Terawulf Inc
NASDAQ:WULF
US |
Fubotv Inc
NYSE:FUBO
|
Media
|
|
US |
Bank of America Corp
NYSE:BAC
|
Banking
|
|
US |
Palantir Technologies Inc
NYSE:PLTR
|
Technology
|
|
US |
C
|
C3.ai Inc
NYSE:AI
|
Technology
|
US |
Uber Technologies Inc
NYSE:UBER
|
Road & Rail
|
|
CN |
NIO Inc
NYSE:NIO
|
Automobiles
|
|
US |
Fluor Corp
NYSE:FLR
|
Construction
|
|
US |
Jacobs Engineering Group Inc
NYSE:J
|
Professional Services
|
|
US |
TopBuild Corp
NYSE:BLD
|
Consumer products
|
|
US |
Abbott Laboratories
NYSE:ABT
|
Health Care
|
|
US |
Chevron Corp
NYSE:CVX
|
Energy
|
|
US |
Occidental Petroleum Corp
NYSE:OXY
|
Energy
|
|
US |
Matrix Service Co
NASDAQ:MTRX
|
Construction
|
|
US |
Automatic Data Processing Inc
NASDAQ:ADP
|
Technology
|
|
US |
Qualcomm Inc
NASDAQ:QCOM
|
Semiconductors
|
|
US |
Ambarella Inc
NASDAQ:AMBA
|
Semiconductors
|
Utilize notes to systematically review your investment decisions. By reflecting on past outcomes, you can discern effective strategies and identify those that underperformed. This continuous feedback loop enables you to adapt and refine your approach, optimizing for future success.
Each note serves as a learning point, offering insights into your decision-making processes. Over time, you'll accumulate a personalized database of knowledge, enhancing your ability to make informed decisions quickly and effectively.
With a comprehensive record of your investment history at your fingertips, you can compare current opportunities against past experiences. This not only bolsters your confidence but also ensures that each decision is grounded in a well-documented rationale.
Do you really want to delete this note?
This action cannot be undone.
52 Week Range |
0.94
6.89
|
Price Target |
|
We'll email you a reminder when the closing price reaches USD.
Choose the stock you wish to monitor with a price alert.
Fubotv Inc
NYSE:FUBO
|
US | |
Bank of America Corp
NYSE:BAC
|
US | |
Palantir Technologies Inc
NYSE:PLTR
|
US | |
C
|
C3.ai Inc
NYSE:AI
|
US |
Uber Technologies Inc
NYSE:UBER
|
US | |
NIO Inc
NYSE:NIO
|
CN | |
Fluor Corp
NYSE:FLR
|
US | |
Jacobs Engineering Group Inc
NYSE:J
|
US | |
TopBuild Corp
NYSE:BLD
|
US | |
Abbott Laboratories
NYSE:ABT
|
US | |
Chevron Corp
NYSE:CVX
|
US | |
Occidental Petroleum Corp
NYSE:OXY
|
US | |
Matrix Service Co
NASDAQ:MTRX
|
US | |
Automatic Data Processing Inc
NASDAQ:ADP
|
US | |
Qualcomm Inc
NASDAQ:QCOM
|
US | |
Ambarella Inc
NASDAQ:AMBA
|
US |
This alert will be permanently deleted.
Earnings Call Analysis
Q4-2023 Analysis
Terawulf Inc
TeraWulf has demonstrated significant growth, surpassing strategic objectives and showcasing its ability to navigate the cryptocurrency mining industry. The company specializes in Bitcoin mining, utilizing zero carbon energy sources across its facilities, therefore emphasizing a commitment to sustainability. Notable achievements include increased mining activities with a combined self-mining hash rate of 8 exahash per second, driven by the deployment of approximately 50,000 miners, which signifies a remarkable threefold increase from the previous year. This accelerated growth has led TeraWulf to produce 971 Bitcoin in Q4 2023, culminating in a yearly total of 3,407 Bitcoin, despite facing obstacles such as record-high network difficulty.
The company has maintained a strong financial position, with a quarter-over-quarter GAAP revenue increase of 23%, reaching over $23 million in the fourth quarter of 2023. This performance has resulted in a total value of $34.8 million from self-mined Bitcoins and an adjusted EBITDA of $16.4 million. Yearly GAAP revenue growth was an impressive 361%, underpinned by efficient operational and cost management strategies that led to a gross profit leap from $4 million to $41.9 million. Moreover, TeraWulf's average power cost per Bitcoin mined, including Bitcoin from Nautilus, was effectively managed, contributing to an anticipated power cost of $0.035 per kilowatt hour for the upcoming year. These results illustrate how the company's calculated strategies and operational efficiency are driving profitability, even as industry-wide margins are compressed.
TeraWulf has demonstrated financial prudence by significantly reducing its debt and enhancing liquidity. The company repaid $40 million of principal within four months, bringing the debt balance to $106 million, and increased liquidity to nearly $56 million. A further anticipated debt paydown of roughly $30 million is expected in early April, signaling a robust approach to financial stewardship and a commitment to maintaining a strong balance sheet. Additionally, the strategic management of the company's ATM facility, leading to accretive share sales, has contributed to voluntary debt repayment and infrastructure investment, without excessively diluting shareholder value.
TeraWulf is strategically positioned for expansion, aiming for a 300-megawatt infrastructure capacity by the end of 2024 and exploring diversification beyond Bitcoin mining to optimize its extensive infrastructure utilization. A highlight of such innovation is 'Wulf compute,' an internal hub focusing on leveraging the company's digital infrastructure for applications such as AI. This move, complemented by the establishment of a dedicated power block and the company's scalable energy infrastructure, showcases its versatility and foresight in adapting to evolving technology and changing market demands.
TeraWulf prides itself on being among the lowest cost producers in the Bitcoin mining industry. By executing a 'mine and monetize' strategy, the company efficiently liquidates mined Bitcoin to cover operational and capital expenses, rather than depending on dilutive shareholder funding. This strategy, coupled with cost transparency and continuous efforts to optimize operations, contributes to its reputation as an industry leader in cost efficiency. As the Bitcoin 'halving' event approaches, TeraWulf is poised to further solidify its position as the most cost-effective producer, which is expected to bolster its competitive edge and investor appeal.
Greetings, and welcome to the TeraWulf's 2023 Fourth Quarter and Full Year Earnings Call. [Operator Instructions] As a reminder, this conference is being recorded.
It is now my pleasure to introduce your host, Mr. Jason Assad, TeraWulf's Director of Corporate Communications. Thank you, Mr. Assad, you may begin.
Thank you, operator. Good afternoon, and welcome to TeraWulf's earnings call. With me today are Chairman and Chief Executive Officer, Paul Prager; and our Chief Financial Officer, Patrick Fleury.
Before we get started, I'd like to remind everyone that our prepared remarks may contain forward-looking statements, which are subject to risks and uncertainties, and we may make additional forward-looking statements during the Q&A session of the call. These forward-looking statements are subject to risks and uncertainties and actual results may differ materially. When used in this call, the words anticipate, could, enable, estimate, intend, expect, believe, potential, will, should, project and similar expressions as they relate to TeraWulf are such forward-looking statements. Investors are cautioned that forward-looking statements involve risks and uncertainties, which may cause actual results to differ materially from those anticipated by TeraWulf at this time. In addition, other risks are more fully described in TeraWulf's public filings with the U.S. Securities and Exchange Commission, which may be viewed at sec.gov and in the Investors section of our corporate website at terawulf.com.
Finally, please note that on today's call, we'll refer to certain non-GAAP financial measures. Please refer to our company's periodic reports on Form 10-K and 10-Q and on our website for a full reconciliation of these non-GAAP performance measures to the most comparable GAAP financial measures.
We will begin today's call with prepared remarks from Paul and Patrick, then we'll proceed to Q&A. Now it's my pleasure to turn the call over to TeraWulf's CEO, Paul Prager. Paul?
Thank you, Jason, and good afternoon, everyone. We appreciate your attendance today as we discuss our fourth quarter and full year 2023 financial results. This past year has been marked by significant growth and achievements for TeraWulf, showcasing rapid organic growth at our existing sites, substantial debt repayment and enhanced liquidity. We've not only met but surpassed several strategic objectives, and I'm excited to share these accomplishments with you.
Firstly, TeraWulf specializes in Bitcoin mining, leveraging zero carbon energy resources at our two top-tier data centers, our wholly owned and operated Lake Mariner facility in Upstate New York, sourcing 93% zero carbon grid power and the Nautilus Cryptomine facility in Pennsylvania, a joint venture with Talen entirely powered by nuclear energy.
As of the end of February, these two industrial mining facilities achieved a combined self-mining hash rate of 8 exahash per second, facilitated by approximately 50,000 deployed miners representing a more than threefold increase from last year. Despite challenges posed by record high network difficulty, we produced 971 Bitcoin during the fourth quarter alone, contributing to a total of 3,407 Bitcoin mined throughout 2023. I'd like to take a moment to put these figures in context.
During the fourth quarter, we produced 971 bitcoin, resulting in a total value of $34.8 million and an adjusted EBITDA of $16.4 million. Utilizing Bloomberg consensus annual adjusted EBITDA estimates for 2024 of $96 million and our current enterprise value of approximately $590 million. This would suggest we are trading at a multiple of 6x. In comparison, some of our competitors are trading at multiples as high as 16x with an average [ peer ] group of 9x.
We recognize that market value serves as an important measure of our progress over time. Our steadfast commitment lies in consistently delivering exponential growth in hash rate. With unparalleled access to low-cost zero-carbon power at our existing facilities, the importance of infrastructure scalability cannot be overstated. It forms the very bedrock of our strategic approach. Scalability ensures not only stability and control, but also confers significant long-term cost advantages. It empowers us to optimize operational efficiency, strategically expand our operations and enhance profitability. This unwavering focus on profitability assumes heightened significance as we approach the impending having event.
We are committed to achieving a 300-megawatt infrastructure capacity in operation by the end of 2024. And with plans to further expand to 550 megawatts of deployed infrastructure by 2025. This expansion will result in approximately 28 exahash assuming the current generation of miners. Additionally, we are actively exploring options in addition to Bitcoin mining to optimize the utilization of our extensive proprietary infrastructure to unlock additional value. To this end, in 2023, we established [ Wulf compute ] as our internal innovation hub focusing on research, development and deploying our extensive and scalable digital infrastructure. Following a successful pilot phase involving a compact NVIDIA GPU system to enhance generative AI and large language model applications.
We took the step of dedicating a 2-megawatt power block at our Lake Mariner facility. With over 300 megawatts of available infrastructure at Lake Mariner, strategically positioned to cater to data center requirements. This initial allocation is part of a broader high-performance computing initiative and serves to provide diversification of the company's revenue streams.
Investments in cloud infrastructure by prominent hyperscalers, such as Microsoft, Amazon, Meta, Oracle and Google have experienced impressive average annual growth, exceeding 30% over the past 5 years. In 2022 alone, these entities collectively spent $158 billion. The demanding specifications of hyperscalers necessitates sites capable of accommodating several hundred megawatts to sustain multiple data center buildings ranging from 40 to 80 megawatts each. These locations must also offer direct access to extensive contiguous land suitable for constructing data centers, power banks, parking facilities, loading zones and ancillary buildings, access to water to run in the most efficient manner and critically, must adhere to a sustainable ESG framework. TeraWulf is uniquely positioned to fulfill all these requirements. Our large scale energy infrastructure coupled with access to zero carbon, low-cost power is invaluable for meeting the growing demand from bitcoin mining and AI applications. our infrastructure phase of pivotal role in enabling this demand growth.
Turning now to our financial position. We remain steadfast in our strategy to leverage our resilient low-cost infrastructure to maximize profits, repay debt and return value to shareholders. Our performance in the fourth quarter highlights TeraWulf's consistent achievement of industry-leading profitability. We estimate that our cost to mine a Bitcoin is among the lowest compared to other publicly listed bitcoin mining companies at approximately $25,000 per bitcoin before the having and $37,000 after the having. As the having approaches in a month's time, we anticipate that our position as the lowest cost producer of Bitcoin will only be further strengthened underscoring the value of our vertically integrated and sustainable business model.
We've also made significant strides in debt repayment and liquidity. We repaid $40 million of principal in the last four months, bringing our debt balance to $106 million, with liquidity of almost $56 million as at the end of February, and substantial projected free cash flow for the first quarter. We have the ability to reduce that even further with an anticipated debt paydown of roughly $30 million in early April which will bring the debt balance to $76 million.
Allow me to address the matter of dilution. Throughout the fiscal year 2023, we exercised prudent management of our ATM facility, strategically selling approximately 58 million shares at an average price of $2.05 per share, resulting in a discernibly accretive impact. From the proceeds, approximately $18 million was used for a voluntary debt repayment. The remaining funds were directed towards essential minor and infrastructure capital expenditures with an additional $20 million retained as surplus liquidity on our balance sheet to navigate the having in a few weeks. While I am fully cognizant of the concerns surrounding dilution, both out of my fiduciary responsibilities to you and as a leading and significant shareholder, I urge you to consider the substantial and accretive impact of these allocated funds.
Looking forward, we have far more flexibility in sourcing capital, given our current cash flow generation. For instance, in February, we produced 364 bitcoin at an average cost of approximately $26,000 for Bitcoin, providing total value of $17.8 million with $8.4 million flowing directly to the bottom line. That's significant. As of April, we expect our net debt will stand at approximately $55 million, nearly 50% lower than at the beginning of the year, placing the company in its strongest position ever.
Finally, I'd like to take a moment to thank the incredible team at TeraWulf for their dedication, innovation and hard work, which have been critical in achieving the milestones I've highlighted today. It is your effort that drives our success, and I'm proud to lead such an outstanding group of professionals.
Now I'll hand the call over to our CFO, Patrick Fleury, for a detailed financial review.
Thank you, Paul. During 2023 and continuing into the first quarter of 2024, the company accomplished several notable steps to achieve positive cash flows from operations. Number one, it amended its debt to remove [ six ] principal amortization and utilize the free cash flow sweep to rapidly reduce our debt balance. Number two, commenced mining operations at Nautilus. Number three, commence mining operations at Buildings 2 and 3 at Lake Mariner. And Number four, we paid over $40 million of debt and position the company with over $20 million of [indiscernible] liquidity to navigate the upcoming having.
While my remarks for year-end would typically focus solely on annual results and year-over-year financial comparisons, our fiscal year 2022 results are less relevant given we only recently achieved targeted run rate operations of 5.5 exahash in the middle of 2023. And therefore, in my remarks, I will focus on fourth quarter versus third quarter results in addition to year-over-year comparisons. All references to 2024 guidance in my remarks, can be found in our March 6, 2024 press release.
Before diving into the numbers, a quick reminder, there is a key difference between our GAAP financials and the monthly operating reports in 2024 guidance. As a result of our 25% ownership in Nautilus, the revenue, cost of revenue, operating expenses, depreciation and amortization at Nautilus are not consolidated into our GAAP financial statements. Instead, the financial impact of the Nautilus joint venture is reflected in the equity and net income or loss of investee net of tax line item on the GAAP income statement.
In the fourth quarter of 2023, we mined 608 Bitcoin at Lake Mariner, and our net share of mined Bitcoin at Nautilus was 364 Bitcoin. For a total of 972 Bitcoin or about 10.5 Bitcoin per day or a 2% decline over the 994 bitcoin mined in third quarter 2023. For fiscal year 2023, we mined 2,168 Bitcoin at Lake Mariner and our net share of mined Bitcoin at Nautilus was 1,239 Bitcoin for a total of 3,407 Bitcoin, inclusive of Bitcoin received from hosting profit share.
Our GAAP revenues also saw outstanding growth of 23% quarter-over-quarter, reaching $23.3 million in 4Q '23 from $19 million in 3Q '23. Our value per bitcoin self mine this quarter, a non-GAAP metric that includes Bitcoin mined at Nautilus, averaged $35,836 per bitcoin for a total of $34.8 million as detailed and defined in our monthly operating reports and press releases. Our GAAP revenues year-over-year increased 361% from $15 million in 2022 to $69 million in 2023.
Looking now at our gross profit. We saw an increase of 34% quarter-over-quarter from $10.6 million in 3Q '23 to $14.3 million in 4Q '23. Our total power cost per Bitcoin mined, a non-GAAP metric that includes Bitcoin mined at Nautilus, with [ 10,178 ] in 4Q '23 compared to [ 9,322 ] in 3Q '23. Gross profit for the year increased from $4 million in 2022 to $41.9 million in 2023. As a reminder, in our GAAP financials, unlike our monthly operating reports, the company records proceeds received and to be received for demand response programs as a reduction in cost of revenue. These expected proceeds totaled $1 million in 4Q '23 and $3.5 million in 2023. As disclosed in our 2024 guidance, we expect to achieve an average power cost, including demand response revenues and the impact of Nautilus' $0.02 power contract of [ $0.035 ] per kilowatt hour in 2024. For 2023, we achieved an average power cost of [ $0.032 ] per kilowatt hour.
Operating expenses increased slightly quarter-over-quarter from $1.2 million in 3Q '23 to $1.7 million in 4Q '23. Annual operating expenses also increased slightly year-over-year from $3.3 million in 2022 to $4.9 million in 2023. These quarterly and annual increases were due to increases in repair costs property insurance and staffing costs as we scaled operations at Lake Mariner.
As disclosed in our 2024 guidance, we expect $13.5 million of operating expenses in 2024 which includes operating expenses at Nautilus. Of the $13.5 million total anticipated for 2024, approximately 50% is expected to be incurred at Lake Mariner and 50% at Nautilus. SG&A expenses decreased quarter-over-quarter from $10.3 million in 3Q '23 to $8.8 million in 4Q '23. For the year-over-year period, SG&A expenses increased slightly from $36 million to $37 million. However, this increase was primarily due to an increase in number one, noncash stock compensation due related party for achieving a performance milestone; and number two, an increase in stock-based comp. Adjusting for these items, SG&A decreased 13% year-over-year from $32.3 million in 2022 to $28.2 million in 2023. As disclosed in our 2024 guidance, we anticipate approximately $27.5 million of SG&A in 2024.
Depreciation remained stable quarter-over-quarter at $8.2 million in 3Q '23 and $8.3 million in 4Q '23. Year-over-year depreciation increased materially from $6.7 million in 2022 to $28.4 million in 2023, which was the result of an increase in mining capacity and infrastructure placed into service in 2023 at Lake Mariner. During 2023, we recorded a loss on disposal of property, plant and equipment of $1.2 million related to disposals of miners at Lake Mariner.
GAAP interest expense in 4Q '23 and fiscal year 2023 was $9.3 million and $34.8 million, respectively, which includes cash interest expense and amortization of debt issuance costs and debt discount related to the term loan financing. However, cash interest paid during the 3 and 12 months ended December 31, 2023, was $4 million and $19.6 million, respectively. Notably, cash interest paid during the 12-month period actually includes 14 months of interest payments due to accrued interest for the fourth quarter of 2022 paid in January 2023 and 11 months of interest payments made in 2023 as interest is paid monthly in [ years ] as of May 2023.
In 4Q '23, we reported $3.3 million in equity and net income of investee net of tax as compared to $0.9 million in 3Q '23. For the full year 2023, we reported a $9.3 million loss in equity of investee net of tax as compared to a $15.7 million loss in 2022. These amounts represent TeraWulf's proportional share of income or losses of the Nautilus joint venture. For the 2023 and 2022 fiscal years, these amounts include impairment losses of $13.6 million and $11.5 million, respectively, related to the distribution of miners from Nautilus to the company, whereby the miners were marked to fair value from book value on the date distributed.
Our GAAP net loss for the fourth quarter was $10.8 million compared to a net loss of $19.4 million in 3Q '23. Our GAAP net loss for 2023 was $74.5 million compared to a net loss of $91.6 million in 2022. Our non-GAAP adjusted EBITDA for 4Q '23 was $16.4 million, an 81% improvement over $9 million in 3Q '23 and 2023 adjusted EBITDA was $30.7 million.
Turning our attention now to the balance sheet. As of December 31, we held $54 million in cash with total assets amounting to $378 million and total liabilities of $155 million. With the recent achievement of our targeted 210 megawatts and 8 exahash of operating capacity in first quarter '24, we anticipate a consistent and rapid reduction in our long-term debt with an approximate $30 million payment anticipated the first week of April. Furthermore, in fiscal year 2023, we reduced our net working capital, excluding the current portion of long-term debt from approximately negative $60 million at December 31, 2022, to positive $31 million as of December 31, 2023.
As I've mentioned in previous quarters, you may note from our balance sheet that we do not hold our Bitcoin in treasury, but rather execute and monetize what we mine strategy, whereby we liquidate Bitcoin to pay operational expenses and capital expenses and overhead as needed rather than dilute shareholders to fund these costs. We mine Bitcoin more efficiently and profitably than most of our peers with the intent to return that profit to shareholders in the form of debt paydown, organic growth and potential future dividends and share buybacks. We are among the lowest marginal cost producers in the industry and provide full cost transparency and guidance to our shareholders as any reputable and leading commodity business does.
As a former institutional investor myself, I believe the simple fact that certain of our peers, the largest public Bitcoin mining companies and self-declared industry leaders do not is an insult to investors and research analysts. One can only logically presume that their lack of transparency is by design, knowing that their cost figures is adequately disclosed may materially impact investor sentiment. With the April having fast approaching and all of us about to lay our cards on the table for all to see, I'm very confident in the hand TeraWulf is holding. We've long suggested that not all exahash was equal and that we anticipate a likely changing of the guard post having and upon second quarter 2024 earnings results being reported. As disclosed in our 2024 guidance, we expect to achieve a marginal cost of production, which includes every single cost in the company of approximately $36,000 per bitcoin post having.
In conclusion, I hope that during this call today, our financial objectives were reiterated and made clear and simple: maximize profits, repay debt and return value to shareholders while providing investors access through transparency and accountability. With that, I'll pass it back to Paul and look forward to answering your questions.
[Operator Instructions] Our first question comes from the line of Mike Grondahl with Northland Securities.
Two questions. I'll ask both of them upfront. But the first one, as it relates to your HPC initiative, what are the two assets that have the most value for you guys as you're going out to the market there. And related to that, how do you value those assets? And what's kind of the time line to harness that value?
And then secondly, any thoughts on kind of the elevated short interest in the stock?
So sorry for the -- we've got a management team all over the country at different conferences and a lot going on today. So I'll start, Paul, but feel free to jump in. But Mike, with regard to HPC and AI, look, I think size and scale and economies of scale matter. And so there's very few sites left in the United States that have over 50 megawatts. We have 300 megawatts at Lake Mariner, but also have access to land, abundant and cheap and largely zero carbon power and water. Remember, we're at the site of a retired coal plant that used to pull hundreds of thousands of gallons of water from the lake. And so I think being able to check the box on all of those items is very rare, and it positions you for value creation, similar to our partner talent and what they just realized at their site. So I'll pause there. Paul, do you want to add anything to that?
No, I think you got it. I would want to underscore how important ESG is into these hyperscalers. So land, power, cost of power and that green focus is fundamentally critical to these guys. I think one other element here is how quickly they could get active. And I think our sites already years earlier than maybe some of the competitors that are currently in development, looking for their connections so I think the proximity or the immediacy of their availability for a hyperscaler is very compelling to them as well.
And then, Mike, just to address your second question, it's not lost on us. I see short reports weekly. So just to give you an idea, we have about 47 million shares sold short today. And as you know, insiders and management, we have among the largest among all the Bitcoin miners insider ownership, which is why we're so careful and prudent with the ATM. And we have, I think, around 300 million common shares outstanding. Of that amount, just broadly speaking, probably [ 100 to 150 ] is held by what I would deem insiders. So with 47 million shares short, I mean you're talking about 25-plus percent of the actual float that's out there on the stock. And I can actually see -- I can't see by name because the short reports don't say that. But I can see that, for example, one fund is short close to 70% of that $47 million. And so I can tell you, I think that's a crazy position because like I said, I think we're about to change the guard in the space where I think profitability and valuation based on profitability will really matter as opposed to previously, these companies have been valued on revenue and exahash which just doesn't make any sense to me. I mean I've seen that in the '90s in telecom and in the 2000s in power and none of that ended well. So I think it's something we're focused on. A lot of that short interest or the remaining, call it around, I don't know, 10 million, 15 million shares is actually, I think, part of our lender group and that will unwind itself in the first quarter because they own warrants in the company. Some of them have sort of taken that market risk out by shorting the stock. And when we deliver in those warrant shares, that cover will -- or that short interest will be covered and go away. So look, I think we're excited about that because I think there's a real potential short squeeze opportunity as we continue to put up good numbers.
And then maybe just a quick follow-up. On the 300 megawatts in the land and the water, have you attempted to put a rough valuation on that? What you think that's worth in today's market?
So not yet, Mike. But look, I think we're going to -- this stuff takes time. I think what I will do quickly is just lay out for you the space really is characterized by a barbell approach right now. And so what I mean by that is on the right hand, you have stocks like the [ Magnificent 7 ] that are in effectively an arms race to secure capacity and those deals look very different. Those can be 5-, 10-, 15-, 20-year type deals where you're building according to their specs and that is very financeable, right, because you've got a long-term contract and less capital intensive because we're building the infrastructure and they're bringing the gut. So they're owning the GPUs.
And so the other end of that spectrum, the other end of the barbell is a lot of newly formed AI, HPC companies that are funded by Venture Capitalists or otherwise that are very legitimate but have sort of $50 million on balance sheet and want to enter into anywhere from 6 months to 2-year deals, and then they're relying on you to fund the infrastructure and the gut, so [ by ] the GPU. So that's a lot more capital intensive because those deals are much harder to finance, right? Because it's not just a legitimate financing party saying, "Hey, we'll finance 200, 300 basis points behind the corporate credit risk. These are start-up companies. So that's kind of the barbell approach, and we are working both sides of that barbell. But one side is higher credit risk quality, startup-type companies that's more capital intensive. And then the other side is longer-term contracts much more financeable less capital intensive, if that makes sense.
Our next question comes from the line of Lucas Pipes with B. Riley Securities.
Thank you very much, operator, and good afternoon, everyone. This is actually [ Peter Sevelin ] asking question on behalf of Lucas Pipes. And my first one, so I believe you targeted 300 megawatts by the end of '24 and 550 by the end of '25 for your total self-mining footprint. And the question is, could the capacity potentially be utilized for HPC or Cloud services?
Yes. [indiscernible] it's Patrick speaking. So yes, I think as Paul and I are saying in our remarks, we are an infrastructure company, and we are blessed in that we are long infrastructure when there's a mass scramble for infrastructure now among both Bitcoin miners and hyperscalers, right? So I think we, given our insider ownership, we are focused on the highest and best return on capital. And if that means Bitcoin miners, like Paul mentioned in his remarks, we're trading at 6x, but some of our peers are trading at 14x, 15x, 16x while data center companies out there trade at 25x EBITDA. So I can assure you that we are, as one of the highest insider ownership companies in the space, we are very focused on creating long-term value, and we'll skate to where the puck is.
And maybe it's early to talk about this, but would any potential HPC capacity come at Lake Mariner or Nautilus or both? What's the preference here?
Yes. So the Nautilus facility is strictly, for us, is strictly Bitcoin mining. And then the HPC AI capacity would come at Lake Mariner. So as Paul said in his remarks, we have -- and you'll see in our investor deck, updated investor deck that we just posted today, we have 300 open megawatts at Lake Mariner and that will be put to the highest and best value accretive function.
And are you having any maybe discussions today with potential tenants? And just how would you frame up the demand?
Yes. Look, I think, Paul, I'll answer that, but please jump in. But look, I think as we've mentioned to you publicly, we've been running a 2-megawatt pilot since the fourth quarter at Lake Mariner. We have had an adviser retained on the HPC AI front also since the fourth quarter. So we have been in significant discussions for quite some time. and these things take time. And like I said, there's not one solution that fits all, there's co-location, there's co-location and funding of all the GPUs for sort of smaller scale and then there's much larger-scale companies that are focused on very significant size where, again, like I said, we're not taking on the GPU technology risk because we're not buying the GPUs.
So that's -- again, I think we're hopeful that as we move through 2024, we'll be able to talk in more granularity about it, but it is something that our management team has been very focused on for quite some time. And we look forward to kind of rolling that out. Paul, is there anything you want to add to that?
Only in response to your question about demand, I would say demand is very, very significant and timely. I think a lot of these folks are trying to get as big as they can as fast as they can. As I said in my remarks, I think we're one of the 10 most premier sites in the country when it comes to size, energy, availability, energy cost, access to water and of course, their unique ESG qualification. So I think I'm very comfortable representing that our site is meaningful demand and we, as management, need to do our job and look at the highest value use for our property and energy.
And maybe my last one about M&A opportunities that might involve [ post housing ]. So what's your thoughts on this space? Are you looking at something into more [indiscernible] current sites if opportunity [ goes ]?
Sure. Paul, do you want to take that? Or do you want to take it?
Yes. Listen, we're trying very hard in the space. It's full of volatility and misinformation to really focus on execution. If we just stay the course here and build out our existing facilities, we're going to be busy for quite some time. And that is the primary focus. Of course, we are familiar with energy infrastructure, unlike almost any other of our peers in this group. And so we will be opportunistic if we find something that is compelling and has to remain true to [ a thesis ], which is zero carbon mining. But right now, we're really focused on executing our business plan, keeping our heads down, doing our job and trying to make as much money as we can for our investors.
Our next question comes from the line of Bill Papanastasiou with Stifel.
Yes. I want to lead with a question on the term loan. Obviously, management has taken very significant strides of paying down the debt. And I'm curious to hear what the appetite at this point is to refinance, just given the more favorable outlook and the guidance that management has provided to get to 28.3 exahash?
So look, I think given where economics are right now, the biggest asset of this company is the cash flow generating ability, and we're generating a lot of cash. I mean, we're mining 12 to 13 Bitcoin a day right now. And our cost is, call it, $25,000, $26,000. So you can do the math, but it's $500,000 to $600,000 a day kind of depending on exactly where Bitcoin price is because it's been pretty volatile here. As Paul said in his remarks just now, I mean we are kind of head down focused on maximizing cash flow and taking the debt down and ultimately taking it out completely. So as we move forward in time, yes, could we pursue something on a refinancing front? yes, maybe. But I think if we can keep harvesting cash flow and Bitcoin stays here, I think we'll pay off the debt naturally by the sort of end of third quarter, fourth quarter. So that's, I think, more of our focus, Bill, is not necessarily refinancing, it's eliminating.
And then for my second final question, as [ reported ] in the preliminary earnings, the company had just under $50 million of cash on hand at the end of February. Can you provide some color in terms of what -- whether there's any outstanding payments due on recent equipment purchases or the build-out of building #4? Just trying to get some color on that.
So I think the way we think about it, to answer, I'm going to answer the three different parts of that question. So I think about just what I would call true excess liquidity on the balance sheet of about $20 million. So that's kind of what we're holding to kind of navigate through the having and make sure that the company has an adequate liquidity to address any volatility over the next couple of months. So that's number one.
Number two, part of that question. We do not have any contracts currently, any liabilities for miners, for example, and then that sort of folds into the third question. So Building 4 at Lake Mariner, which is scheduled to be completed in June, that is substantially funded from an infrastructure perspective. We have not announced a minor purchase for that yet. Hence, my sort of answer to your previous question of we don't have any liabilities currently, but we have not announced how we're going to populate that building with miners. Does that all make sense?
Sorry, I should have been more specific. I did mean for the infrastructure part instead of the mining part. So that helps to clear everything up. That's all the questions from me.
Our next question comes from the line of Josh Siegler with Cantor Fitzgerald.
Really appreciate all the transparency you provided around a bunch of KPIs here. My first question is really around financing for infrastructure. I'm curious if you can dig a little bit deeper into the financing options that would exist for infrastructure committed to HPC compared to infrastructure committed for Bitcoin mining?
So look, I'm not going to answer that in great detail, but I will, at some point, further down the road this year. But I think the short answer to that question is on the HPC AI and again, I'm going to go back to the barbell approach because I think that's really important to think about. But the financing is abundant and available for any type of large cap customer, right? Because that's a 5-, 10-, 15-, 20-year type contract. And so that build cost for us. So if you think about 300 megawatts, it's anywhere, and these are wide ranges because this moves around so bear with me, but anywhere from kind of $3 million a megawatt to $7 million. So those are big numbers. I know if you multiply that by $300 million, that's like $1 billion to $2 billion, right? And so what I would say, though, is if you have an underlying contract, long-term contract with an A-rated counterparty, you can finance 70% to 90% of that cost.
Now that's one part of the barbell. The other part of the barbell, which is the smaller, more capital intensive. So I'll give you an example, like if we were to go out and build the infrastructure and by all the GPUs for our 2-megawatt pilot, that would be probably around $20 million to $25 million per megawatt right? Because we're doing everything. We're buying the -- we're building the infrastructure and then we're owning and building the GPUs. And so those contracts tend to be more like, like I said, sort of roughly 2-year type contracts, and the payback on that is, generally speaking, over two years. But the counterparties there, just again, because they're smaller companies are putting up kind of like 25% of the contract value day one. And so those, as you can imagine, are harder to finance. That being said, we are looking at doing, say, like 10 megawatts of those types of deals and then doing it with the same sort of financial counterparty that would finance the sort of other side of the barbell of like an A-rated company because when you put a bunch of -- it's like [ CMBS ], right, when you put a bunch of companies together, you're decreasing the risk. So there is that possibility. It's just more complicated. So as you can see, like both sides just take time. And I know you all cover other folks in the space and I think others have reported kind of the same. But does that help address your question?
Yes, Absolutely it does. Really appreciate the color there and definitely interested to see what you're seeing as you progress in building out that infrastructure and moving forward.
For my second question, I just wanted to flip over to the fundamentals in the Bitcoin mining side. So your cost of power for the year came in, it performed much better than our expectations and better than your initial guidance, I believe Obviously, the mix is shifting more towards Lake Mariner, but can you give us any insight as to how you expect that to trend for '24?
Yes, sure. I mean I think you'll see we just put out an updated investor deck that everyone can grab off our website. But look, we're guiding again to that sort of blended [ $0.035 ]. I would rather keep that guidance and beat with all of you guys. As you said, we delivered [ $0.032 ] for 2023. So look, I think we're pretty confident and there's a slide in our investor deck where you can see historical average price at Lake Mariner and also forward pricing. So we're pretty confident that we'll be in that same range, Josh, going forward. And it's just -- it's -- as you know, and as we're kind of showing quarter-over-quarter, other than a couple of weeks in the winter and a couple of weeks in the summer, it is a beautiful place to mine Bitcoin.
I was actually -- [ Nazer Khan ] and I were talking the other day, and we learned a stat that I actually had not heard, but think since temperatures have been record keeping temperatures have been kept at the Lake Mariner site, I think, since like the 1970s. There's not one day in the history over that roughly 55-year period where temperatures have been over 100 degrees at our site. So it is a perfect place with an abundant zero carbon source of hydroelectricity just down the road to mine Bitcoin.
Our next question is from [ James Rowland with Memestock Watch ].
So I run a forecasting service on miners, all cryptominers in fact, and doing so much digging on Wulf over the past year or so. I made my own personal decision to have my biggest miner position in Wulf as opposed to many others. And on my website, [ Memestock Watch ] I offer analysis, fundamental analysis, [indiscernible] analysis, nightly on all miners. And my miner of pick has always been Wulf. So before I even ask anything, I just wanted to say that this call has been wonderful to listen to. I think the company sounds like they're in great hands.
Now my question to you guys is, what would you say to investors looking to invest in the crypto miner space and looking for a specific cryptominer that the [indiscernible] can perform well post having? Obviously, there are a lot of doubts and questions raised about that. So what would you say to someone that's looking to invest in a cryptominer? Why should they take Wulf over others?
First of all, I appreciate your investment in the company. This is Paul. I can try and answer that.
Listen, I mentioned in my prepared remarks that we are aware that we trade at a much lower multiple than many in our peer group, significantly lower. And it's a question we often ask ourselves why? And I think I'd want to respond to you in a couple of different ways on this. I think, generally, our debt is misunderstood. I've repeatedly been out there suggesting it's a nonevent. We have successfully managed it. We paid it down just as we promised we would. But I do believe that the perception that there is debt out there remains a reason why some people haven't invested yet.
But I hope they consider that we've repaid $40 million of principal over the last 4 months. We're poised to make another substantial payment of approximately $30 million in the coming weeks. And this has effectively halved our debt load in less than 6 months. our very robust performance in the fourth quarter underscores our ability to generate considerable free cash flow, and we have excess liquidity of approximately $20 million on the balance sheet. So I think we have very strong financial footing, and we're highly confident in our ability to manage the remaining debt balance. So I hope future investors would look at that, I think misunderstood negative is really a positive.
Two, I think we've suffered from a misperception regarding dilution. I have always committed to shareholders that we're going to be deliberate about using the ATM to fund accretive growth objectives. We have rapidly scaled the last several quarters. We're now in a position where accretive investment in our equipment and infrastructure is producing very significant cash flow. And beyond this, I think our dilution tends to be on the very low end of all our peers, one of which right now is implementing a staggering $1.5 billion ATM facility. That would never happen on my watch. The majority of our larger peers seem to me to be far more lifestyle companies for management at the expense of shareholders. But I am troubled by our lower multiple, it doesn't sit well with me. And I recognize that it will always be a scorecard for future investors.
When people look at the facts, I hope they understand that TeraWulf is the best, if not the only investment out there because of three primary things: one, profitability. Our cost to mine Bitcoin is among the lowest compared to other publicly listed mining companies, and we are approximately $25,000 per bitcoin before the having and $37,000 after having. And if you listen to what Patrick said, he said, that includes every single possible cost in the company. There's a reason why many of our competitors don't disclose their power costs or their SG&A fully loaded, but we do. And the way to think about that today as if Bitcoin is at $65,000. The company is making almost $500,000 a day on our current 12-bit coin a day production. That's real money.
The second reason is alignment. I'm one of TeraWulf's largest shareholders. Our management team is fully invested. So we and you, we share the same goals. We're entirely aligned. My management team is more heavily invested in the company than any of our peers. We win, if you win. We only win if you win.
And lastly, scalability. The scalability of our digital infrastructure is peerless. It's the backbone of our strategy. It empowers us to optimize efficiency scale operations and drive profitability. Again, as Patrick mentioned earlier, I think the Bitcoin mining valuations are changing and changing fast, and profitability should be the story. When I look at some of our larger peers, I'm reminded of the old [indiscernible]. How do you make a small fortune in Bitcoin mining? And I think for many of our competitors, the answer is start with a big fortune. TeraWulf is an entirely different animal. We make a meaningful profit mining now and we will continue to do so after the happening. That's why people should invest in Wulf, and I'm really grateful for your question and for your investment in our company.
Our next question comes from the line of [ Joe Flynn with Compass Point Research ].
I had a question related to paying down the debt post having. With regard to the $76 million, how should we think about the balance between ultimately investing growth to get to 300 megawatts or paying down debt? And with that, you said [ by ] 2024 or by 2025. But ultimately, do you expect to delever before ultimately getting the 300 megawatts?
So look, I didn't primary objective was all of our free cash flow right now. And I just want to make sure we're distinguishing because we've talked a lot about this today. But the company is generating, like Paul said. I mean, we are generating $500,000 to $600,000 of free cash flow a day, okay? So when we talk about debt pay down and the debt paydown that's coming, call it, the first week of April, that is all of it from free cash flow generation and profitability. And so we will continue to be very profitable post having assuming bitcoin price around where we are today and we'll continue to generate a lot of free cash flow. And so our goal is to extinguish the debt with free cash flow. So once that occurs, then I think we can make a decision on do we use free cash flow to grow accretively? Do we use it for dividends? Do we use it for buybacks? What do we use it for? But right now, the focus is debt repayment.
Great. That's helpful. And then in regards to the purchasing miners, can you maybe talk about the current market appetite for miners, like are there still opportunities to lock in kind of the lower prices that we've seen the $14 to $15 or $15 to $16 [ jewels ] per [ terahash ], just like anything you could add there?
Yes, sure. Look, I think there's obviously a lot of different -- or certainly more so than the last cycle, right? There's a lot of different OEM options. So look, we would expect as Bitcoin price continues to move up, that pricing for miners does move up, but I think there's a lot of opportunity still remaining out there to get miners at a very attractive price, like around the level that you just referenced. So yes, I think that's not a near-term concern of ours.
At this time, I would like to pass the floor back over to Mr. Paul Prager for closing remarks.
I want to thank you again for joining us today. In summary, I believe TeraWulf distinguishes itself through its best-in-class assets, lowest unit economics, ability to scale owned infrastructure and alignment with investors. As a significant investor in TeraWulf myself, I can assure you that we are well aware of and will only pursue the very best interest of the company and its shareholders.
Thank you for your trust and support as we strive to build the leading bitcoin mining company.
Thank you. This concludes today's teleconference. You may disconnect your lines at this time. Thank you for your participation.