBITDA would range from roughly $6 billion per year at $3 copper to over $14 billion per year at $5 copper. And our operating cash flows net of all of our taxes would range from $4 billion per year, $3 copper, to $11 billion at $5 copper. So a lot of leverage to the price of copper. We show sensitivities to the various commodities on the right. As Richard talked about, we’re prepared to manage in a low-price environment, while retaining optionality for what we believe will be a much more positive situation as we go forward. And we’ve got this long-lived asset base that will prove to be valuable given the compelling fundamental outlook.

Looking at our capital expenditures on Slide 10. You can see that we’ve reduced the 2022 capital forecast by $400 million, drawn from $3.1 billion in our prior forecast to the $2.7 billion in the current forecast. About half of that has shifted into 2023. As we’ve talked about all year, we’ve been spending capital at a slower pace than our original plans. This has something to do with just the supply chain and labor and other things that have deferred the projects. But we’re continuing to prioritize the critical projects. We’re going to continue to evaluate opportunities as we look at our capital spending plans in the context of the market environment to defer spending where and when it makes sense.

We have a lot of flexibility with our plans, and we benefit from the fact that the major investments required for the Grasberg transition are largely behind us. These amounts exclude capital for the Indonesian smelter project. That project is being funded with cash from a bond offering that we raised earlier in the year. There is some details on this project and its progress in the reference materials on Slides 27 and 28. Construction is moving forward. We’re working to complete the project as early as we can. We currently expect it to complete it in 2024. And to date, we’ve invested about $800 million in this project.

We will talk for a minute about the financial policy and our strong balance sheet. Going to the balance sheet, it’s really the cornerstone of our financial policy. The steps we’ve taken in the past placed us in an exceptionally strong position, particularly in the context of the current market weakness. We don’t have a need to raise new capital for the foreseeable future. And essentially, all of our debt is fixed rate. We continued, as I mentioned, our opportunistic purchases of debt during the quarter and have repurchased over $1 billion in senior notes at attractive prices.

The slide here shows our net debt at $2.1 billion at the end of the third quarter. That includes $800 million for the smelter. So when we look at our net debt compared to our target, it’s $1.3 billion, which is below our net debt target of $3 billion to $4 billion. And so that gives us some cushion. We’ve also got a very much cash balance of $8.6 billion, and that continues to provide significant liquidity for us. As you’ll see here, we have a very attractive debt maturity profile. We’ve got easily manageable maturities. We’ve taken steps to improve financial flexibility. We did some transactions to increase PT-FI’s revolver. We did the same thing at Cerro Verde. And just this week, we completed the extension of our corporate revolver, which was previously planned to mature in ‘24. We’ve extended that to 2027.

In closing, we’re showing a scorecard on Slide 12 of the shareholder returns, which has been substantial since reaching our net debt targets last year. Just as a reminder, the financial policy provides for the distribution of 50% of our free cash flow and shareholder returns with a net debt target in the range of $3 billion to $4 billion, excluding the smelter debt. We pay a base dividend and a variable dividend totaling $0.60 per share, and $0.30 per share of that is variable. We’ve used $1.8 billion of our $5 billion in share purchase authorization. Our variable dividend is continuing through 2022, and our Board will have the opportunity to review future dividends depending on performance. As I mentioned, we’ve returned $2.7 billion to shareholders. This represents over 50% of our free cash flow over this period, and we’re well below our net debt targets.

As I mentioned, we did not purchase shares since July ‘22, and that reflects just the priorities on the balance sheet, the impact of the sharp decline in copper prices on our cash flows. We’re going to continue to prioritize our balance sheet. We believe that maintaining the balance sheet strength in various market conditions is really important in our ability as we look forward to drive long-term returns for our shareholders.

We’re focused on long-term value, focused on execution, doing this responsibly, safely, efficiently. In the near-term, with respect to growth projects, we’re going to continue to define our future options, but expect to defer new major investment decisions in the current market environment. We’re convinced the world is going to need our projects in the future, and prices will need to move higher to incentivize the new project development. Richard talked about the pipeline of options we have. We’ve got a lot of flexibility in terms of the timing of development of these options, particularly the expansive options we have for development of new supply in the U.S.

In closing, we’re optimistic about the value of our assets, the strength of our team, the fundamentals of the copper business and the future prospects for the markets we serve. I will stop there and we will – operator, we will open up the call for questions. Thanks, everyone, for your attention, and we look forward to your questions.

Operator

[Operator Instructions] Our first question will come from the line of Emily Chieng with Goldman Sachs. Please go ahead.

E
Emily Chieng
Goldman Sachs

Good morning, Richard and Kathleen. And thanks for taking the time this morning. My question is just around the leaching technology. And understandably, it’s a low CapEx opportunity there to continue to bring production growth. So I wanted to understand the guidance that you have of 200 million pounds per annum by year-end 2023. That’s the run rate that you’ve targeted. Could you perhaps share what volumes you are seeing from leaching activities today? And how should we be thinking about ramp profile to get there? Thank you.

K
Kathleen Quirk
President

Thanks, Emily. We have experienced some positive, and that’s what’s given us more confidence to get to this run rate. We have experienced some improved recoveries, particularly at Morenci, where that’s been the start of this focus was at Morenci. That has offset the improvements that we’ve had in leach production during 2022, has offset some shortfalls we had in 2022 associated with lower placements as we struggle through labor situation with mining rates. But in terms of the actual benefits to date, we are starting to see those. So you’re talking about, by the end of next year, getting to 50 million pounds per quarter on a run rate basis. We’re already probably third of the way there in terms of what we’re seeing now. But what we’ve got to do is not only see the improvements in recovery, but get the material placed. And that’s been the challenge in 2022 is getting additional material placed to meet our base production. But the leach initiative has helped us offset some of these shortfalls in other areas.

E
Emily Chieng
Goldman Sachs

Great. Thanks, Kathleen. If I could squeeze one more just on the Bagdad expansion. It sounds like that’s been at least pushed into 2024?

K
Kathleen Quirk
President

Well, we’re completing the feasibility study. We expect to complete the feasibility study in the first half of next year. And so we will have the opportunity at that point to look at the situation, look at the availability of labor, look at the inflationary environment that we’re in, in terms of executing a project in the environment and look at the overall market conditions. So what we’re doing now is really getting to a point where we can make a decision and have the project feasibility ready to go so that we will have optionality of when to start it. But I think it’s fair to say if we wouldn’t pull the trigger today to start. We need to see some improvements in just the overall availability of labor, need to see some improvements in just the tightness that’s going on in supply chains and the tough execution environment for construction projects and just the overall copper market. But these are options that we have. And so we don’t have any kind of time line to start it. We want to start it when it makes sense when the market needs it, and so we have that flexibility within the portfolio to do that. But we’re continuing the feasibility study so that we can be in that position next year.

E
Emily Chieng
Goldman Sachs

Great. Thank you.

Operator

Your next question will come from the line of Chris LaFemina with Jefferies. Please go ahead.

C
Chris LaFemina
Jefferies

Hi, thanks, operator. Hi, Kathleen. Hi, Richard. Thank you for taking my question. So my question relates to some of the operational and financial flexibility that you have. So if you think back to early 2016, you had $20 billion of debt, very little cash out to issue equity, sold assets, not in a great position at that time to weather the storm of difficult markets. Whereas today, you have low net debt, you have high cash, your net debt is well below your target range and you have multiple levers that you can pull in the event that macro conditions reconvert this. So obviously, the first lever, which looks like you’re pulling already, is kind of suspending the buyback until things improve. But you still have a couple of billion dollars of kind of leeway on the balance sheet before you get into your net debt target range.

Let’s assume that commodity markets get worse, and we’re kind of stress testing the business and you’re burning cash for the next kind of 12 months based on your current operational and spending plans. When you get into that targeted net debt range, what are the levers that you can pull next? Are there kind of CapEx reductions that you can make? Are there mines that you’ll take offline? I mean, the cost inflation is kind of prominent in the industry, and copper price isn’t really doing much. So eventually, I would assume that some of these mines become loss-making. So what are the levers that you can pull over time in the event that market conditions weaken further? And again, you probably have 12 months of leeway before you need to consider that. But where do you look next to kind of protect the balance sheet in the business?

K
Kathleen Quirk
President

Richard, I’ll take that. And you can add to it. Or you’d like to go first?

R
Richard Adkerson
Chairman and Chief Executive Officer

No. No, Kathleen, go ahead.

K
Kathleen Quirk
President

Yes. Chris, historically, what we’ve done, and we’ve got a really, really experienced team at this. Historically, what we’ve done is look at each mine individually and looked at opportunities to reduce cost, to keep mine’s cash flow positive during weak environments. And what’s different right now, and I don’t – if we do get into a recession, I think that we’re going to start to see some of these historical correlations come more in line. But right now, we’ve got the copper prices that have declined significantly, but input costs have not at this point. I think that if we do get into a really tough situation, our cost situation may get some risk. But in any case, what we do is we go through each mine, look at the operating plans, determine how we can optimize those operating plans. What it tends to mean is that we tend to look at where can we cut back on the mining rate to get to a better cash flow situation. We did that in 2020. We’ve certainly done it ‘08, ‘09. We did it in ‘15, ‘16. We’ve done it multiple times. So we do – if we get into the situation, where it is – we’ve got big surpluses building in copper, the world doesn’t need our copper, we certainly have the playbook on how to address that. The difference now is that the world does seem to need our copper. So the inventories are very tight. We’ve been recovering from the 2020 downturn where we took down a lot of production, took down a lot of mining rates and we’re ramping back up. And it takes a long time to get that flywheel going. So I don’t think we’re going to be very rash to cut mine rates and do what we need to do, unless it’s a very difficult situation.

Now what’s different now than it was in 2020 is Grasberg is doing so well. And the match of having our Grasberg mine it really does provide very strong results, one of the lowest cost mines in the world. And so that – having that line up and running and doing so well is a benefit. We’ve also got a very different balance sheet than we’ve had historically. But we’re going to be smart about how we look at this. We’re not going to produce at a loss. If the world needs our copper, it needs to be – we need to have a margin. So we’re going to do what we need to do, the levers that we have to pull are the same levers that we’ve had in the past, big reductions in CapEx probably the first thing. And then we will start looking mine by mine on how to change the operating plans. But the difference, again, I just want to emphasize, you look at the forecast for this decarbonization and the world appears to need more copper rather than less and that copper demand is not [indiscernible] to these economic movements. So we are agile, we are nimble, we will do what we have to do, but I think it is different now than it has been in the past.

R
Richard Adkerson
Chairman and Chief Executive Officer

Thanks. No question about that. I mean, 2016 was a crisis for our company. We’re not anywhere near crisis now. And since then, we’ve had 2 major accomplishments that’s de-risked our business significantly. One was the 2018 agreement that we reached with the government to stabilize the situation we had in years about the structure of our taxes, royalties and operating rights. And now we’ve had 4 years of operating under that and it’s going very well as you can see by presence visit, etcetera. And then as Kathleen mentioned, de-risking Grasberg by ramping up the underground and being so effective in sustaining the rates there. We’re going to be able to do that by continuing to operate effectively. We’ve got this Kucing Liar ore body that we’re developing that’s an add-on to give us stability. And so we’re back to the strategy that we’ve always had, Grasberg generates cash in any environment, it can fund our G&A and then we challenge each of our other mines to manage their business to be at least breakeven on a cash basis.

C
Chris LaFemina
Jefferies

Thank you.

Operator

Your next question will come from the line of Alex Hacking with Citi. Please go ahead.

A
Alex Hacking
Citi

Yes. Thanks, Richard and Kathleen. Just a quick clarification on the leaching. If you are successful in getting to that 200 million pound rate by the end of next year, should we be then thinking about that adding on to the existing 4.2 billion pound guidance for 2024? Thank you.

K
Kathleen Quirk
President

Yes.

R
Richard Adkerson
Chairman and Chief Executive Officer

We will give you – definitely. I mean, the possibilities here are really exciting. And we don’t want to get way out ahead of ourselves because it’s still in the development mode. But with a sizable leaching operations we have already in place throughout our company, the ability to use this technology to add volumes is really exciting and could be meaningful. And then beyond that, we have historical lead stacks and conceivably using this technology to replace concentrated investments with some of our sulfide ore bodies. So it’s really something. We’re not – we’re using a number of different approaches, some proprietary, some in partnership with others, and we will give you a report every quarter on how we’re progressing with it and how we see it affecting our future.

A
Alex Hacking
Citi

Okay, thanks.

K
Kathleen Quirk
President

Yes, we’ve got about third of that included in our numbers, Alex. And so there is certainly upside. And our team, we want to get to this initial target, but our team believes that with success there, we can scale it further. So for us, this is – in the near-term, this is an area with low-cost units to our Americas business and particularly in the U.S.

A
Alex Hacking
Citi

Okay, thanks. That’s clear. But one-third of it is already in the guidance. And then just on the cost side, I mean, your tone sounds like you’re not really seeing any cost alleviation yet. We have seen FX sort of moving in the right direction for you. Maybe headline energy prices come off a little bit, freight come off a little bit. How are you thinking about the cost environment as you head into 2023? Thank you very much.

K
Kathleen Quirk
President

Well, we were encouraged in the third quarter our costs were pretty close in line with what we had forecast going into the quarter and sequentially down [ph] for the quarter. With the exception of coal, we have had very, very high oil prices in Indonesia, which continue to remain at way above historical levels. So some of the headline, commodity prices have come down, and we’re encouraged by that. An area that we are seeing increases has come through is more non-commodity – non-direct commodity, more indirect, where we are seeing the parts and equipment and other supplies that we purchased come in at higher cost with recession potential, that will give us some leverage to push back on some of these things. So, the headline numbers, we have seen some relief in. But there are some other underlying areas where we are continuing to see price increases being passed through to us that we are continuing to manage as best we can. You are right about the currencies. That benefits us in South America, Indonesia. And going into the quarter in terms of our guidance, you can see Cerro Verde wasn’t that much different than our guidance. The main thing at Cerro Verde was the Mali issue that we had. But in the U.S., we don’t get the benefit of the currencies. So, we are – as we look into 2023, at least right now for our forecast purposes, we are projecting what it is now. So, hopefully, if the markets are to turn weaker, we will have some better ability to cost down. But right now, for forecasting purposes, we have essentially included what we – what the current market environment is.

A
Alex Hacking
Citi

Okay, thank you. Best of luck.

Operator

Your next question will come from the line of Matthew Murphy with Barclays. Please go ahead.

M
Matthew Murphy
Barclays

Hi. I am wondering if you have any thoughts you can offer on what might lay ahead on the legislative agenda in the U.S. for the mining sector. There has been lots of talk on critical minerals and just a few mummers on permitting changes or debate around the Mining Act. So, I am just wondering if there is any sort of big opportunities or threats out there in what may lay ahead.

R
Richard Adkerson
Chairman and Chief Executive Officer

Well, I mean it’s going to continue to be a matter of discussion. But the practicality is affecting our business are that – just a couple of facts, I think most of you know this. But we own virtually all of the lands and see where we have mining operations. So, we don’t really pay royalties in the U.S. There were some impacts of inflation reduction acts in terms of alternative minimum tax, and we are still sorting through those. But there is a favorable Federal tax rate. We have net operating loss carry-forwards from our oil and gas deal. We have – in our case, we have great relationships with the states which have the principal regulatory authority over our mining business and expansions, great community support, where we operate, including the native American groups who want us to invest in hiring their people and working together. So, there will be a lot of lip service doing this. We are not counting on any big government-based type incentives for us in the future. We hope people get more reasonable in progressing permitting processes by investing and having resources available to deal with things effectively. But we continue to deal with the fact that politics are shorter run than our business is. And we just have to see.

M
Matthew Murphy
Barclays

Okay. Thanks Richard.

Operator

Your next question will come from the line of Orest Wowkodaw with Scotiabank. Please go ahead.

O
Orest Wowkodaw
Scotiabank

Hi. Good morning and thanks for taking my question. Obviously, we are hearing a lot out there about slowing demand, particularly in regions like Europe. Are you seeing any evidence of that from your customers? Like are any customers scaling back orders at all?

R
Richard Adkerson
Chairman and Chief Executive Officer

No. In fact in Europe, you saw some of the recent articles on premiums that are being suggested at very high levels. The inventories are low, there is the production out of Russia is a complicating issue. It’s not – it’s something that the margin – Freeport produces more copper than Russia does. But that’s a factor. But backwardation is strong. It’s just striking to see that the price of copper dropped $0.70 from a quarter a year ago and yet the day-to-day business that we have is one where customers are really fighting to get product. We had something – I don’t think it’s ever happened as Kathleen or Mark Johnson is on the call, but we actually emptied all of our concentrate barns at Grasberg. I mean, they were empty. Generally, we have operational issues with the shallow seas there getting production out. So, it’s just striking how negative the financial markets are about this industry and yet the fiscal market is so tight. It’s something that we haven’t seen. Now the reality is, and Kathleen mentioned that, is this historical correlation between our input costs and copper prices is disrupted right now. I think it will come back into a more traditional relationship in the future, but it’s not now. But – we just don’t see any – we certainly have no problem selling copper. In fact, we have problems meeting demand for – sometimes it’s the rod market in the U.S. is disrupted. And so there is a shortage of copper rod in the U.S., but it’s a real striking correlation right now.

O
Orest Wowkodaw
Scotiabank

That’s great to hear. Thank you, Richard.

R
Richard Adkerson
Chairman and Chief Executive Officer

Yes. I just – I don’t have any basis for predicting what’s going to happen in the near-term. But if this market turns, it’s going to turn, it’s going to turn with a vengeance. I am not predicting that, I am just saying if.

Operator

Your next question will come from the line of Carlos De Alba with Morgan Stanley. Please go ahead.

C
Carlos De Alba
Morgan Stanley

Yes. Good morning. Hi Rich. Hi Kathleen. Thank you for taking my question. I would like to, if you could possibly discuss – thanks Rick. What is the outlook for cash taxes in the quarter? It seems that, that was still an important drag of cash. You gave the guidance for the fourth quarter for the income tax rate, but any comments on the cash front would be really useful. And – yes.

R
Richard Adkerson
Chairman and Chief Executive Officer

Well, let’s just go ahead and answer that. We have the issue. Taxes we pay are based on our foreign operations, and particularly like in Indonesia, taxes we pay in any given year is based on the taxes we paid in the preceding year. So, when you have a situation like we have had this year where the preceding year was a lot stronger financially, we are paying higher cash taxes this year. Next year, it could well reverse. But our tax situation is stabilized. We are watching carefully what’s going on in Chile, but that’s more of an impact on our future development plans. But we have stabilized taxes in Indonesia and no question about the continuation of that. And just in doing financial analysis, you got to take into account this timing difference when taxes are incurred and when they are actually paid. And if you want details on that, call David Joint, and he can help you walk through those.

C
Carlos De Alba
Morgan Stanley

Perfect. Thanks. And if I may squeeze just one more. In terms of the negotiations that you have started with the Indonesian Government to potentially extend the current agreement beyond 2041, I still – I presume we are still early on. But any color that you can provide there, how those are going? And when would be the earliest that you could get a resolution on that?

R
Richard Adkerson
Chairman and Chief Executive Officer

So, we have had early discussions. And my sense is there is a recognition that it’s in all parties mutual interest to find a resolution for this. It would make no sense for any stakeholder for us to run this operation with a drop dead date of 2041. There is resources already identified beyond that. And for a number of years, because of all the protracted discussions we had about our contract of work in [indiscernible]. We really haven’t done delineation drilling to really understand what happens to these ore bodies at depth. And so the discussions are early on. There are some complications that we and the government will have to deal with, with the existing regulations and so forth. So, it’s not something we can say that there is anything other than early conversations. But I have been pleased with the tone of those conversations. And now we are starting the hard work of saying, how do you get this done in a mutually acceptable way.

K
Kathleen Quirk
President

Carl, I think one of the things that’s a real positive, and we talked about the 2018 agreement earlier, but the fact now that the government through MIND ID owns 51% of PT-FI has increased the knowledge of this ore body and the recognition that it takes a very long time to identify and develop new sources of production. And so there is better recognition that we need to know sooner – earlier than 5 years before the expiration to be able to maximize the values. And so I think that’s a real positive that recognition that the long-term nature of this business and how it will benefit from having additional exploration, development over the next 10 years instead of wait until the end until it’s too late. So, that’s a real positive of the 2018 agreement and alignment that we have with the government.

C
Carlos De Alba
Morgan Stanley

Alright. Great. Thank you very much Kathleen and Richard.

R
Richard Adkerson
Chairman and Chief Executive Officer

Yes. That’s a good point.

Operator

Our next question will come from the line of Michael Dudas with Vertical Research Partners. Please go ahead.

M
Michael Dudas
Vertical Research Partners

Hi Kathleen and Richard.

K
Kathleen Quirk
President

Hi Michael.

M
Michael Dudas
Vertical Research Partners

Yes. Good morning. So, looking back towards, say, maybe pre-pandemic levels, and if you are analyzing you are doing a feasibility say, like you are doing for Bagdad or any other type of project, what do you estimate the increase in absolute dollar capital cost would be for a certain run in the mill or whatever type of project you have? And what do you think those operating costs would fall through higher? And the other aspect is, as you analyze risk rate adjusted return or return expectations, have you changed them given where interest rate levels are and some of the political aspects most – whether it’s U.S. or in South America?

R
Richard Adkerson
Chairman and Chief Executive Officer

Michael, these projects are so different. You can’t set them in, and I know a lot of people who follow the industry at a high level are always trying to come up with some things like incentive prices and other things that fit. But every one of these projects are just so different. And there are different factors. We will factor in the – as we conduct this feasibility study at Bagdad and begin – and the continued discussions with our Board, we will factor in whatever the current price outlook is for capital and operating costs, even though we don’t focus in on a particular copper price, but what does scenario copper prices look like and how does it fit into our overall portfolio. One thing that’s come out of this – Kathleen made references to it a couple of times. But one thing that’s come out of the pandemic is labor issues. And that’s – as I talk with people, the business roundtable, business counsel, it cuts across industries, but it certainly affects our industry. And Bagdad is a very remote location. And we have got to make some investments to attract people to come in and develop a sustainable labor force there. But it’s true in our other operations, not so much overseas. But in the U.S., it’s a real issue, and that’s a factor to consider in terms of committing capital. And we have got a whole long future of potential capital projects in the U.S. And there are a lot of, in our view, advantages for Freeport in having that. There is – I mentioned the royalty situation, the great community support we have, the support from the travel groups in the long history that we have worked, invested so hard to have those positive relationships. And so we just have to pull them in. I guess my point is it’s not something you can really generalize about, but you have to dig into each of these projects and thoroughly understand how costs, other factors figure into it. So, we got Bagdad. We have got this Lone Star project, it lies ahead in our future. That’s great. El Abra is going to be a great project eventually. So, I wish I could give you some simplified answers for that. But…

K
Kathleen Quirk
President

But there is clearly a mismatch, Michael, between current cost of a capital project and where the current copper price is. And that’s what’s guiding some of our thinking around timing of Bagdad is it’s not something we have to do now. Let’s wait to see how some of this unfolds and not try to force a project in the kind of environment we are in, where the availability of people and equipment is tight. So, this is really a project of bringing copper forward. If we don’t produce it now, we will produce it later. But we wanted the capital part of this project is important because you don’t want to be building a project in an inflationary environment when you wait to use it, it could be a different story. We can’t – as Richard was saying, we can’t predict exact timing, but we know we can be more efficient about doing a project in a different environment than where we sit today in the U.S.

M
Michael Dudas
Vertical Research Partners

You just certainly highlighted the fact that the hurdle for the industry is much higher and certainly it’s going to exacerbate whatever supply/demand gap you anticipate going forward because of what you just enumerated. So, I appreciate those thoughts. Thank you.

R
Richard Adkerson
Chairman and Chief Executive Officer

Well, that is a real point. I mean this industry faced supply challenges before this current inflationary environment we have, those had to do – when I look back on the almost 20 years now I have been CEO, you have geology factors where today’s opportunities for supply expansion just are much less attractive than they were 20 years ago. And then you got the geopolitical factors that crop up in different places around the world. And the fact that so many new deposits are underground, etcetera, etcetera, but now this current situation we are going through right now with the uncertainties about the relationship between input costs and prices, about the availability of material, supply and supply chain issues, about labor issues, particularly in the U.S., all those things are just adding to the supply barriers for the industry. And yet, we have this new era of demand that’s coming to play. And absent some just global calamity on whatever basis it is. I am just so increasingly confident about what the outlook for the commodity is going to be and just how strongly our company is positioned to benefit from that outlook. And that’s what we want to preserve. That’s why we are going to be conservative about spending capital, about financial policy, because if anything this company has seen the damage that can be occurred if you don’t approach it in a commodity environment like we have or an industry like we have on a conservative solid way. And so that’s what you hear over and over as we talk about how we are dealing with the current environment and positioning ourselves for a positive future.

M
Michael Dudas
Vertical Research Partners

Thank you, Richard. Thank you, Kathleen.

Operator

Our next question will come from the line of Martin Malloy with Johnson Rice. Please go ahead.

M
Martin Malloy
Johnson Rice

Good morning. Thank you for taking my question. Assuming that the current copper pricing environment and financing environment continues here, from an industry standpoint, when do you think it will start to impact in terms of the deferment of projects, etcetera, the industry supply?

R
Richard Adkerson
Chairman and Chief Executive Officer

Well, the current environment is adding to it. But clearly, the uncertainties that emerged over this past year plus time in Latin America, 40% of the world’s copper comes from Chile and Peru. And with what went on in their most recent presidential elections, the uncertainties that came out from that and things continue to change in Peru, the government has been in turmoil. I mean the number of ministers that have gone through this administration is just striking. And then Chile had the situation where there was a negative vote on the proposed constitutional amendment, which changed the targets there. And you can see what’s happening to Greenfield projects being delayed in the United States, even though there seems to be lip service saying that the world needs copper, but that’s not changing so much for Greenfield projects here in Africa, South Africa [ph]. So, I mean it’s just a world of where all of this is happening. We do have an industry where there is two or three projects that have been in the works for many years now, they are going to come on stream shortly. But when you get past those, you just see everything is dried up and you don’t see companies talking about having – you will hear more about like you are hearing from Freeport. We are being conservative about Bagdad. We will be conservative about Sierrita, about El Abra, conservative about our opportunities in Lone Star. And the surpluses that were predicted 2 years or 3 years ago are being downgraded as companies downgrade their current production estimates. So, it’s going to happen quickly in the next 3 years and could be shorter.

M
Martin Malloy
Johnson Rice

Thank you.

Operator

Your next question will come from the line of…

R
Richard Adkerson
Chairman and Chief Executive Officer

I just see some real similarities to what we have seen in the crude oil business for years of underinvestment, and then all of a sudden, something happens and now the world had a crisis for – in the oil industry.

Operator

Our final question will come from the line of Brian MacArthur with Raymond James. Please go ahead.

B
Brian MacArthur
Raymond James

Hi. Good morning.

R
Richard Adkerson
Chairman and Chief Executive Officer

Good morning Brian.

B
Brian MacArthur
Raymond James

Good morning. Most of my question has been answered. But can I just ask, El Abra had a very good quarter, 60 million pounds, that’s probably the best in like years. Is that sustainable now, or was something different happening this quarter there?

K
Kathleen Quirk
President

No. I mean we have been flagging that we cut El Abra’s stacking rate during 2020 and have been ramping back up to get an increase. And so we have been flagging the – and we are moving to a new leach pad there. So, that’s in line with what we have been guiding to.

B
Brian MacArthur
Raymond James

So, we are back. We are now on that new steady run rate of 240 million pounds, 250 million pounds a year?

K
Kathleen Quirk
President

Right.

R
Richard Adkerson
Chairman and Chief Executive Officer

Yes. You touched on an important point. And we certainly saw this with crisis steps we took years ago in 2016, and this sort of ties into the question about what are you going to do with some of these lower-grade deposits if you make decisions about mine rates, they have long-term consequences. It takes a while if you cut back stacking rates on some of these mines and that’s not a production impact just for this year, but extends for years in the future. So, as we take steps to build it back up, then that’s going to be incremental over a period of time. And so I just keep harping the people who try – talking about our business, it’s a long, long-term business. And that just comes to play in almost everything we do.

B
Brian MacArthur
Raymond James

Great. Thank you. Now I know it was coming back up. It just was just sort of a pretty big jump all of a sudden. So, I just was curious whether everything has been done there to go to that new rate. So, thank you very much.

K
Kathleen Quirk
President

Yes.

R
Richard Adkerson
Chairman and Chief Executive Officer

Okay. Thanks Brian. Thanks everybody. We really appreciate you being on the call and encourage you to follow-up if you have further questions. And we look forward to reporting on our company and our industry in the future. So, thanks for joining us.

Operator

Ladies and gentlemen, that concludes our call for today. Thank you for your participation. You may now disconnect.