KEC International Ltd
NSE:KEC

Watchlist Manager
KEC International Ltd Logo
KEC International Ltd
NSE:KEC
Watchlist
Price: 1 004.85 INR 4.06% Market Closed
Market Cap: 267.5B INR
Have any thoughts about
KEC International Ltd?
Write Note

Earnings Call Transcript

Earnings Call Transcript
2024-Q4

from 0
Operator

Ladies and gentlemen, good day and welcome to the KEC International Limited's Q4 FY '24 Results Conference Call.

We have with us today from the management Mr. Vimal Kejriwal, Managing Director and CEO; and Mr. Rajeev Agarwal, CFO.

[Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Vimal Kejriwal, Managing Director and CEO, for his opening remarks. Thank you.

And over to you, Mr. Kejriwal.

V
Vimal Kejriwal
executive

Thanks, Michelle. Thank you. Good morning, everyone, and welcome to the Q4 Earnings Call of KEC.

Let me begin with an overview of our overall performance and then go into the specifics of each business segment and our key strategic initiatives. We have delivered a good performance for the year by achieving all-time-high revenues, substantial improvement in profitability, key order wins and significant improvement in working capital and debt levels. Additionally, we have successfully executed various strategic initiatives and developed niche capabilities across our businesses, positioning us for sustained growth.

In Q4, we delivered the highest-ever quarterly revenues of INR 6,165 crores, a strong growth of 23% sequentially and 12% year-on-year. Our T&D business, especially India; and Civil business have delivered commendable performances during the quarter. Our margins continue to show an upward trajectory with an improvement quarter-on-quarter over the last 6 quarters. We have achieved an impressive growth of 37% year-on-year in EBITDA, with EBITDA margins for the quarter improving by 120 basis points, vis-Ă -vis Q4 FY '23, to 6.3%.

The bottom line has seen a remarkable growth with both PBT and PAT more than doubling over the previous year. Our PBT margin witnessed a significant increase of 150 basis points compared to Q4 FY '23, reaching 3.1%, while the PAT margin expanded by 120 basis points, standing at 2.5%.

In terms of order intake, we have secured orders of INR 6,500 crores, approximately, in Q4 across businesses, largely contributed by India T&D and Civil.

Through concerted efforts, we have made significant improvements in our working capital and balance sheet. Net debt, including acceptances, has decreased to around INR 5,090 crores as of March 31, 2024, largely in line with March '23 levels despite a revenue increase of more than INR 2,500 crores that's 15% Y-on-Y. If we compare it to the peak level of September '23, the borrowings have been reduced by [ 150 crores ]. The debt levels could have been much below 5,000 crores, but [ the spillover of ] collections of over 250 crores to the first week of April, including a substantial collection of INR 110 crores from Afghanistan.

We have also achieved a reduction in net working capital by 21 days, now standing at 112 days as of March 31, 2024, compared to a peak level of 133 days as on 30th September 2023. We expect continued improvements in working capital driven by better collections; commercial closure of projects; and a shift in the order book composition and quality with a growing share of India T&D, Civil and product businesses.

The positive trajectory of improvement in borrowings is also reflected in the reduction of interest cost for the quarter to 2.5% of the revenue, a reduction of 150 basis points vis-Ă -vis peak level of Q2 FY '24; and a reduction of 40 basis points vis-Ă -vis last year, Q4 FY '23.

Coming to the annual performance. We have clocked a robust revenue growth of 15% with the highest-ever revenues of INR 19,914 for the full year. The growth is backed by healthy execution in T&D, both in India and international; and Civil businesses. In terms of EBITDA, we have delivered a substantial growth of 46% Y-on-Y, with EBITDA margins expanding by 130 basis points to 6.1% vis-Ă -vis 4.8% last year.

Our PBT is increased by 2.6x. [ And PAT is evolved ] to INR 347 crores against INR 176 crores of FY '23. The revenues and margins could have been higher -- but further continued supply chain bottlenecks, especially in DI pipes for our water projects and high-voltage transformer/GIS and aluminum conductors for T&D projects. Additionally, the margins were impacted due to continued challenges faced in the execution of some of our railway EPC projects.

On the order intake front, we have generally been very selective, considering the working capital and margin profile of our various businesses. Notwithstanding the same, we have secured orders of INR 18,102 crores. The largest contributor has been the India T&D business, followed by international T&D and Civil businesses. Notably, 20% -- 21% of these orders are for supply of products such as towers, cables, hardware and poles. We have a well-diversified and strong order book of INR 30,000 crores as on date. Additionally, we have a large L1 position of over INR 7,000 crores, primarily in T&D business. With this, our order book-plus-L1 position stands at INR 37,000 crores, which gives us a visibility for the next 6 to 8 quarters. We are happy that the order intake trend is continuing in FY '25 with new orders of [ INR 1,036 crores ] announced last week.

Considering the substantial improvement in performance, strong order book and ongoing confidence in strategy, the Board of Directors have decided to recommend a dividend of 200%. That is INR 4 per equity share on the face value of INR 2 each.

Now let me talk about specific businesses.

Our T&D business has delivered a stellar performance by achieving a milestone revenue of INR 10,456 crores for the year, a remarkable growth of 21% vis-Ă -vis last year. The growth has been delivered on the back of robust execution across both domestic and international markets. The business has significantly expanded its order book with strong order inflows of 11,000 crores across India, Middle East, Americas, South Africa and CIS.

In India T&D, the business witnessed good traction; and secured orders of approximate INR 6,000 crores, a robust growth of 14% vis-Ă -vis last year. Additionally, we are presently [indiscernible] a large number of tenders in India. The business has significantly bolstered its order book with multiple orders for transmission lines and substations from PGCIL, state utilities, private developers and tower producers. In India, the power sector is poised for promising growth with transmission infrastructure planned for major renewable energy potential zones such as Rajasthan, Gujarat, Andhra Pradesh and Tamil Nadu to support the target of achieving 500 gigawatt of nonfossil fuel power by 2030. We have already secured some of these orders during the year and have a substantial order book and L1 of over INR 9,000 crores as on date in India. The consistent flow of orders and focus of the government on renewables and the related T&D infra build reaffirm our confidence in the sustained strong growth of our India T&D business.

In international T&D, we continue to expand our presence with multiple order wins across markets. The business has secured significant orders in Middle East, especially in Saudi Arabia and UAE, through its [ new ] subsidiary KEC EPC LLC. We are progressing well on our debottlenecking program to increase the tower manufacturing capacity at our Dubai facility by 20%. This strategic enhancement will enable us to meet the growing demand in the region and further solidify our leadership position in the Middle East transmission market.

We continue to witness good traction in stand-alone tower supply orders. During the year, we have secured significant orders of over INR 2,000 crores across key markets such as Middle East, North America, South America, Europe and Australia. These orders include our largest tower supply order from the United States of America and the maiden tower supply order from Europe. The uptick in tower supply orders, particularly from North America, reflects the rising demand for our products in the region.

In SAE, we have delivered a turnaround performance for the year with revenues of INR 1,447 crores, growth of 9%; and a positive PBT. I am pleased to share that SAE has delivered positive PBT across all the 4 quarters. In Brazil, we witnessed the largest-ever auction, exceeding USD 3 billion, in March '24. We are in active discussions with developers who have secured these projects in the auction and are well positioned for securing orders both for supply of towers and for hardware.

During the year, the business also achieved a breakthrough in the U.S. market with the successful supply of hardware products, thus opening up new avenues for expansion [ and growth ]. The business has a steady inflow of orders and a robust order book and L1 position of approximately 3,000 crores comprising of orders for supply of towers, hardware and poles; and engineering and testing of towers from the Americas. In Afghanistan, the progress on collection continues, as we have realized an amount of INR 110 crores in the first week of April '24. This brings the total collections, post regime change, to a significant INR 420 crores. We continue to be in active discussion with the multilateral funding agencies for collection of the remaining receivables and are confident of realizing the balance in the coming quarters.

The overall tender pipeline in T&D continues to remain strong in both domestic and international markets given the push for renewables; and requirements for large transmission lines, substations and underground cabling. With a record order book and L1 in T&D of over INR 21,000 crores, we are confident of delivering significant growth in this business.

Our Civil business has delivered an impressive performance for the year with a robust growth of 32% year-on-year with revenues of INR 4,370 crores. The growth has been delivered on the back of strong execution across all segments. In Q4, honorable prime minister inaugurated the Kochi Metro Phase 1b, which includes a wire [ duct and a station ] built by KEC. Incidentally, the ballastless track works for Kochi Metro was also executed by our [ railway SBO ].

The business has bolstered its order book with order inflows of over INR 4,200 crores. During the year, the business has secured multiple orders spanning diverse sectors, including FMCG, metals and mining, cement, residential and commercial buildings and data center segments. The business has also expanded its customer base with the addition of multiple prestigious clients. With a pan-India order book of over INR 5,000 crores in industrial and building segment, we have established ourselves as a preferred agency in the construction of essential buildings and factories. The business outlook remains healthy across segments with a robust and diversified order book and L1 of over INR 10,000 crores. We are confident that Civil will continue to be a major growth driver for us.

Our railway business has achieved a revenue of INR 3,115 for the year, de-growing by 17%. The business is progressing well on the completion of existing projects. We have successfully commissioned our maiden tunnel ventilation project in Jammu and Kashmir, our execution on track on the prestigious TCAS train collision avoidance projects [ under Kavach ]. During the quarter, we have enabled Kavach system on 17 route kilometers; and another 100 route kilometers is planned during the month.

The margins of this business continue to be impacted adversely due to the delay in execution on account of various factors such as [indiscernible] blocks, design issues et cetera. As conveyed earlier, we are being very selective in order intake of railway business considering the increased competition, customer and margin profile and working capital. Consequently, the order intake and L1 for the business remains subdued at INR 1,500 crores. This will result in a further degrowth in revenues in the current year.

In a significant development, we have commenced execution of a first international order secured during the year. We have witnessed significant infrastructure spending of the government towards increasing freight carrying capacity, rolling stocks and Vande Bharat trains. Going forward, we anticipate increased allocation towards conventional infrastructure development within the railways, encompassing the construction and building of tracks, overhead electrification and advancements in signaling and telecommunication to facilitate the seamless [ integrate ] operation of high-speed trains like Vande Bharat. Our focus will be on fast-tracking project closures, optimizing working capital and pursuing select opportunities in India as well as in the international market.

In Oil & Gas Pipelines, the business has delivered revenues of INR 626 crores, a good growth of 30% vis-Ă -vis last year. In a noteworthy achievement, the business has forayed into the international market by bagging its maiden order in Africa. We are also exploring opportunities in the growing storage tanks market. The business has also [ strengthened ] our composite station works portfolio by securing one more order in this segment. The business continues to focus on enhancing prequalifications to expand the size of addressable market.

In the Solar business, we are currently executing our largest 600-megawatt solar project in Karnataka. Additionally, we have also secured an order for setting up solar projects from a leading auto ancillary company in India. We continue to bid selectively for opportunities in line with the sustained commitment of the government to promote renewable energy. We firmly believe that the renewable EPC business will become a significant contributor to our future growth.

Our Cables business continues to deliver good performance with the highest-ever revenues, order intake and profitability during the year. The business achieved revenues of INR 1,645 crores with substantial improvement in profitability. We are progressing well on setting up the fully integrated manufacturing line for aluminum conductors announced last quarter. The business has already secured orders for supply of power transmission conductors ACSR and AL-59 from government utilities and private sector TBCB developers. This strategic move will contribute significantly to the revenues and margins of the cable business. Additionally, it will also enable a timely execution of our own T&D projects. We are confident that this business will continue to grow in terms of revenue and profitability.

Over the past couple of years, we have undertaken a transformational journey to create a world-class engineering organization to enhance our engineering prowess across business segments and gain competitive advantage in the industry. We have reengineered and automated end-to-end design processes to reduce engineering cycle time, leading to significant improvements in both efficiency and design quality. Furthermore, we have deployed leading-edge digital technologies such as AI, advanced analytics, NLP for engineering design optimization and improving the quality of our submittals to the clients. This program has helped us to improve our engineering [ net wins ], enhance profitability across various businesses and position as the preferred partner for infrastructure projects.

In ESG and sustainability, we continue to take significant strides across the organization. Some of our key initiatives and development during the year include installation of solar rooftop at our Brazil plant -- and in the course of expanding capacity of our solar rooftop at Nagpur, in addition to the existing solar rooftop plants at Jaipur and Dubai. With this, 25% of our total power requirement in the plants will be catered through solar energy. We also have long-term agreements with external service providers who provide energy from renewable sources at our Vadodara and Mysore cables manufacturing plants.

Our people-centric agenda focuses on fostering happiness, as reflected in our brand tagline Hello Happiness, an integral part of the RPG Group's philosophy. The success of this agenda is reflected in the increase in our happiness quotient to 83% this year vis-Ă -vis 81% last year, owing to our unwavering commitment to employee-centric initiatives encompassing growth, culture, recognition and work-life balance.

In the past 2 quarters, our Board of Directors has undergone notable changes. 3 directors have joined our Board, while 2 members have moved on, adding to diversity, knowledge and expertise of the Board. We now have a further diversified independent Board of 11 members comprising of ex-bureaucrats, investment bankers, finance and sustainability professionals. I'm glad to share that our progress on this front has been well appreciated, which is reflected in the continuous improvement of our ESG ratings by S&P Global DJCI and Morningstar Sustainalytics in the last 2 years. In a proud moment, we have been ranked first in our industry by both these agencies and also made ourselves as a part of the top quartile of our industry globally.

In conclusion. I would like to emphasize that the outlook remains healthy across most of our businesses with a formidable and diversified order book, plus L1, of INR 37,000 crores. Combined with a substantial tender pipeline [ exceeding INR 1 lakh 35,000 crores ], we are well positioned to deliver sustained growth in the forthcoming quarters. We will continue to focus on profitable growth, fortifying our balance sheet and investing and building capabilities across our businesses to lay a strong foundation for the future.

Thank you all. We are open for questions now.

Operator

[Operator Instructions] The first question is from the line of Renu Baid from IIFL Securities. As the participant has left the queue, we will move on to the next question, which is from the line of Mohit Kumar from ICICI Securities.

M
Mohit Kumar
analyst

Congratulations on a decent set of numbers. Sir, first question is, sir, how do you think about the opportunity in India T&D, specifically in FY '25. If I have correctly, I think you mentioned the -- we received the order of 64 billion, with a 40% growth Y-o-Y. In that context, is it right to believe that the FY '25 could have very, very large number? And also, can you just comment on the competitive intensity?

V
Vimal Kejriwal
executive

Both question was not very clear too, but I think you're talking about India T&D...

M
Mohit Kumar
analyst

Yes. I'm talking about India T&D opportunities. And the -- and last year, I think we did a number of 64 billion. Can you see a material high number in FY '25 given that there is a lot of large bidding that happened in FY '24?

V
Vimal Kejriwal
executive

I think clearly we are seeing a large tender pipeline happening. We have seen new renewable, I'll say, packages being announced by the government. On the Rajasthan part, I think it's slowly coming to an end, but I think it's moving on to others. We recently had one more big opportunity announced in, what was that, Jamnagar side, where all the large renewable projects are coming up. Also the HVDC has gone into tendering, so we are also seeing, I think, next week or maybe a week, 2 weeks after, the first HVDC tender -- line will get tendered out. The second one is also -- and so I think, India T&D, we grew almost 40%, 45% last year. We are again planning another 40%, 45% growth this year. As of today, if you ask me, we have a 25,000 crore tendering opportunity right now [ live ]. We clearly -- and we are having discussions with all the players, including POWERGRID, on this; and I can see them that they are very bullish. In fact, I think they are probably going to revise their CapEx plan, so if you ask me, I think we have never seen such good days in India T&D; and the way the government continues to focus, and I do hope that they will continue after the elections, on the renewable part.

Other piece is if you look at the huge program which has been announced for setting up of coal-based plant -- thermal plants. I think -- and those plants will obviously come at pitheads et cetera, so again the lines for this will also be required. So that will be a second part of the growth story of India. So I think very clearly we are right now very positive on the India growth story, which is completely opposite to what we were talking about a year back. It's a huge turnaround.

M
Mohit Kumar
analyst

Sir, is it right to expect a double-digit margin in...

Operator

Mr. Kumar, I'm sorry to interrupt, sir. I will request you to keep your mic a little bit far from your mouth [ and speak ].

M
Mohit Kumar
analyst

Is it better now?

Operator

Yes, sir.

V
Vimal Kejriwal
executive

Slightly better.

M
Mohit Kumar
analyst

Yes, sir. My second question is, given that -- the large opportunity and, I think, given that there are limited players available to execute these projects, is it right to think that the margins on the Indian T&D space, especially on the standalone, will move to double digit?

V
Vimal Kejriwal
executive

We expect that to happen.

M
Mohit Kumar
analyst

And as of -- is it likely in FY '25 or FY '26, in your opinion?

V
Vimal Kejriwal
executive

FY '25.

Operator

The next question is from the line of Renu Baid from IIFL Securities.

R
Renu Baid
analyst

So my first question is on the core T&D business. If you see, now for the last 2 to 3 quarters, our order backlog has been in INR 14,000 crore to INR 15,000 crore range. And typically -- given that the order book to bill would be about 15, 18 months, what in your view could be the T&D revenue growth in fiscal '25? So you think we can continue to clock 15%, 20% revenue growth -- and it may take a bit of [ continued new order flows ] come in the backlog.

V
Vimal Kejriwal
executive

I think we are very clearly targeting around -- I'll say slightly -- at least 30%, if not slightly more, in the T&D piece, largely driven by India. Because international has grown very well in the last 2 years. India had a very low performance in FY '23 [indiscernible] [ '24 ], '25 again. So I think we'll grow by around 30%, 40% in India. So overall, if you add India, international and SAE, I think we should have around a 20%-plus growth in T&D as a whole.

R
Renu Baid
analyst

Sure. And simultaneously, while SAE has now turned around and if we look at the core margins, profitability for this year were definitely impacted because of [ low ] projects, [ old ] projects. So this year, for fiscal '24, the last year, what was the approximate margin profile of the T&D, say, ex of SAE? And you have indicated in the previous Q&A that you're targeting double-digit margins in T&D. Do you think that is feasible for '25? Or there could be risk -- or what could be risks or challenges to double-digit margins in T&D in fiscal '25?

V
Vimal Kejriwal
executive

So Renu, as far as risk is concerned, we are largely, I'll say, almost hedged on all our base metal exposures, which would include aluminum, copper as well as zinc. Steel is something where there's no significant hedging mechanism available, so that -- to me that's one exposure which we will continue to have, although we are -- not seeing any major movement in steel happening last 2 quarters and so. And I think our supply chain team is also confident that they don't see a major movement happening in this. The risk too -- the second risk is going to be slowdown in execution, which I think we have built up enough teams and all that, so I don't think -- so [ personally ], I am not seeing any major risk on the T&D side in delivering our projected revenues and, [ I'll even tip ], on the margins also.

R
Renu Baid
analyst

Okay. And approximately, what was the profitability of T&D portfolio in fiscal '24?

V
Vimal Kejriwal
executive

We don't give out our numbers like that, but I can tell you that it was -- non-T&D was more -- slightly lower than the T&D.

R
Renu Baid
analyst

Okay, okay. Second question is [ rail orders is -- also is ] now just a onetime book-to-bill. And given that order finalization pace is slightly softer in the rail electrification [ and EPC ] space, what kind of consolidation are we heading for if we see '25, '26 in this business? And in your view, can this be materially offset by build-up on export exposure? Or it may be still some time away till we build up the export order book here.

V
Vimal Kejriwal
executive

So I don't think it will get set up by export immediately. Right now we just have one single order [ which is on execution ]. And we have bid for a few of them. Now by the time those orders come -- and hopefully, we'll get at least 1 or 2 of them. I don't see revenues coming in earlier than Q4 or something, so clearly, FY '25, we will have a further de-growth of 15% to 20% in our railway numbers, okay? Now coming back to how this business will grow or what will happen on this, I think we'll have to wait and watch once the new government is formed. What is the focus area of them in the railway piece of it, okay? Because, pre election, we did see a huge amount of spend which was on running new trains, station development et cetera, which were, if I want to use the word, more [ populist ] than on the infrastructure, but the view in everyone and whoever we talk to in railways and all that is that ultimately we will need to build infrastructure for all these new trains.

So we are hoping that and I think we are reasonably confident that the infra -- the spending pattern of railways will change and will move towards more infra, which is where we are. So I do hope that we will start seeing new tenders and orders coming in maybe in Q3 or something and then revenues FY '26. So if you ask me, we should see a turnaround happening in the revenues and, hopefully, the margins also from FY '26.

R
Renu Baid
analyst

Got it. And lastly, you did elaborate briefly about the foray into conductors portfolio, so what is the kind of CapEx outlay that you have planned for this business to build capabilities and capacity? And what could be the targeted asset turn from this portfolio, even if it is for internal consumption initially over the next 3 to 4 years?

V
Vimal Kejriwal
executive

So Renu, the target -- and the CapEx, right now, we have target around 60 crores or so because [ it will come up ] in our existing Vadodara factory. And -- but the turnover, I think, at the -- if you look at current prices which are slightly elevated in terms of AL-59 and all that, should be around 10x, so we should be -- in a full year basis, we should be able to achieve a turnaround of around 600 crores from this CapEx of 60 crores.

R
Renu Baid
analyst

Okay. And this 60 crores is sufficient enough to build all the [ deals range ] as well as the ACSR range that we are expecting.

V
Vimal Kejriwal
executive

This is a complete line by itself.

R
Renu Baid
analyst

Got it, got it. And lastly, if I can just ask one more, if you look at the government commentary in the last few months as a part of the 100-day program. It's speculated that there'll be significant thrust on project -- new project approvals in T&D and power sector. And that, in your view, how incremental can it add to the domestic growth outlook that you have shared with us, so far?

V
Vimal Kejriwal
executive

That's a difficult question because -- I'll tell you. Why is that, even without incremental output and all that, right now there are so many [ other ] going on in the market, okay? As I said, we are looking at almost 40% increase in our India turnover this year, on top of the [ 40, 50 ] we already had. So I don't think it will impact too much because, at the end of the day, I think we are also seeing a significant stretch on the supply chain. So I don't see that whether we'll be able to go beyond 40%, 50% of the current revenues for India unless and until we have matching spend happening on other item. Like we are also looking at should we expand some of our India factories also. We have not yet taken a call. Maybe -- if this thing happens, maybe we'll take a call on that. Because right now our factories, all of them, India as well as Dubai, are full.

Operator

The next question is from the line of Bhoomika Nair from DAM Capital.

B
Bhoomika Nair
analyst

Sir, just wanted to discuss the margin profile. The improvement, what we were looking at, has been -- the recovery in margins has been much slower. And I think that's got to do with the Railways segment. Now if you can just [ throw upon ] what has been the railway margins like. I mean we're looking at a decline in the revenues for FY '25. How will the margin profile for the railway business kind of pan out, which will start reflecting then the [ healthier ] margins of T&D?

V
Vimal Kejriwal
executive

So Bhoomika, the margins are not as per your expectation or our expectations also. We were expecting a slightly higher margin in Q4, but there are basically 2 reasons why the margins are, I'll say, 20, 30 basis or 40 basis points below the expectation. And one reason is that we had a deferment of revenue, which is unfortunate, on account of some of our supply chain issues which are common to the industry. People admit it, or they won't admit it, but there are issues which we are facing on -- especially on the conductor and transformers et cetera; and a little bit on the Red Sea, where some of our shipments from Europe got delayed. So we would have lost around 400 crores, 500 crores of good revenue, so if you'll take a 10% margin on that, roughly around 40 crores, 50 crores of margins, which would have added around 20, 25 basis points to our profits, has not happened. So that's 1 reason.

And the second reason is that, as you rightly said, Railways has been an issue. We have been trying to see how do we recover all the variations and prolongation et cetera, which we had hoped that at least some part of it would come in, in Q4. Unfortunately, there have been some management changes in some of the PSUs et cetera. And somehow, I think those decisions got delayed, so whatever we were expecting has not come into account. And because of that, we have actually booked some extra provisions in the -- in Q4. That's the basic reason why the numbers are, I'll say, 30, 40 basis points below what we would have wanted to have for Q4 also and what we have been talking earlier.

B
Bhoomika Nair
analyst

Okay. So sir, I mean, while we are guiding for a 7.5% margin for the full year of FY '25, when do we start seeing margins at around 8% to 9% kind of a range, which will be closer to the T&D margins per se?

V
Vimal Kejriwal
executive

So Bhoomika, we still maintain that we'll have 7.5%-plus. We were talking about 7.5% to 8%, but okay, let's stick to 7.5% for the year. We have also said that, exit at FY '25, we should be close to [ double digit ], anywhere between 9% to 10%. Quarterly, maybe Q1, Q2, we're still ramping up, so it may be at a slightly lower level in terms of [ my guide into our numbers ] for that, but Q3 and Q4, you will definitely start seeing margins of that size so that we can deliver an average margin of 7.5% for the year.

B
Bhoomika Nair
analyst

Sure. Sir, the second question is on the T&D aspect of ordering and competitive intensity, as you mentioned that the demand and the ordering activity is picking up quite a bit. Simultaneously, if you can comment about the competitive intensity. A lot of new players have kind of come back. [ Duty structures which were not there or there ] is also building now, so how is the competitive intensity in T&D for these new orders? How was it, say versus 1 year back and now, the number of players bidding for orders et cetera? If you can just talk about that aspect.

V
Vimal Kejriwal
executive

So [ to me ], Bhoomika, what has changed in the T&D sector is the size of the orders. Typically what we are seeing now, from POWERGRID especially, most of the orders are 500 crore-plus, okay? And if you look at the competitive intensity in that segment, I'll say it has probably come down a little bit, not gone up, in that segment, okay? The other players whom we're talking about are still not there in POWERGRID. And they have been more with private players and smaller jobs et cetera, so if you ask me, an honest answer will be, for the larger projects, the competitive intensity has not gone up. In fact, I will say it has come down slightly.

B
Bhoomika Nair
analyst

Okay, okay. And in terms of tendering opportunities, sir, you said 25,000 crores is what is the tendering opportunity which is ongoing right now. [ And the year as a whole ], what do you think can be possibly the kind of orders that have been talked about? And what is in the pipeline which can possibly come through for the year, in terms of tendering opportunity?

V
Vimal Kejriwal
executive

Typically we have seen around [ 50,000 crores, 55,000 crores ] of opportunities coming in, but this year, I think we'll do much more than that. By the way the things are happening, I think we will probably end up at 60,000 crores, 70,000 crores of numbers.

B
Bhoomika Nair
analyst

Okay. And that will be then bolstered by the international business as well.

V
Vimal Kejriwal
executive

No. I'm talking about India. International would be around -- right now we have tendering opportunity of almost 40,000 crores in international today.

Operator

The next question is from the line of Parikshit Kandpal from HDFC Securities.

P
Parikshit Kandpal
analyst

Sir, congratulations on a decent turnaround this quarter.

V
Vimal Kejriwal
executive

Thanks, Parikshit.

P
Parikshit Kandpal
analyst

And sir, my first question is on this 11,000 crores of inflows which you highlighted in the T&D segment. So I just wanted to understand. Within this piece, what could be the total bought-out items, equipment, transformer or substations? So basically the third-party procurement on the equipment side. And are you seeing any inflation here? Because we have seen a 40% growth, which is substantial. And then so if you can help us understand how much could potentially be a breakup on inflation and volume in this.

V
Vimal Kejriwal
executive

So Parikshit, it will vary from order to order, but typically, as -- the construction varies between 20% to 30%, okay? On the international side, the construction costs go up to probably 40% also. India would be close to 20%. Substations could be between 10% to 15%. So it will vary, but when we take a ballpark, maybe 20% will be construction. 80% will be supplies. Of the supplies in transmission side, 30% would, again, be towers which will come out from [ own ] factory, so maybe 35%, 40% will be bought out for transmission projects. For substations, it will be closer to 80% bought out. So that's the broad numbers. They could vary slightly, but that's a broad breakup of the revenue of transmission and substation.

As far as the inflation is concerned and price increase is concerned, clearly we are seeing that, but what happens with us is that, when we bid for a tender, we generally have a back-to-back offer with vendors, whether it's for transformer or GIS or conductor or anything. Conductors, obviously, normally is on a price variable where the metal moves in -- back and forth with what happens with the LME, but as I said earlier in the call, that we have fully hedged on all of them. So as far as the [ past and ] what we have in our order book, I don't think we see any exposure. For the new ones, we quote based on the increased prices. That's why one of the questions which I answered to Bhoomika was also that we -- the size of the orders is increasing. And so partly it is because of the volumes are increasing, partly because the values are increasing. I remember we recently quoted a tender of -- with the AL-59 conductor where the conductor value was almost 40%, 45% of the entire contract value, but for us, we are very clear that we always hedge the moment we are L1.

P
Parikshit Kandpal
analyst

But our high-voltage supply chain. I mean the large [ MNC ] players. So typically what kind of contracts do we have with them? Is it like pass-through, or is it fixed price? So once you close the contract [ on them, is it a ] fixed price? So how do we hedge that exposure?

V
Vimal Kejriwal
executive

So typically the GIS would always be on a fixed price, okay? Transformers, it depends upon -- contract to contract. There are contracts where we could have a pass-through the client is giving. There could be contracts where there is no pass-through and where we take a call based on our supply chain, but that -- and typically those exposures are pretty small. And also, if you look at the TBCB and all the way it operates is that, before the final offer is submitted, [ Power ] always calls you back for a revised offer, where you can always take corrective actions on the pricing. So if you ask me, honestly, I don't think today we are looking at a large exposure on the base metals in the open market.

P
Parikshit Kandpal
analyst

Okay. And sir, second question is on the improving health of the balance sheets now. I just wanted to understand. I mean typically 4Q is very good in terms of collections, so going -- in the ensuing quarters, coming quarters, how do we see the debt shaping up from INR 5,000 crores level? And also if you can touch upon why didn't the credit rating agencies see this improvement coming in. And despite that, they went for a downgrade because now things are looking up. So what were the discussion and deliberation about going around like improvement on these matrices? Despite that, they took a downgrade. So if you can help us...

V
Vimal Kejriwal
executive

Maybe I'll ask Rajeev to answer. Then I can add something if required.

R
Rajeev Aggarwal
executive

So basically, on the debt side, we are expecting that -- some more collections to happen, for example, [indiscernible]. And there are a few other debtors which are still coming up with a project closure. So we expect that, with a 15% growth in the turnover which we are expecting for the next year, we should remain by and large with the same debt level of INR 5,000 crores. So effectively what we are saying is that our NWC base, which is -- currently stands at about 112 days, will go down below 100 days. So with that, 15% effectively debt reduction indirectly will take place, seeing that continuing. And based on that, we expect that our interest cost will go down to 2.5%, which is currently at 3.3% for the year.

As far as your question on the rating agencies' rating downgrade is concerned, I think the -- clearly the rating agency has taken a call based on a number of Q2 and Q3. And obviously a lot of debt reduction has taken place in Q4. At the end of Q3, we had a debt of close to about 6,200 crores, which has significantly reduced in quarter 4. And that -- we expect the lower quantum should continue for the rest of the year because there are a lot of leeway that is available still with us in terms of more collection happening for the year. So maybe with -- after a couple of quarters with further improvement, we will go back to the rating agencies and we will request them to look at our revised numbers and consider restoring back our rating. Currently there are other 2 rating agency which continues to be at AA-. So with the CARE and CRISIL. They continue to be at AA-. Incidentally, our short-term rating continues to be at the highest grade. So that is A1+ even [ with ICRA ].

P
Parikshit Kandpal
analyst

But Rajeev, with the increase in volume, do you think the debt levels will go up like in Q1, Q2? I mean I know, Q4, they may again come back because of strong collections, but in next 3 quarters, do you think -- what could be the peak debt levels we are factoring in the next 3 quarters?

R
Rajeev Aggarwal
executive

So normally this is like -- if you look at the seasonal phenomena where -- generally, in Q1 and Q2, the debt level goes up. And Q3 and Q4, the debt level comes down. So we had a peak debt level in Q2 and wherein the interest cost was also corresponding to that at 4%. And from 4%, we have come down to 2.5% in Q4. So this is a normal phenomenon, so probably -- my sense is that debt level will always vary between INR 5,000 crore to INR 6,000 crore. And INR 6,000 should be the peaking level given there are a lot of collections which is lined up in the next few quarters. Even INR 110 crore, as Vimal said at the beginning of the call, that we collected from Afghanistan, which came on sort of April -- so had it been in -- on 31st March, 4 days before, probably the debt level will be -- debt have further gone down [ in the March itself ].

P
Parikshit Kandpal
analyst

Okay, okay. And Vimal, sir, you would like to add something, you said, on this.

V
Vimal Kejriwal
executive

No, no. I think we did request the rating agency that we should look at the annual accounts numbers and all that, but I think they had their own time lines et cetera so they went ahead for that. So I think we are very clear that we will be able to -- once our numbers are sent to them, and maybe Q1 et cetera, we should see something [indiscernible]. Let's keep our fingers crossed, but I think overall what is also happening, Parikshit, is that -- with our quality of order book et cetera improving, I do feel that we -- the numbers on cash flow will improve. There are quite a few large projects both in Civil and also in Railways we have looked at where we expect commercial closures. And cash flows which have been sort of in the pipeline will start coming in, so I think overall, the balance sheet, the debt profile, we'll definitely see a significant improvement.

P
Parikshit Kandpal
analyst

Okay. And sir, just a last question, on the order inflow. I mean, last year, we had less than the guidance on the order inflow, so I just wanted to understand. What were the reasons behind that? And what is the guidance for FY '25? And I mean, will it be sufficient enough to make up for the loss we had so that we can deliver a 15% growth?

V
Vimal Kejriwal
executive

So FY '25, we are targeting around 25,000 crores. That's the easier answer for me. On the miss, I think there are 2 -- I'll say part of it is a deliberate miss because we really went slow in some of the sectors where we were seeing a cash flow issue and also somewhere some execution issues. So I'll say part of the miss -- I can't put a number, but maybe [ 2,000 ] would have been on account of deliberately not picking up orders or not bidding for some of the tenders which we had factored in as we will win. And second is 1 or 2 cases where we were L1. Unfortunately, we could not take the orders because of renegotiations. And the numbers which the clients were asking us were below our threshold et cetera, so we had to leave out a couple of orders. I mean, had we accepted them, we would have met 22,000, 23,000 of our target. So I think that's what it is there.

Operator

[Operator Instructions] The next question is from the line of Vaibhav Shah from JM Financials.

V
Vaibhav Shah
analyst

Sir, in terms of margins, what margins are we targeting for '25 and -- on a whole? And in terms of segmental margins, can you just provide a brief range of what were they in '24 and what we are expecting the improvement in the next 2 years? A broad range would do.

V
Vimal Kejriwal
executive

So FY '25, I just answered we are looking at a 7.5% margin for the full year. And we also said exit should be around 9% or 10%, so I presume that, FY '26, we still have not got our numbers because it will depend on orders and all that, but I think we should be close to double digit, at least 9% if not 10%. Very difficult to give a number for '26, but clearly it will be, I think, 9%-plus.

V
Vaibhav Shah
analyst

Okay. Sir, in terms of segments, can you provide some clarity, a broad range?

V
Vimal Kejriwal
executive

So I think -- the way things are happening today; and with the India market, India T&D market, looking up significantly, the way things are happening, I think the T&D margins will definitely be higher than the non-T&D. I can only tell you that much.

V
Vaibhav Shah
analyst

Okay, sir. Sir, secondly, what will be the outstanding debt at -- in SAE? And interest costs.

V
Vimal Kejriwal
executive

Interest. I think overall SAE cost around 11%...

U
Unknown Executive

[ I think it's ] about $50 million.

V
Vimal Kejriwal
executive

$50 million is our debt in SAE.

U
Unknown Executive

[indiscernible].

V
Vimal Kejriwal
executive

[indiscernible].

V
Vaibhav Shah
analyst

So are you planning to reduce the debt or replenish it from other -- from our side? Or it will continue at that level.

V
Vimal Kejriwal
executive

I think we are waiting for the -- I think, performance, we are improving, so there is some natural reduction. Also we have seen last year a reduction in the Brazilian interest rates, so hopefully, we should be able [ to reap ]. And also I think the balance sheet has improved, so we should be able to get a better internal rating of the banks in Brazil. So I think the rates should start coming down. Right now funding from India would obviously be at a cheaper rate, but I think we would still try to see if we can finance Brazil by itself. Looking at it, if nothing happens in the next 3 or 1 quarter or 2 quarters, we will probably do some capitalization there if required.

Operator

The next question is from the line of [ Sheth Saurabh Gujar ] from ICICI Prudential AMC.

U
Unknown Analyst

In your [ starting ] comments, you mentioned about slower execution due to something like HV transformers, aluminum conductors, all these, right? So when we are targeting, say, 20% growth next year, how do you see availability of these; and the supply chain shaping up both in the near term, say, 2-, 3-quarter view? As well as slightly medium to longer term, supply chain shaping up.

V
Vimal Kejriwal
executive

So as far as the 20% growth is concerned, there are 2 parts of it -- actually 3 parts. One is India. One is international, and one is SAE. So we are not seeing there is a problem, but we are not seeing that much of a stress in international as of now. India, I think, has been more of a stress on conductors and, to an extent, transformers and GIS, but for our program [ for at least ] plan for this year, we have a tie-up with all the vendors on the supplies, so I don't think we are worried about it. Conductors was still a little bit of an issue, which is why we decided to set up our own manufacturing, so I don't think the 20% is at risk because of the supply chain issues, no.

U
Unknown Analyst

Sure. And second question is on this HVDC. So say for HVDC opportunity coming up, if you take an index number. Say 10,000 crore HVDC contract which would have multiples of opportunity for both equipment players and for players like us. So broadly, how do you see -- or out of the 10,000 crores, say, HVDC project, what will be an addressable opportunity for us, for EPC players like us?

V
Vimal Kejriwal
executive

It would depend upon the structure of [ the bits ]. Like we are right now doing an HVDC where the main equipments are supplied by the manufacturer, and we are doing the entire civil. We are also doing mechanical erection and many other items of that. Then obviously our share will be higher. Recently, one of the bid which has come out, the POWERGRID, is where they have segregated civil completely and supplies and erection. So it depend. And so obviously the value goes down. The -- it will depend upon what shape and what format the bids come up. As far as transmission lines are concerned, I think we are seeing opportunities of probably 2,500 crores, 3,000 crores out of that 10,000, as transmission lines. So that's the opportunity in each of them. Even now we have got a large number of lines to be bid both in India and Saudi, where there are new [ expedition ] lines which have been announced.

U
Unknown Analyst

So just a follow-up on that. Say the POWERGRID project you mentioned about. In that, within the total project cost, what would have been the EPC package split out of the total project cost?

V
Vimal Kejriwal
executive

I don't have the exact number, but I think the Civil was around 1,000 crores-or-odd, okay, for the GIS, for the HVDC converter stations. And transmission lines would be probably around 2,500 crores or 3,000 crores. If you ask [ Abhishek ] later on, he will give you the exact number. I think it's roughly -- between the two put together, it would have been around 3,500 crores or so. Plus what will also happen is, once the converter station is, let's say, won by someone, maybe they will come back to us for the balance portion of the converter station also, which can probably add another 200 crores, 300 crores or maybe 400 crores for us, so it may end up with around 3,500 crores, 4,000 crores, in a way.

Operator

The next question is from the line of Amit Anwani from PL Capital.

A
Amit Anwani
analyst

My first question is on the railway business. So railway. You did highlight it, that this year also there would be de-growth. We have seen railway business for you growing from almost 300 crore, 400 crore to 4,000 crore between '17 to FY '22. Directionally, I wanted to understand since there's a de-growth for FY '25. And you did highlight it, that there's a working capital which is an issue from almost 2 years and the margins are quite low, so what -- directionally, what is the strategy for us over the next 2, 3 years in railway?

And second thing. I wanted to understand from you on the conventional railway versus nonconventional railway. Is there -- will there be more focus on the nonconventional railway projects going forwards within railway? So some sense on it would help, yes.

V
Vimal Kejriwal
executive

So Amit, last year, we decided that we will go slow till we get our act together, whenever the issues are understood, the contractual issues; and where we are running into right-of-way blockages et cetera. So I think we now have a, I'll say, reasonably good understanding of it. And how do we get back and whether we will get back and all, to me, will depend upon how the contracts are now structured. Already we are seeing some changes in the working capital structure, where earlier it was completely -- I'll say, completely milestone-driven that you do 10 kilometers and you get paid for 10 kilometer. And now already, some of the new tenders, we have agreed that, for supplies, they'll pay separately et cetera. So if the contract structure changes, where it becomes a little bit, I'll say, more friendly for working capital, number one; number two, how the new government and the ministry et cetera look at some of the process of EPC, I think all that would decide on how do we look at the conventional railway business. So this is basically on construction of new lines, doubling, tripling et cetera. On the technology front, whether it is TCAS or whether it is block signaling or S&T et cetera, I think we will continue to look at it and see what is to be done. Between conventional and nonconventional: I presume, nonconventional, one is the technology part of it. One is the metro part of it. Metro, we are bidding. We have got a few projects on ballastless track. We have L1 right now in a project for tower supply to a metro organization.

So I think we are -- in a way, I'll say we are sort of agnostic to about what projects we get, depending upon the margins which are there on individual tenders. Internationally, we are looking at closely, but I still feel that, '25, we will continue to de-grow. And '26 onwards, we should see a turnaround happening in the railway business.

A
Amit Anwani
analyst

Sure. Sir, next, on the Civil business, again the similar things. So you got to almost 6,000 crore intake FY '22, FY '23. And this year, we are at 4,000 crores in Civil despite your commentary on Civil was pretty strong with respect to the prospects on building factories and the civil work on metro side. So just wanted to understand. Is this the area which you just highlighted that -- deliberately going slow because of the pace of execution or payments? Or anything you would like to highlight going slow [indiscernible]?

V
Vimal Kejriwal
executive

So Amit, the commentary was strong basically on the revenue side. We had a large growth of more than 30% on the revenue. Order intake, I think the simple reason was that we more or less stayed away from very large projects, especially on the metro side. We have 4 large metro projects under execution. And I don't think we are very happy with what's happening on the cash flows. And we are facing a lot of delays on account of utilities et cetera, so we decided to be a little bit more conservative on that till we complete some of these projects, which I think we, from the next quarter or 2, will start completing and handing over. And secondly, we also did not see too many water projects coming up. See we have got an order book of almost, right now, 3,500 -- 3,000 crores, 3,500 crores in water; and where, for some strange reason, we did not see too many projects coming up. So basically we sort of, I'll say, deliberately stayed away from metro water. The opportunities are not there, so some of the large projects, which is what we had secured in FY '23, were not there.

So if you look at our order intake. For this year, it's primarily industrial and residential and, I think, one data center, if I'm not wrong. That's -- and obviously a hospital et cetera. So all these orders were in the [ B&F ] sector, as you ought to call it. So I do hope that -- next year, with the new government coming in, again, I think metros and all that will start coming in, so we will see. We do hope it will work up on that, but otherwise, on residential and industry -- and especially now we are seeing private CapEx slowly starting to go up, okay? Residential, there are more than enough opportunities. And so once the elections and all -- or I think, once we start getting labor, et cetera, we'll probably pick up a few more jobs and add to our order intake there.

A
Amit Anwani
analyst

Sure. Sir, lastly, on the order inflow this year. We closed at about INR 18,000 crores. And you did highlight it, that it deliberately went slow in a couple of projects. And competition-wise, we [ did not got ] a couple of projects. I wanted to understand which segments was this missed in FY '24. And second part is the 25,000 crore revenue intake which we are factoring in. What kind of intake segment-wise [ you are dissecting there ], yes.

V
Vimal Kejriwal
executive

So I think, if you -- I'm -- I was not very clear. Sound was not very clear then, but if you're asking about competition and all that: So obviously, international, we see -- international T&D, we see some degree of competition going up, especially in Africa, and all that. India, we have not seen significant competition either in T&D or even on the larger civil projects. If we take civil projects of 500 crores and above, hardly 3, 4 players and all that. If you are going sub 200 crores, then we are seeing a lot more competition. I think the biggest competition problem which we'll see is in Railways, where in many of the bids we are seeing 15 players, 17 players, 20 players, largely from the, I'll say, road industry or contractors to the road industry, subcontractors to the road -- I think those are the guys who are coming in. So today, if you look at that way -- even Cables, we have been seeing some competition happening. There are at least 7 or 8 players in most of the cable orders. So that's the way we see. India T&D, lower; then Civil; then probably international; then cable. And then Railways is that [ all of ] increasing competition.

A
Amit Anwani
analyst

Yes. Actually I wanted to understand. The 6,000 crore miss in order intake this year was in which segments?

V
Vimal Kejriwal
executive

So I had explained that earlier. So we had explained it earlier, saying that we had deliberately not taken some orders, which are more in the T&D sector, [ where the negotiations were happening ] and they wanted lower prices and that was going below our threshold. And secondly, in Railways, we went very careful what of orders we will take, so I'll say -- and part of -- so it will -- mix of Civil; Railways; and part of international T&D; and even India also, some of the private developers [ we said ].

A
Amit Anwani
analyst

Sure, sir. Lastly, some color on...

V
Vimal Kejriwal
executive

Amit, you can come back. Amit, you'll have to come back in the queue. There's a long queue here. Please.

Operator

Yes, sir. Please rejoin the queue for follow-up questions. [Operator Instructions] The next question is from the line of Uttam Kumar Srimal from Axis Securities Limited.

U
Uttam Srimal
analyst

Sir, what is the other CapEx guidance for FY '25 and FY '26?

V
Vimal Kejriwal
executive

'26, we have not yet firmed up our CapEx. FY '25 will be close to probably 350 crores or so.

U
Uttam Srimal
analyst

Okay, okay. And sir, how much amount is remain to be collected from Afghanistan currently?

V
Vimal Kejriwal
executive

[indiscernible] Rajeev?

R
Rajeev Aggarwal
executive

Roughly about 200 crores [indiscernible].

V
Vimal Kejriwal
executive

[indiscernible].

R
Rajeev Aggarwal
executive

That's remaining is about 300 crores, [ next year ].

V
Vimal Kejriwal
executive

[indiscernible]. Around 300 crores.

U
Uttam Srimal
analyst

300 crores. And sir, with regard to interest costs: So it will remain same in FY '25, what has been in FY '24, total amount...

V
Vimal Kejriwal
executive

FY '24 was high. We were 3.3% of revenue. FY '25, we are guiding almost at the same level of Q4 of 2.5%.

R
Rajeev Aggarwal
executive

Correct.

Operator

The next question is from the line of Riya from Aequitas.

R
Riya Mehta
analyst

My first question is in regards to the supply chain challenges that we are seeing. So what kind of inventories do we keep for conductors? And if we are planning to set up our own manufacturing facility, what kind of CapEx are we seeing there?

V
Vimal Kejriwal
executive

So Riya, I answered it earlier. We are planning a CapEx of 60 crores for the conductor. Secondly, we don't have any inventory of conductor. We basically is -- order from project to project, and it goes to the project site and then installed quickly. So we don't have any inventory.

R
Riya Mehta
analyst

Are we seeing any price hikes from the suppliers?

V
Vimal Kejriwal
executive

There are marginal price hikes which are happening and which we'll apply to the newer projects, so that is factored into tender costing when we tender for a new project. Old ones, generally we have not seen anything which is significant, but let me tell you that aluminum -- and that is always on a price variable, so when we talk about price hike, if the metal goes up, the price will obviously go up.

R
Riya Mehta
analyst

Right. And in terms of AL-59 conductor which we are speaking about, what percentage of our total orders or an order inflow which we are seeing would comprise of that?

V
Vimal Kejriwal
executive

So as far as POWERGRID is concerned, probably 75%, 80% -- or actually [Foreign Language]. Yes, almost, I'll say, 75%, 80% of the orders would have AL-59.

R
Riya Mehta
analyst

Okay. And you also mentioned that there is a supply issue in DI pipes as well. However, large water projects are drying up going forward, so what is your outlook over there?

V
Vimal Kejriwal
executive

I think that is the expectation, that with the water projects drying up, in a fashion, DI pipes should improve [ availability ], number one. Number two, we have seen that most of the players have expanded capacity, so I think, where expanded capacity is slowly coming into production, we are actually -- I know at least 2 or 3 of them started supplying from the new capacities. So I think it's a matter of time; that maybe in a quarter or so, this will become normalized.

R
Riya Mehta
analyst

Got it. And what kind of water projects decline or de-growth are we seeing yet? Like if just to give a perspective and context.

V
Vimal Kejriwal
executive

For example, this year, we did not get a single water project. There were hardly any bids which were announced last year. [ I guess we should have won, what ], 2,000 crores last year.

U
Unknown Executive

Last year...

V
Vimal Kejriwal
executive

2,000 crores won -- so last -- in FY '23, we had won 2,000 crore projects in water. FY '24 was 0.

Operator

The next question is from the line of Arafat Saiyed from InCred Research.

A
Arafat Saiyed
analyst

Am I audible?

V
Vimal Kejriwal
executive

Yes, yes. It's all right.

Operator

Yes.

A
Arafat Saiyed
analyst

Yes. So I just want to understand, let's say, more about the international pipeline. You said close to 40,000 crores is still available. So kind of, just briefly, about what exactly, in which region you are looking for these kind of opportunities.

V
Vimal Kejriwal
executive

So as of -- largely it is Middle East, okay, largely. It is between Saudi and Abu Dhabi. Then there -- a part of it is in Africa. And then balance is spread over East Asia and Americas et cetera.

A
Arafat Saiyed
analyst

Okay. And sir, my last and next question, again on opportunity. I just want to understand, let's say, what happened in last, let's say, 6 to 8 months that certainly the opportunity will be significantly, especially on the -- both India and the international T&D. So I just want to understand, let's say, which segment or, let's say, from where this opportunity coming in India and also from the international market.

V
Vimal Kejriwal
executive

Arafat, international, there has not been any major change in the outlook and all that. That's why we did not say that international will grow significant. It's going well. And the opportunities are basically in 2 areas, which is the Middle East, which is both UAE and Saudi; and also in the North America, especially U.S. part of it, where we are seeing opportunities, but that's a typical growth of 10%, 15% which we will have, okay? India, I think what has changed -- probably, 1 year, 1.5 years [ back over time ], we had large power cuts et cetera. And that was the time when, I think, suddenly the government realized that they need more power. And the entire thinking on the Ministry of Power changed from not adding capacity both on the supply side and on the T&D side. That's number one. Number two, what happened was that, with -- the way our Prime Minister heading the G20 and the entire focus on green energy. Suddenly, the government went all out to ensure that renewable capacity is added. Now most of the renewable capacity, you are aware, is coming up in Gujarat and some parts of -- so Gujarat, towards the Pakistan border. And also a large part is coming in Rajasthan. So obviously that needed large lines, so that was the second part.

The third part was that, earlier, the transmission guys used to wait for the -- well, the power plant -- for the renewable plants to be set up, start working and then start transmission lines. And then that resulted in the solar plant getting ready and the transmission lines not being ready, so somewhere, the CEA has taken a call saying that, once approval has been given for a solar or a wind farm, let the transmission line be set up irrespective whether the power generation is happening or not. So suddenly, they have pushed the REC and PFC et cetera and what the [ rural ] agencies called TBCB to go ahead and start implementing all the notified schemes without waiting for the solar plant [indiscernible]. So I think they are the 2 or 3 major changes which we see which have resulted in this push for more of transmission.

And let me add on something, as today, as KEC, we are almost doing 3 or 4 lines which is bringing more power to Mumbai. So also that the power demand itself is going up significantly. We are building 4 data centers. Each of them is consuming huge power. So the inherent demand for power has also gone up, apart from the push for renewables. I hope I'm clear.

A
Arafat Saiyed
analyst

Yes.

Operator

We'll take the next question from the line of Saket Kapoor from Kapoor Company.

S
Saket Kapoor
analyst

Sir, when you mentioned about 60 crore CapEx, it is only for the conductors. Or do we have any additional line for cables also?

V
Vimal Kejriwal
executive

[Foreign Language]

S
Saket Kapoor
analyst

And sir, [Foreign Language].

V
Vimal Kejriwal
executive

[Foreign Language]

S
Saket Kapoor
analyst

Okay. When will this get commissioned?

V
Vimal Kejriwal
executive

So we are targeting for Q3.

S
Saket Kapoor
analyst

Q3 of this financial year.

V
Vimal Kejriwal
executive

Yes, yes, yes.

S
Saket Kapoor
analyst

And sir, then the conductors, the margin profile is definitely higher [indiscernible] cable, sir.

V
Vimal Kejriwal
executive

It depends [Foreign Language]. What is -- look. So I guess what is happening is that the conductor price will be decided by the demand-supply, which obviously today is in favor of the suppliers. So margins will depend upon -- we have some orders from outsiders [Foreign Language], so we'll probably have some margin getting built into our transmission business. But overall, yes, there will be an improvement in the overall numbers.

S
Saket Kapoor
analyst

Sir, when you look at the cable business as the other segment classified. The revenue was flat, but there is an increase in -- improvement in margin. So for the next year, Cables segment [Foreign Language] between EHV and the high-voltage cables and any other profiles.

V
Vimal Kejriwal
executive

So difficult to give you exact numbers. I don't have those numbers, but [Foreign Language].

S
Saket Kapoor
analyst

[Foreign Language]

V
Vimal Kejriwal
executive

[Foreign Language]

S
Saket Kapoor
analyst

[Foreign Language]

V
Vimal Kejriwal
executive

Rajeev?

S
Saket Kapoor
analyst

[Foreign Language]

V
Vimal Kejriwal
executive

[Foreign Language]

S
Saket Kapoor
analyst

Right. A small point, Rajeev-ji. [Foreign Language] and for the year as a whole.

R
Rajeev Aggarwal
executive

So again, the ForEx impact for this year has been very negligible. I think it must [ 5 crore, 7 crore ] here and there, reason being that our -- most of the ordering which is happening is in the Middle East. [indiscernible] currency [ stack ]. And a lot of these orders are coming up in our subsidiary companies in Dubai and joint venture in Al Sharif KEC, so there is not significant foreign exposure that we have [ currently ]. Whatever we are doing, let's say, in other jurisdiction, we are either hedging them -- either [ selling those ] currencies or we are actually taking borrowing against that. So effectively, to that extent, our borrowing interest cost gets reduced, to the extent of hedging against those contracts. So foreign exchange, I don't think there is a significant variation this year.

S
Saket Kapoor
analyst

Okay. And sir, Vimal, the last point, on the 400 crores deferred revenue, I missed your point. This segment, it was -- and when will those get accounted for?

V
Vimal Kejriwal
executive

So largely transmission and some part of it in Civil. Your DI pipes, the supply, the shortage [ come ]. So part of DI pipes were not supplied. And partly on account of conductors and a little bit of transformers which did not happen because of the Red Sea. [ Gujarat and ] Middle Eastern, the supplies come from Europe, so some part of the European supplies got deferred. Those are 2 major reasons: water then Civil; and in transmission.

S
Saket Kapoor
analyst

And this DI pipe issue is resolved now. We have delivery with -- how -- is this domestic issue? Or foreign line.

V
Vimal Kejriwal
executive

It is domestic issue. DI pipes is for a water project. So government has given a lot of water projects. [Foreign Language]. Plus what has happened is all the DI pipe manufacturer expanded capacity. So I think it's a matter of time, but it is only a deferment of revenues to [Foreign Language].

S
Saket Kapoor
analyst

[Foreign Language] in terms of time overruns. 109 of the 249 [ revenue ] projects pays time overruns. [Foreign Language] How does this come into impact, [ this ] time overrun [indiscernible] in majority of the railway projects? [Foreign Language]

V
Vimal Kejriwal
executive

[Foreign Language]

S
Saket Kapoor
analyst

[Foreign Language]

V
Vimal Kejriwal
executive

[Foreign Language] margins to improve over here, one of the reasons for the PVC component which are doing ourselves.

S
Saket Kapoor
analyst

Right. [Foreign Language]

V
Vimal Kejriwal
executive

[Foreign Language]

S
Saket Kapoor
analyst

[Foreign Language]

V
Vimal Kejriwal
executive

[Foreign Language]

Operator

The next question is from the line of [ Dhruv ], an individual investor.

U
Unknown Attendee

Congratulations on a good set of numbers. Sir, I wanted to understand that -- if in an EPC project the project side is supposed INR 2,000 crores in the transmission segment, sir, how much cost is incurred on towers in that INR 2,000 crores? And if you can give the rough idea on how much percentage is spend on substation, cables, poles and other parts for this cost bifurcation, sir.

V
Vimal Kejriwal
executive

So it -- [ Dhruv ], it would depend upon what -- where the project is coming, but as you know -- so what sort of combination you are using, 6 conductors, multi [indiscernible]. There are a lot of combinations, but if you ask me, in a typical environment it will be 1/3 -- we always call 1/3, 1/3, 1/3. 1/3 is construction. 1/3 is tower supply. 1/3 is conductor and other, insulators, hardware et cetera. That's a very standard ballpark which you can take [indiscernible]. If the lines are very long, it may be very different. And today, when we are seeing AL-59 et cetera where the conductors are very heavy and more, I'll say, expensive technology-wise, conductors itself are becoming 40%. [Foreign Language]. Substations is very difficult to give an answer, okay, because substation [Foreign Language]. If you ask me, around 80% will be supplies, which would be transformers and whatever else is there [ in that CRP files ] et cetera. And 20% will be construction.

U
Unknown Attendee

Okay, fair enough, sir. Sir, on the Solar side, what is the order book as of now stands at? And going forward, how do you see the segment going forward for you, sir?

V
Vimal Kejriwal
executive

So Solar. I think our order book is roughly around 300-and-odd crores or something. I don't have the exact number, but it's ballpark [indiscernible]. We are waiting and looking. We have been bidding for some projects. [Foreign Language] the risk profiles are different. So whatever risk profile suits us, [ where there are ] liabilities et cetera we are willing to take, those are the projects which we are bidding for. I don't think we are bidding very aggressively, so maybe we'll take 1 or 2 more projects or maybe 3 projects, [ I don't know ], this year. And depending upon how the performance happens, then we will probably go more aggressively in this business. I think FY '26 is a year when we will probably have a much larger revenue arising out of this.

U
Unknown Attendee

Okay, so there is no plans right now in the FY '25 to expand this segment very aggressively, sir.

V
Vimal Kejriwal
executive

[ Dhruv ], I said that we may take 2 or 3 projects. And [indiscernible] around 500 crore, 600 crore. So we may get an order book of maybe [ 1,015-odd, maybe 200 ], depending how lucky or unlucky we are. Maybe we could get an order intake of maybe 2,000 crores.

Operator

Ladies and gentlemen, that was the last question for today. I would now hand the conference over to Mr. Vimal Kejriwal for closing comments. Over to you, sir.

V
Vimal Kejriwal
executive

Well, thank you very much for your continued interest in KEC. Thank you. And we are very -- pretty confident of delivering on the numbers what we have talked about. Thank you. And thanks, Michelle. Thank you so much.

Operator

Thank you, sir. Thank you, members of the management. Ladies and gentlemen, on behalf of KEC International, that concludes this conference. We thank you for joining us, and you may now disconnect your lines. Thank you.

All Transcripts

Back to Top