J.K. Cement Reports Strong Q3 Growth

J.K. Cement showcased a robust performance in the 3rd quarter, with net sales climbing 9% from Q2 to INR 2,690 crores and an 18% year-over-year increase. EBITDA rose significantly by 36% from the previous quarter to INR 608 crores, surging 147% from the same period last year, boosting EBITDA margins to 22.6%. The company expanded operations, commissioning a 1.5-million-ton grinding unit at Ujjain and advancing the 2-million-ton unit at Prayagraj, expected to be operational by the July-September quarter. A bold expansion plan outlines an addition of 6 million tons in Central India, raising gray cement capacity to 30 million tons by FY '26. Accomplishing this comes with significant investment, projecting a capital expenditure (CapEx) of INR 1,200 crores this year, with INR 2,200 crores and INR 1,800 crores to follow in the next two years. The company's financial health is also on solid ground, showing a reduced net debt to EBITDA ratio of 1.64% and a gross debt at INR 4,585 crores.

Robust Sales Growth and Earnings

J.K. Cement's financial narrative this quarter is one of strong growth. Net sales have risen by 9% from the previous quarter, reaching INR 2,690 crores, and showing a significant 18% increase compared to the same quarter last year. EBITDA soared to INR 608 crores, marking a 36% increase from the previous quarter and a substantial 147% jump from the prior year. This impressive growth storyline is further underlined by the EBITDA margins which escalated to 22.6%, compared to just 18% in the previous quarter and 10.8% last year.

Operational Milestones and Expansion Strategy

The company commissioned an important 1.5 million ton grinding unit at Ujjain and is nearing the completion of another 2 million ton unit at Prayagraj, set to be operational by the July-September quarter. With an eye on the future, the Board of Directors has outlined an ambitious expansion with an additional 6 million tons in Central India at a projected cost of INR 2,850 crores. This expansion, encompassing a 3.3 million ton Clinker Line at Panna and a 6 million ton grinding facility, is expected to elevate the company’s total gray cement capacity to 30 million tons by the end of FY '26.

Current Operations and Financial Health

The present-day operations showcase a capacity utilization of 75% for gray cement, with volumes at 4.15 million tons for the quarter and sales consisting of a 66% blended mix, 62% trade mix, and 12% premium products. Financially, J.K. Cement remains sturdy, showing a gross debt of INR 4,585 crores, while maintaining a healthy net debt to EBITDA ratio that improved to 1.64% from 2.21% as of the end of the prior fiscal year.

Capital Expenditure and Future Investments

Investors would note the current year's capital expenditures (CapEx) stand at INR 900 crores to date, anticipating to close at around INR 1,200 crores due to a spillover of INR 200 crores. Looking ahead, the CapEx for the next year is projected to be INR 2,200 crores, significantly above the previously guided INR 800 crores, as the company gears up for the planned expansion projects. By FY '26, further investments are anticipated, rounding up to INR 1,800 crores dedicated to solidifying the company’s operational foundation and growth trajectory.

Earnings Call Transcript

Earnings Call Transcript
2024-Q3

from 0
Operator

Ladies and gentlemen, good day, and welcome to the Q3 FY '24 Earnings Conference Call of J.K. Cement hosted by PhillipCapital India Private Limited. [Operator Instructions] Please note that this conference is being recorded.

I now hand the conference over to Mr. Vaibhav Agarwal from PhillipCapital India Private Limited. Thank you. And over to you, Mr. Agarwal.

V
Vaibhav Agarwal
analyst

Yes. Thank you, Michelle. Good evening, everyone. On behalf of PhillipCapital India Private Limited, we welcome you to the Q3 FY '24 call for J.K. Cement Limited. On the call, we have with us Mr. Ajay Kumar Saraogi, Deputy Managing Director and CFO; and Mr. Prashant Seth, President of Business Information and Investor Relations.

I would like to mention on behalf of J.K. Cement Limited and its management that certain statements that may be made or discussed on conference call may be forward-looking statements related to future developments and based on current expectations. These statements are subject to a number of risks, uncertainties and other important factors, which may cause the actual developments and results to differ materially from statements made. J.K. Cement Limited and the management of the company assumes no obligation to publicly alter or update these forward-looking statements whether as a result of new information or future events or otherwise.

I will now hand over the floor to the management of J.K. Cement for their opening remarks, which will be followed by interactive Q&A. Thank you, and over to you, Saraogi sir.

A
Ajay Saraogi
executive

Thank you, Vaibhav. Good afternoon, and welcome to Q3 results. So the Board of Directors met on 20th of January to review the working of the company for the quarter ended 31st December, third quarter 2023. The salient features that the net sales during this quarter as compared to Q2 had risen by 9% at INR 2,690 crores as against INR 2,476 crores and if we compare them with previous year, it is up 18% at INR 2,281 crores as against INR 2,690 crores. The EBITDA during the quarter was INR 608 crores as against INR 447 crores in the previous quarter, an increase of 36% and INR 246 crores in the previous year, an increase of 147%.

The EBITDA margins for the quarter was 22.6% as against 18% in the previous quarter and 10.8% in the previous year. The profit before tax in this quarter was INR 415 crores as against INR 246 crores, an increase of 69% and INR 90 crores last year, an increase of 363% over last year. The EPS was INR 37.40 as against INR 23.10, and INR 7.40 in the previous year. So during this quarter, the company also commissioned the grinding unit of 1.5 million tons at Ujjain. And the work at the grinding unit of 2 million tons at Prayagraj is at advanced stage, and this would likely get commissioned by September -- July-September quarter.

So also, the Board of Directors in the meeting decided an expansion of 6 million tons in Central India, out of which the salient features of the expansion are that 3.3 million tons would be the Clinker Line at Panna, which will be line #2 at Panna and 6 million grinding unit. So grinding of 6 million is coming from 3 million of greenfield grinding in Bihar and 1 million incremental grinding by way of modifications in the existing systems at Panna, Prayagraj, and Hamirpur. So that would make -- so that would be 6 million tons of cement grinding. This is expected at a total project cost of INR 2,852 crores -- INR 2,850 crores, out of which it is proposed to borrow rupee term loan and some debentures from banks of INR 1,850 crores and balance would be from internal accruals.

The commissioning is around within 24 months and it is expected that the work may start sometime by March, April this year. So within FY '26, we expect to complete this expansion of 6 million tons. And with this expansion, by FY '26, the company's overall gray cement capacity, installed capacity would be 30 million. The present capacity is 22 million. 2 million tons at Prayagraj is under implementation and 6 million tons, new capacity is proposed. So by end of FY '26, the company's overall gray cement capacity would be 30 million tons.

During the quarter, if we see the capacity utilization for the gray cement was around 75%. The gray cement volumes was 4.15 million tons. The blended ratio was 66%, the trade mix was 62% and the premium products was 12% of the trade volumes. If we look at the gross debt as on 31st December, that was INR 4,585 crores and the net debt to EBITDA was 1.64% as against 2.21% as on 31st March 2020 -- as of 31st March 2023. So these are the major highlights and the working. If you have any questions, we'll be pleased to address the same. Thank you.

Operator

[Operator Instructions]

The first question is from the line of Shravan Shah from Dolat Capital.

S
Shravan Shah
analyst

Congratulations, sir, for a very good set of numbers. Sir.

A
Ajay Saraogi
executive

Thank you.

S
Shravan Shah
analyst

Sir, my first question is just to getting a time line confirm in terms of this 3.3 clinker and 6 million. So this 3.3 clinker at Panna would be starting in Q4 FY '26 and 6 MTPA grinding to start by Q1 FY '26, that's the fair way to look at?

A
Ajay Saraogi
executive

No, no. See, by end of FY '26, all this will get commissioned because we are expecting the clinker line, as we have done earlier at Panna, so we are taking an outer limit, some approvals are pending. I mean, once we get the consent and all, if we start work by March, April this year, we can definitely get it commissioned within December '25, everything. The cement grinding would be complete -- can be completed earlier, but there is no point in completing it earlier when we will not have the clinker available.

S
Shravan Shah
analyst

Okay. Got it. And now considering this INR 2,900-odd crores kind of a CapEx, so what's the CapEx we have done in 9 months and what's the revised guidance for FY '24, '25 and '26?

A
Ajay Saraogi
executive

See, we have done the actual CapEx of around INR 900 crores till now. And earlier guidance was INR 1,400 crores, but we expect to close with the spillover of INR 200 crores. So this year, the CapEx would be in the range of INR 1,200 crores. And next year, yes, against the guidance of INR 800 crores. Now we will have the CapEx for this Line-2 also, Panna Line-2 and this 6 million grinding. So it will be in the range of INR 1,200 crores and INR 200 crores of the spillover from current year, so next year CapEx would be INR 2,200 crores.

S
Shravan Shah
analyst

Okay, INR 2,200 crores. Okay.

A
Ajay Saraogi
executive

Yes.

S
Shravan Shah
analyst

And in FY '26 would be then?

A
Ajay Saraogi
executive

FY '26 would be around INR 1,800 crores.

S
Shravan Shah
analyst

Sorry, sir. INR 2,000 crores and -- INR 2,200 crores in FY '25 and INR 1,800 crores in...

A
Ajay Saraogi
executive

FY '26.

S
Shravan Shah
analyst

FY '26. Okay. Okay. Got it. Now coming to the -- in terms of the volume and the pricing and the profitability front, so just 2, 3 things. So in terms of the -- definitely, we are doing much better on the gray volume front. So in 9 months, we have done 21.3% kind of a growth. So is it fair to say that for the full year, definitely, we should be having a 19% kind of a growth? And any broader idea in terms of the next year in terms of the volume growth? Because for industry, I would say, it would be a slowing. So for us, how one can look at in terms of the gray volume growth for FY '25?

A
Ajay Saraogi
executive

So you see, we should close anything around 16.5 million tons in this year by March '24. And I mean, as we said earlier, incrementally, you could say, minimum 2 million tons coming each year in FY '25 and FY '26, incremental volume.

Operator

[Operator Instructions]

The next question is from the line of Aman Agarwal from Equirus.

A
Aman Agarwal
analyst

And many congratulations on a strong set of results once again. Sir, on gray Cement, while I understand, gray cement business has been doing very well. I just wanted more clarity on how the white business is doing. Last, you mentioned there were some realization cut, especially in the putty business due to steep competition. Just wanted an update on that, how is the current scenario?

A
Ajay Saraogi
executive

So we've achieved -- the white business, there is a stiff competition in the white business, especially in the putty segment. And though we have been growing, and if you look at the white business, that has also grown by about 5% in the 9-month period, if you look at over year-on-year. So with April-December '22 to April-December '23, there's a 5% growth. Yes, the profitability, I would say that the white cement is more or less flat if you look at the whole business. So we are expecting around anything between EBITDA margins of 15% to 18% in the white business.

A
Aman Agarwal
analyst

Sure, sir. And sir, in terms of overall cost per ton, last call, you related that you expect INR 50 per ton kind of a saving in 3Q as well as 4Q. In 3Q, we have already posted a cost saving in excess of INR 100 per ton. Would you be expecting further cost saving in 4Q on a sequential basis?

A
Ajay Saraogi
executive

Yes, there could be. See, again, Q3 has been exceptionally because one, some of the cost per ton, when you see net of the stock adjustment, is also because the trade adjustment is there when you value the inventory. But definitely, we could see another -- but major savings have been already affected. We may get some marginal savings, anything between INR 30 to INR 40 in this quarter or so.

A
Aman Agarwal
analyst

Understood, sir. And sir, would it be possible for you to share your region-wise growth for this quarter or maybe 9 months '24?

A
Ajay Saraogi
executive

No, we are not sharing those numbers.

Operator

[Operator Instructions] The next question is from the line of Devesh Agarwal from IIFL Securities.

D
Devesh Agarwal
analyst

Sir, firstly, on the expansion itself, so you did mention that we are targeting these in the FY '26...

Operator

I'm sorry to interrupt. Sir, your audio is not clear.

D
Devesh Agarwal
analyst

Is it better now?

Operator

Yes, sir, please continue.

D
Devesh Agarwal
analyst

Yes. So sir, on the expansion, I just wanted some more clarity in terms of whether the land is available at all the locations, except for the greenfield? Is that -- will that be the case?

A
Ajay Saraogi
executive

Yes. Except for the Bihar grinding location, where we have identified a few locations, but we are still to close those locations. Otherwise, rest is, in a way, brownfield expansions, so there are no land issues.

D
Devesh Agarwal
analyst

Right. And in terms of ordering, sir, what will be the targets?

A
Ajay Saraogi
executive

Pardon?

D
Devesh Agarwal
analyst

For ordering.

A
Ajay Saraogi
executive

So we have already started getting the quotations and I think we should be able to finalize all the orders, also the main plant and equipment within next 3 to 4 months' time.

D
Devesh Agarwal
analyst

Understood. And so in Bihar, you have not finalized the location, right? It is still work -- in works, exactly where the plant would be?

A
Ajay Saraogi
executive

Pardon.

D
Devesh Agarwal
analyst

In Bihar, where exactly the plant will be that is still in works, the location has not...

A
Ajay Saraogi
executive

We had 2, 3 options, so we are just working out and we shall freeze the same within next 2, 3, 4 months. See, again, once we get the land and we simultaneously get the approval, environment clearance and all so that, the land acquisition and environmental presence should take about anything between 6 to 9 months. And we feel that we can commission the grinding unit within a span of 12 months.

D
Devesh Agarwal
analyst

Understood. And sir, if you see the share of Central India in that total volume since kind of increasing, just wanted to understand the differential probability between North and Central India.

A
Ajay Saraogi
executive

So now see, again, Central India, though the pricing is a bit lower than what it is in the northern region. But there because the plant, is a new plant, we get the plant efficiencies and we have a subsidy benefit. So more or less, we can see that the profitability of Central and North is more or less the same, considering we get the benefit of the subsidy in the region.

D
Devesh Agarwal
analyst

Understood, sir. And sir, finally, what is the update on the paint business? How much has been the revenue and EBITDA? And what will be the target for FY '25?

A
Ajay Saraogi
executive

So as we already said, yes, we are working on the paint business, and we have been able to ramp up the volumes. If we look at, I mean, we have already crossed a turnover of INR 100 crores in the 9 months. And now we feel that we should be able to close the year somewhere around INR 150 crores plus as a top line. So that was -- this is -- so we -- after launching the JK Maxx sometime in the beginning of this year in a small way and then ramping it into our main core markets, so we have -- we are getting a good traction and we feel that it would definitely be over INR 150 crores because if we look at the paint top [ level, ] we have done around INR 46 crores in quarter 3 itself. And so we expect, so around INR 150 crores plus.

Yes, there would be because of the onetime asset, we have to develop the brand with the branding cost. There would be an operational loss, anything ranging from INR 15 crores to -- INR 20 crores was our -- what we estimated could be INR 20 crores, INR 25 crores could be our loss. So in the -- up to a 9-month period, we have incurred a loss of about INR 15 crores on the paint business, but that is nothing exceptional. I mean, we are -- if we look at, we are monitoring the business on gross margin basis and, there, we are at the level where what was planned.

D
Devesh Agarwal
analyst

And for, sir, FY '25, any numbers that you can share in terms of profitability?

A
Ajay Saraogi
executive

So FY '25, we should have a top line anything between INR 250 crores to INR 300 crores. As far as profitability is concerned, again, it will depend, I mean, how there will be a marginal profit or loss because we need to build up the brand. Actually, we become EBITDA positive in a way in FY '26, when we are closer to INR 500 crore top line -- INR 400 crores, INR 500 crores top line.

Operator

[Operator Instructions] The next question is from the line of Pathanjali Srinivasan from Sundaram Mutual Fund.

P
Pathanjali Srinivasan
analyst

Am I audible, sir?

Operator

Yes.

P
Pathanjali Srinivasan
analyst

Yes. Firstly, congrats on a good set of numbers. I did have a few questions. One is on gross debt, so post our CapEx, what would our gross debt levels be at the peak in the next couple of years?

A
Ajay Saraogi
executive

So see, our present debt -- gross debt is around INR 4,600 crores. And post, we are -- by FY '26, it should be around INR 5,500 crores of -- see, we are going to borrow about INR 1,850 crores. But the 2 years, we will end up paying -- repaying about INR 800 crores, INR 900 crores of debt also. So incremental increase would be around INR 1,000 crores of debt, so we could say we can peak maximum up to INR 5,600 crores as a gross debt.

P
Pathanjali Srinivasan
analyst

Okay. Sir, and white cement, the realization seem to have increased from the previous quarter, is it possible to quantify what the increase was?

A
Ajay Saraogi
executive

No, see, realization increase when we're talking about, it's a -- total white cement is a combination of -- when we talk about, it's the product mix change and other things. So exactly -- as far as putty is concerned, definitely, quarter-on-quarter, there is some pressure on the pricing, but there is a product mix change where it is showing marginally higher realization per ton.

P
Pathanjali Srinivasan
analyst

Okay. So does it mean that we've been selling more of specialized products or something, which is why the realizations have gone up a bit?

A
Ajay Saraogi
executive

It's a combination of everything. Specialized, we make a ShieldMaxX, a premium putty, and other products. And this was a seasonal quarter, so it depends on that.

P
Pathanjali Srinivasan
analyst

Okay. Sir, and just one last question. What is our energy cost per kcal?

P
Prashant Seth
executive

So INR 1.80 paisa.

P
Pathanjali Srinivasan
analyst

And we see it going down by how much in the next quarter?

A
Ajay Saraogi
executive

Marginally, if -- because we already have inventory at this rate, so I don't think so that in this quarter, there could be some marginal difference, not anything. The petcoke prices have reduced, and we should see some reduction. But it will -- it would be seen only in the first quarter of next fiscal because this is based on the inventory levels looking to -- we are more dependent on imported fuels, so we have 60, 75 days inventory with us.

P
Pathanjali Srinivasan
analyst

Okay, sir. And just one last question, if I could squeeze in. What is our WHRS and renewable targets for '25, '26?

A
Ajay Saraogi
executive

So on WHRS, again, one, a new WHRS plant at Muddapur is in advanced stage. It's actually under trial runs, so that will get commissioned and that will add. So in the next quarter, we will start seeing the benefit of -- and partially in this quarter and fully in the first quarter of next fiscal, we shall be seeing. So our present...

P
Prashant Seth
executive

The present WHRS capacity is 64 megawatts, so that will go up to, say, by another 18 megawatts at the Muddapur. And then we will have the WHRS in the new clinker Line-2 at the Panna also. So we will be doing...

A
Ajay Saraogi
executive

Solar and wind, we are doing the regular tie-ups and we hope to increase it by around, say, 50 megawatts -- 50, 60 megawatts every year.

P
Pathanjali Srinivasan
analyst

So related to that, I saw something in our presentation, which said 22 megawatts agreement until 31st March '24. What does that actually mean, sir?

P
Prashant Seth
executive

So that agreement [Foreign Language] that tie up will expire by that period. .

P
Pathanjali Srinivasan
analyst

Okay. So will we renew it? Or how does it like -- is that our option...

A
Ajay Saraogi
executive

We had true tie-ups also. Actually, we had some short-term tie-ups. Now we are entering into a long-term PPA agreement. So in between, we had a short-term tie-up also, which was included in that.

P
Pathanjali Srinivasan
analyst

Yes, I just wanted some number on how much we target for '25, '26 in terms of renewable.

A
Ajay Saraogi
executive

So see, '25, '26 in terms of renewal, we should definitely have -- I mean, I think we can take around additional 50 megawatts, for sure. Of which, 25 megawatt would be waste heat by FY '26 because Line-2 will have that waste heat and incremental solar power of another 25, so we could see another additional 50 megawatts coming up in FY '25, '26.

P
Pathanjali Srinivasan
analyst

So this is an addition to our Muddapur 18 megawatt, right?

A
Ajay Saraogi
executive

Yes, yes. This is in addition to Muddapur, yes.

P
Prashant Seth
executive

Yes.

Operator

The next question is from the line of Amit Murarka from Axis Capital.

A
Amit Murarka
analyst

On Central India subsidies, how much was booked in this quarter?

A
Ajay Saraogi
executive

So each quarter for the company, total subsidy works out to around INR 26 crores, INR 27 crores per month. It's about INR 80 crores per quarter. INR 75 crores to INR 80 crores per quarter.

A
Amit Murarka
analyst

Okay. Okay. And like what is the total quantum of the available fiscal incentives here?

A
Ajay Saraogi
executive

So we expect that for total quantum, it varies at -- in Panna, total is about INR 300 crores, which we will get. And then there are fiscal incentives, which are available for the grinding locations. So year-on-year, we should get around INR 300 crores for next few years.

A
Amit Murarka
analyst

Okay. Okay. And then Panna phase 2 will also have incentives again, right?

A
Ajay Saraogi
executive

Yes, so we shall be making an application and, hopefully, we should get.

A
Amit Murarka
analyst

Got it. And in terms of the peak net debt, you said, I think, INR 5,600 crores of gross debt, right?

A
Ajay Saraogi
executive

Yes, that is what -- presently is INR 4,600 crores, so I said incremental INR 1,000 crores should be there, or that is what we see as a peak debt.

A
Amit Murarka
analyst

Understood. And also in terms of the paint revenue, you, I believe, booked some revenue in stand-alone business as well. What would be the quantum for Q3, 9 months?

P
Prashant Seth
executive

So that is around INR 25 crores -- INR 26 crores, exactly.

A
Amit Murarka
analyst

And that would be getting clubbed into the white cement putty revenue, right?

P
Prashant Seth
executive

Yes, yes, yes.

A
Amit Murarka
analyst

Okay. Okay. And is there some EBITDA also of this? Or should we consider this would be neutral on EBITDA?

A
Ajay Saraogi
executive

No, there is no -- see, as a paint -- when we talk about total -- in the stand-alone results, there could be some marginal EBITDA, but it could be zero. The advertisement goes into the MAXX business, in the paint business itself.

A
Amit Murarka
analyst

Right. And lastly, like on the Toshali acquisition, is there any update?

P
Prashant Seth
executive

So at Toshali agreement, we are still in dialogue with the state government and the owner regarding transfer of mining lease. So the state government also had concerns with respect to that giving Toshali on our confirmation on buying out Toshali, so we are actually working at that. And -- because, one, we are also simultaneously working at an arrangement for a long-term tie-up for the limestone, pending the allocation of the mining lease. So government is also considering that in case the transfer of mining lease may take some time, they can assure a long-term supply of limestone and whether the company would be in a position to consider that as an alternate option for the interim period until the limestone is -- mines are transferred.

A
Amit Murarka
analyst

Sure. And just the last question on employee cost. There was some increase this quarter, it looks like some incentives and some employee bonus...

A
Ajay Saraogi
executive

So the employee cost increases there because we have a variable pay option, and it had a component on a -- so since the targeted profit is being achieved, so there is an incremental provision for the variable pay, which has to be paid.

A
Amit Murarka
analyst

Okay. Okay. And the fourth quarter, will we see a similar number?

A
Ajay Saraogi
executive

Fourth quarter number could be marginally lower because this has an impact of the previous -- additional impact is there in this quarter.

Operator

The next question is from the line of Jyoti Gupta from Nirmal Bang. .

J
Jyoti Gupta
analyst

Good set of numbers. I would like to understand, given the capacity breakup between gray and white Cement, can I assume that we did 1,200 EBITDA on gray cement and roughly around 2,400 EBITDA on white cement?

A
Ajay Saraogi
executive

Pardon, we are not really sharing the EBITDA numbers separately for both the businesses. You may derive at whatever basis you're calculating.

J
Jyoti Gupta
analyst

Okay. So basically, based on my calculation, I believe that is where the number should be close to. And second, on the expansion line. Effectively, my gross numbers are quite close to, but in terms of -- where do you see the volume growth going forward in terms of the entire overall India cement growth since every company is expanding the capacity, do you think the demand going forward will commensurate the existing and upcoming capacities?

A
Ajay Saraogi
executive

So see, the demand is also increasing. If you look at the base has gone, the incremental effective capacity increase is not more than the demand. So we really see that whatever is the incremental capacity that will get absorbed.

J
Jyoti Gupta
analyst

Okay. Okay. So what kind of pace are you assuming for demand, all India demand? Or maybe in the markets where you are actually operating?

A
Ajay Saraogi
executive

So we see a demand -- a growth in demand of anything between 7% to 9%.

J
Jyoti Gupta
analyst

And that 7% to 9% specific in the market where Shree, UltraTech are also very, very active and the capacities are going to be significant, additions are going to be there. You assume, you believe that it is self-consuming, the market will consume all the upcoming capacity, so which means it is...

A
Ajay Saraogi
executive

So far, it has happened and we feel that, yes, it would be.

J
Jyoti Gupta
analyst

Okay. Sir, on your fuel front, I would like to understand -- I mean, since there's been a significant drop in your fuel costs, I would also like to understand, will this remain consistent? If that is so, then possibly, I can expect a 1,200 EBITDA in the fourth quarter, around the same levels. I mean, not a same at 1,300, but maybe around 1,200 levels is what I anticipate in the fourth quarter. So is -- will there be any changes in your fuel?

A
Ajay Saraogi
executive

See, again, you said fuel and EBITDA. EBITDA is a combination not only -- it's not related to the fuel price position. Definitely, there will be some. We feel that, as I said earlier, we already have some inventory, which is at par with the fuel cost of Q3 average, so we don't see a major drop in that count. And EBITDA is a combination of other costs as well as the -- and the main is the realization. So as of now, the realization in the current month is marginally lower than the exit of the third quarter. So we would be definitely -- we are definitely -- I mean, not that -- we do expect some price increase to happen, but if it does not happen, then it would be difficult to comment on anything on the EBITDA per ton.

J
Jyoti Gupta
analyst

Okay. All right. Okay. And the other thing I would like to understand in terms of the WHRS, you will be adding additional 50 megawatts in the next 2 years, which is by FY '26?

A
Ajay Saraogi
executive

So WHRS actually we shall be adding incremental of 43 megawatts. 18 megawatts is being added, is under already trial runs at Muddapur. And 25 megawatts of WHRS is being add -- is proposed along with the new expansion at Panna.

Operator

[Operator Instructions] The next question is from the line of Navin Sahadeo from ICICI Securities.

N
Navin Sahadeo
analyst

Heartiest congratulations, sir, for such a strong set of numbers. In my estimates, you could certainly be higher than industry leader, UltraTech cement, for the quarter. My question was I understand pricing is dynamic. And on the cost front, we have wasted recovery as the benefit coming in the next quarter. Apart from that, are there any more levers for -- from a cost rationalization or a revenue optimization point of view, which will ensure that we keep up with this lead over the industry?

A
Ajay Saraogi
executive

So see, WHRS -- but we will not see the benefit. The benefit will not be at full for this quarter. We would be seeing the full benefit of WHRS from -- in quarter, Q1 of FY '25 because it is under commissioning and by the time it stabilizes and other things, it may take some time. On the other costs, yes, there could be on fuel, as I said, though we are trying to -- there could be some fuel and other costs of around INR 30, INR 40 a ton incremental saving could be there. Beyond that, we do not see any savings immediately in this quarter. Regarding the pricing, yes, though we are trying to work out on the other mix; at the same time, we need to also see our new markets of Eastern UP, which is necessary to be developed, look into the Prayagraj expansion, which would get sometime in the -- by end of second quarter of FY '25.

N
Navin Sahadeo
analyst

Understood. Helpful. So the other question was on the overseas operations, so we were just simply doing difference between the consolidated and stand-alone EBITDA. And you also said that paint was a loss of around INR 5 crores roughly as you said for the quarter. But yet, the difference is a decent INR 16.5 crores or nearly INR 17 crores. So I wanted to understand, is there anything similar to the previous quarter, which -- wherein, there was a one-off export opportunity of clinker to Australia for like -- or this is more sustainable sort of recovery or margins in the UAE?

A
Ajay Saraogi
executive

So Fujairah operations, as we told earlier, we have been trying to work out on our turnaround plan for the Fujairah operations. The operations are also adversely affected by a very high fuel cost and because of high logistic costs. So things are becoming normal over there. There has been a reduction in the fuel cost. We are also working out on the other value-added products, which have also now giving us some positive revenue. So in this quarter, Fujairah also, we have earned -- there is an EBITDA similar to -- somewhat similar to Q2. Q2, the EBITDA for Fujairah was about INR 25 crores. And in this, it is INR 21 crores.

N
Navin Sahadeo
analyst

And sir, how sustainable is -- this is my broader question because historically, as you said, I mean, multiple...

A
Ajay Saraogi
executive

So again, we had some good -- I mean, some one-off volumes also. But I think as we are seeing Fujairah, anything annually we should be able to -- though we are trying to work out on a plan in Africa and -- which may take some time. But there are other restrictions or other cost increase and restrictions, which are being imposed in UAE, but on a consistent basis, if things remain normal, we do see that we could -- not at this pace, but definitely on an average around -- anything between INR 30 crores to INR 40 crores annually could be sustained at Fujairah.

N
Navin Sahadeo
analyst

Great. That will be a much better scenario versus the past. And just one last question, freight cost per ton sequentially increased, I think, of course, there was a busy season, surcharge on the rail, I assume that. But is there more to it in the sense that since we are looking to probably develop those eastern UP market, as you said, or maybe Bihar because I mean we are eventually going to set up there. So is there an increase in lead distance? And is this number then...

A
Ajay Saraogi
executive

Yes, so there is an increase in the lead distance also, so one is a busy freight. There is an increase in lead distance. Lead distance increases on account of servicing new markets. There is a change -- there's a mix change. The south where the lead is still lower, the volume was marginally lower over there, so all these factors were there. So these are the two major factors. And one other thing is that there has been some inventory increase there, which has -- which is again, an increment adjustment, which is, we get on a particular day, some freight gets shown as an expenditure and is part of the stock valuation. So -- but if you look at the major two comps, one is the busy period. I mean because of railway freight and there's an increase in the lead distance.

Operator

[Operator Instructions] The next question is from the line of Sumangal Nevatia from Kotak Securities.

S
Sumangal Nevatia
analyst

Sir, first question is, is it possible to get the breakup of this INR 2,800 crores in terms of grinding, clinker, WHRS, some sort of breakup if you can share?

A
Ajay Saraogi
executive

So see, the breakup of INR 2,800 crores, I mean, if you look at the grinding stations, at the -- in Bihar and the expansions, which we have to do could be around INR 600 crores to INR 650 crores, and INR 2,200 crores would be the amount, which will be spent at Panna including WHRS.

S
Sumangal Nevatia
analyst

Okay. Understood. And sir, since we're entering Bihar, I mean, what sort of -- I mean, what's the strategy, I mean, in terms of new catchment area versus further increasing our penetration in existing? So does Bihar will be servicing the entire new market?

A
Ajay Saraogi
executive

So Bihar would be a new market for us. So presently, we are not selling in Bihar. So as a new catchment when we set up Panna, so there was a similar -- there were new markets in MP and UP, which we have -- which we are capturing. So we will have a similar plan to enter into Bihar and the new markets, we would be planning to consolidate on new markets.

S
Sumangal Nevatia
analyst

Okay. And sir, this announcement was kind of anticipated since a while. I mean, now can we assume, I mean, in future, you kind of reach out as far as Panna expansion is concerned and future expansion will be either in some other location or a greenfield plant?

A
Ajay Saraogi
executive

So as I said earlier, see, we have 2, 3 options and we would -- looking to the market scenario, we have an option for an expansion in the North at Jaisalmer and we have an option for an expansion in the South, where we are already operating at a very high level of capacity utilization. And also option for Line-3 at Panna and if something works out for Toshali, that's an option. So these are the four options, which we have. And I think by the time we are able to have -- we are in advanced stage for completing Panna Line-2, we should -- we would have a clear plan where we need to go next.

S
Sumangal Nevatia
analyst

Understood. And just one last clarification, sir. This year, you said around 16.5 million ton volumes for gray. Out of this, how much would have been contributed from Panna? I mean, just trying to understand overall average year, what utilization would be operating at.

A
Ajay Saraogi
executive

So Panna is already -- would be operating at 75%, 80% capacity utilization, 75%. So definitely, 75% capacity utilization would be at Panna.

Operator

[Operator Instructions] The next question is from the line of Rajesh Kumar Ravi from HDFC Securities.

R
Rajesh Ravi
analyst

Am I audible?

A
Ajay Saraogi
executive

Yes.

R
Rajesh Ravi
analyst

Congrats, sir, on a great set of numbers. I have a few questions. First on the expansions, these grinding expansions, which you are doing in brownfield. So are they actually are adding some balancing equipment? Or will it be a separate grinding mill, which is getting ready?

A
Ajay Saraogi
executive

No, no separate grinding unit. It is in the existing unit itself, some upgradation. I mean, we have a scope in the design and followed it by adding additional packing system and...

R
Rajesh Ravi
analyst

Okay. And the CapEx number, which you mentioned for FY '25, if I heard it correct, INR 2,400 crores, and next year then it will be around INR 1,500 crores?

A
Ajay Saraogi
executive

Yes, yes. So INR 2,200 crores, which was set for FY '25 included the CapEx for the expansion at Prayagraj. So it included the Prayagraj grinding unit, which will get commissioned in FY '25. It included some out of the CapEx of spillover INR 200 crores out of the current year. The current year plan was INR 1,400 crores and we are doing -- we should close around INR 1,200 crores. Some normal CapEx and about INR 1,200 crores, INR 1,300 crores of the new expansion expenditure.

R
Rajesh Ravi
analyst

And on the operating metrics, you've posted strong numbers, but I see a few things. Your nontrade mix has improved -- trade mix has come off quarter on quarter from 69% to 64%. And -- our panels have suggested central market where I assume relatively flat beyond, too. And also, there is a large inventory -- negative inventory adjust -- negative inventory numbers, just how the adjustment, so can you explain what was this? Where do you -- how you will be benefited on the realization despite loss on nontrade sales and this large inventory number?

A
Ajay Saraogi
executive

So number one, we would like to emphasize that we have been able to maintain our market share and trade across all markets. We have not lost the market share, when we talk about in terms of the trade sale. In fact, in the new markets, I mean -- in fact, in the new markets, we have even further improved upon our trade share over there. If -- yes, the nontrade volumes percentage has grown because if the incremental demand and the opportunity is coming from nontrade, to get the incremental volume, you will have to sell in the nontrade segment.

R
Rajesh Ravi
analyst

Correct. So what was that if you're selling more in nontrade, you were gaining on volumes...

Operator

I'm sorry to interrupt sir, your audio is not clear right now.

A
Ajay Saraogi
executive

No actually, Rajesh, in this quarter, the pricing was better than the previous quarter. That's why we have seen improvement in the realization.

R
Rajesh Ravi
analyst

And sir, this inventory adjustment number, could you explain that?

A
Ajay Saraogi
executive

Because stock mainly -- see last quarter since our maintenance was high as a normal because Q2, normally, we have the maintenance, so clinker stock had reduced. Now we have come to the optimum level again in this quarter.

R
Rajesh Ravi
analyst

Okay. So nothing one-off?

A
Ajay Saraogi
executive

Yes, yes, nothing one-off.

R
Rajesh Ravi
analyst

So last question, WHRS, you are doing for 3.3 million ton, you have mentioned around 25 million tons WHRS. So is it some surplus because usually, we used to think of 3 million ton odd would suffice at max 15-megawatt of WHRS.

A
Ajay Saraogi
executive

No, no, it's not that. We already are having a 22-megawatt of WHRS in the Line-1 at Panna.

R
Rajesh Ravi
analyst

Correct. But optimal utilization is possible with...

A
Ajay Saraogi
executive

Your voice is not clear, actually.

R
Rajesh Ravi
analyst

Sorry. I'm saying with 3.3 million tons, was it the optimal decision you can do, all this 25-megawatt is possible?

A
Ajay Saraogi
executive

Yes, yes, it is possible.

Operator

[Operator Instructions] The next question is from the line of Prateek from Jefferies.

P
Prateek Kumar
analyst

Most of my questions are answered. Sir, first question is on green energy mix, just to get a number. While you talked about megawatt installations both in solar and WHR, so 50% of FY '24 YTD is expected to touch what number, like maybe by FY '26? Like some of the peers I've talked about 60% number by FY '26.

P
Prashant Seth
executive

So if you look at the green power, presently, we are at 50%. I think by FY '26, we should be closer to about 60%.

P
Prateek Kumar
analyst

And one of your erstwhile presentation talks about 75% as like probably a more...

P
Prashant Seth
executive

That is the target for 2030.

A
Ajay Saraogi
executive

That's the target for 2030.

P
Prateek Kumar
analyst

Right. On realizations, so this INR 26 crores, which were booked in stand-alone business for paint, was this a similar number last quarter also because your total 9 months, you said 100...

P
Prashant Seth
executive

Last quarter was INR 19 crores.

P
Prateek Kumar
analyst

INR 19 crores. So there's a small benefit on reported blended realizations in white cement because of paint also, but not so material?

P
Prashant Seth
executive

Yes.

P
Prateek Kumar
analyst

Sure. And sir, with regard -- to this last question on freight, you talked about some increase in lead distance because you're like building new markets. So this 1,290 number, is this like expected to like sort of sustain or like there is some one-off, particularly in this quarter?

A
Ajay Saraogi
executive

So I think quarter-on-quarter, it should be sustained because, one, the railways surcharge would be same, similar. So it would not have any impact. The lead distance also, I think, there should not be any major increase in the lead distance. So I think quarter-on-quarter, it should be flattish.

P
Prateek Kumar
analyst

It would remain higher, like last year, we were 1,220 on an annualized basis. It will probably remain at this closer to 1,300 going forward?

A
Ajay Saraogi
executive

The same as this quarter, I'm saying.

Operator

The next question is from the line of Ritesh Shah from Investec.

R
Ritesh Shah
analyst

A couple of questions. Sir, first is on how one should look into the cement clinker ratio from now to FY '26, looking at the capacity? I think, you've indicated a number of 66% for the quarter.

A
Ajay Saraogi
executive

Yes, so we could see anything ranging between 0.62 to 0.64.

R
Ritesh Shah
analyst

Okay. And sir, what gives us confidence over here? Do we already have tie-ups or [ flash lag? ] Or is it like the deals are already in proximity, that gives us this confidence?

A
Ajay Saraogi
executive

Yes, yes. So see, that is already a tie-up for all the existing grinding locations, which will also include the brownfield expansions at Hamirpur and Prayagraj. So only the long-term tie-up, which is under negotiation has to be done once you finalize the location for the Bihar unit.

R
Ritesh Shah
analyst

Okay. That helps. Sir, are we looking at LC3? A few of the companies have indicated that they are ready for commercialization. Any plans on calcined clay as a product?

A
Ajay Saraogi
executive

Yes, yes. So we are also -- actually, we have done the a trial production. And also we are definitely looking at and see how we can have that as a commercial option, so we are there already at it.

R
Ritesh Shah
analyst

Sir, any time lines?

A
Ajay Saraogi
executive

So time line, one, you can again do it, but we had to see, unless we have a proper commercial model. So that has to be seen on the demand-supply on the -- time lines will depend on that.

R
Ritesh Shah
analyst

Okay. But if the product is ready for us, so hypothetically...

A
Ajay Saraogi
executive

Yes, the product is more or less ready for us. We've done the testing.

R
Ritesh Shah
analyst

This is helpful. And sir, last question. Any specific reason to go for Bihar? Why not any other states?

A
Ajay Saraogi
executive

That's a natural growth. That's a natural once we go from East, so that's a natural market. We have no other options from Panna to go to. That's the natural growth market area.

Operator

Ladies and gentlemen, on account of time constraint, this will be the last question for today, which is from the line of Sonal Bansal from Eureka Stock and Sharebroking Services Limited.

U
Unknown Analyst

Congratulations, sir, for the fab results.

A
Ajay Saraogi
executive

Thank you.

U
Unknown Analyst

I would like to know how do you see the price movement in North and Central region in the next 2 quarters?

A
Ajay Saraogi
executive

So actually, we are expecting that some price increase should take place in this quarter. So if it takes place in this quarter, it will be good. Otherwise, the first quarter may be difficult because of the elections and other things.

Operator

As that was the last question, I would now hand over the conference to Mr. Vaibhav Agarwal for his closing comments. Over to you, sir.

V
Vaibhav Agarwal
analyst

Yes. Thank you on behalf of PhillipCapital India Private Limited, I would like to find the management of J.K. Cement for the call and many thanks to the participants joining the call. Thank you very much, sir. You may now conclude the call. Thank you.

A
Ajay Saraogi
executive

Thank you everyone for joining. Thank you. And if you have any other questions, yes, you can contact us directly.