Thank you for standing by, and welcome to the Sandfire Resources March 2024 Quarterly Report Call. [Operator Instructions]

I would now like to hand the conference over to Mr. Brendan Harris, Chief Executive Officer and Managing Director. Please go ahead.

B
Brendan Harris
executive

Hello, and good morning. I'd like to acknowledge the traditional custodians of the land on which we stand the Whadjuk people of the Noongar Nation as well as the First Nations peoples of the lands on which Sandfire conducts its business. We pay our respects to their elders and leaders, past, present and emerging.

My name is Brendan Harris, CEO of Sandfire. I'd like to welcome you to our quarterly call. I'm joined here in Perth by our colleagues, Megan Jansen, Jason Grace, Richard Homes, Cath Bozanich, Victoria Twiss and Scott Browne.

Starting with safety. We've seen our total recordable injury frequency increased in the quarter at 1.9 and a rise in high potential incidents, all of which emphasizes the work we have to do to protect the health and well-being of our people. Nothing is more important, and we can always do better.

Sustainability must permeate everything we do from the way we ensure our people are safe to the work we do with our local communities to create lasting, positive outcomes. In March, we held our first committee meetings with the Yugunga-Nya under our new framework agreement. The meetings were held on country in Meekatharra where I was joined by Cath, our CSO. This was another important step towards rebuilding our relationship with the Yugunga-Nya and ensuring the ongoing protection of cultural heritage at DeGrussa. We're taking a long-term view, and we'll stay the course and do what's right.

I also understand that the external investigation commissioned by Sandfire to better understand the process failures that led to the disturbance of the artefact scatters and taking time before we notify the Yugunga-Nya will be completed shortly. The findings of this investigation will be made available to the Yugunga-Nya before being shared with government, industry and other stakeholders.

Turning to our operating performance. Importantly, we have retained FY '24 group copper equivalent production guidance of 135,000 tonnes and we've tweaked broader financial guidance. We've flagged the combined $18 million reduction in underlying operating and exploration expenditure in FY '24 and a $23 million increase in noncash D&A.

Beyond the P&L, we've reduced group CapEx guidance by $18 million, which largely reflects a shift of expenditure at Motheo into FY '25 and some lumpy sustaining items that matter in Q4.

To be clear, the budget for the rapid and low-cost A4 expansion project remains unchanged at $397 million and first ore is on track to be delivered to the centralized processing facility in the first quarter of FY '25. This leaves us well positioned to deliver more than 50% growth in copper equivalent production from our continuing operations across the 2 years to the end of FY '25.

For the quarter itself, we delivered copper equivalent production of 33,100 tonnes, an increase of 2% from the prior quarter as contained copper production increased by 11% and contained zinc production declined by 23%. This, in turn, underpins sales revenue of approximately $206 million and underlying operations EBITDA of approximately $93 million for underlying group EBITDA of approximately $76 million.

Our net debt increased again, albeit temporarily by $5 million to $481 million. As the Motheo concentrate shipments slipped to the back end of March and cash proceeds of $25 million were only received on the 2nd of April. That's not to say, Motheo isn't going well as it arguably couldn't be doing better. Having operated at an annualized 4.7 million tonne rate across Q3 and a 6 million tonne rate across the 20 days to 26 April or a 5.6 million tonne rate if they're targeted, 93% availability is taken into account. If sustained, this level of performance would significantly derisk our forward plans for Motheo and potentially establish the foundation for incrementally stronger output with any excess capacity likely to be utilized to process low-grade stocks in the short to medium term.

At MATSA, our underground mines also operated at a record 4.7 million tonne per annum rate across the quarter, further illustrating the increasing resilience of our mine plan, recognizing we lost access to high-grade polymetallic ore in the Aguas Teñidas Western extension as a result of a blockage in our paste fill delivery infrastructure. We produced 14,200 tonnes of contained copper at MATSA in Q3, a 4% improvement quarter-on-quarter and 18,500 tonnes of contained zinc for copper equivalent production of 21,400 tonnes. The 23% reduction in contained zinc production is directly linked to our inability to access the Western extension and our decision to refocus activity on the Aguas Teñidas stockwork zone, a copper-only area within the orebody.

With our paste fill line into the Western extension now reestablished, we expect to recover the circa 4,000 tonnes shortfall in zinc production in Q4.

Moving on from production. Our underlying operating costs at MATSA have remained relatively stable at $72 per tonne of ore processed as the operation continued to mitigate the effects of inflation and further benefited from positive foreign exchange rate movements and lower power prices. Persistently good performance on this front has seen FY '24 guidance for MATSA's underlying mine operating costs lowered by around 5% to $74 per tonne of ore processed.

At a strategic level, we are continuing to refine our multiyear exploration plan that's designed to materially increase our reserves, and we're not standing still. We're currently drill testing our highest priority target zone, which lies around 350 meters down plunge of the Masa 2 orebody at Magdalena where prior EM surveys identified prospective conductors.

With that, let's quickly turn back to our growth engine, Motheo. Motheo's underlying operating costs declined to $36 per tonne of ore processed as we ramped up processing activities and underlying operating cost guidance for Motheo remains unchanged at $169 million in FY '24, a great outcome for a new mine.

Our exploration team has also completed another drilling program at A4 to test the dip and strike extensions to no mineralization and final assays are awaited. Exploration drilling has also recommenced the T3 and is testing for additional mineralization in the footwall zone of the open pit.

And finally, at A1, we have confirmed a maiden 5.6 million tonne resource located 20 kilometers to the northeast of our processing facility. We see real potential for this to grow as we increase drillhole density and test the open extent of the orebody.

As I've said in the past, there is so much to learn about the Kalahari Copper Belt, and we've only just scratched the surface.

On to the United States, where we recently welcomed the Montana Supreme Court's decision to reinstate the mine operating permit for the Black Butte Copper Project. Our current drilling program is designed to test the extent of the high-grade Johnny Lee Lower copper zone as we seek to enhance the project's economics ahead of a final investment decision.

So in conclusion, while nothing is ever perfect, we're going pretty well. The medium and long-term fundamentals for copper keep getting better, and we're well positioned to deliver growth into an increasingly tight market and pay down debt. Let's go to questions. Thank you.

Operator

[Operator Instructions] The first question comes from Ben Lyons from Jarden.

B
Ben Lyons
analyst

I might start at Motheo, please. Obviously, acknowledging the very strong performance of the processing plant as it ramps up to that 5.2 million tonnes of capacity, possibly presenting some challenges for the mining sequence though, if the plant is running so well. So my question really relates to the performance of the pre-strip at A4 and specifically, that $18 million deferral of CapEx into fiscal '25. Whether this conceptually puts you a little bit behind plan, particularly if the processing plant continues to run at such elevated levels?

B
Brendan Harris
executive

Look, Ben, that's an excellent question, and thank you. And I'll pass to Jason in a moment, just maybe a couple of overriding remarks.

Whilst we have deferred some of that spend and so, of course, that does mean that elements are tracking later into the early part of next year. It's not a material difference. It's really -- it is just a short-term timing differential.

But before I pass to Jason, I do want to pick up on the point you've made, if you like, pull the thread. You'll notice in some of the comments in quarterly, we've been really clear to highlight that if we are able to maintain these high rates of throughput and please hold us to account on 5.2 million tonnes for now. But if we can continue to deliver at the recent higher rates, we've really stressed that one shouldn't assume a linear progression in terms of throughput at constant grade to give a linear increase in contained metal production because over the next 1 to 2 years, as has always been envisaged, if we run at a higher rate, arguably, we'll be drawing down on low-grade stocks.

Over the medium term, and you're probably talking out into the '26, '27 time horizon, if we can run at higher rates, the mine plan will evolve, we'll have more flexibility to bring more of, call it, the run of mine grade material in, which, of course, would give a more meaningful benefit. So that's a really good story, but it does highlight that we don't want, and we've said this before, people to get ahead of themselves in the short to medium term. But Jason, maybe just for you to call off some of that in.

J
Jason Grace
executive

Yes, I think Brendan has covered it very well, Ben. And if you look at it, we have been looking at the mill performance since commissioning of the 3.2 million tonne per annum plant. And as Brendan said, we are laser focused on making sure that we can achieve 5.2 million tonne per annum rate on a sustainable basis.

However, we have seen that there is a potential for upside. And we've made sure, particularly in developing and optimizing the mine plan post feasibility study that we've got a mine plan that is enabled to be able to support a higher processing rate. And Brendan touched on that in the early years that we'll be through drilling down low-grade stockpiles.

And as we progress, particularly through the mine plan at T3 and become more ore balanced and also start to get into the main part of the A4 orebody, we'll actually start to see the full benefit of potential increase in processing rates sort of coming in post those early years to give us the full benefit and be able to process higher average grade over that.

B
Brendan Harris
executive

So I think for me, Ben, that's probably coming into the role over a year or so ago. That's what really pleased me the most was to see the thinking that are being put to bear not only to establish a pathway to a rapid and low-cost expansion to 5.2 million tonnes. The fact that there were clear areas over scope that would potentially provide more capacity in due course, but also the work that's being done around the mine plan to really think about the way in which we can set ourselves up for success, should we be successful in, if you like, unleashing additional capacity. And so I think that's really where we're at. But hopefully, that gives you a good feel for it. But as I said, a really good question.

B
Ben Lyons
analyst

Maybe just a second one on MATSA, please. And again, I have to acknowledge the very strong mining performance and have to acknowledge the really granular level of guidance that you provide as an organization, which is really helpful from our perspective. And obviously, you've had some operating challenges at MATSA during the quarter with the paste filling, et cetera.

So it feels a little disingenuous to pick out a specific number of your guidance stack. But in the context of all of that and the fact that it looks like you've actually put a bit of material on the ROM in front of the plant during the last quarter, one area where you don't appear on track to meet your fiscal '24 objectives is the increase in copper recoveries from the poly line and I think there was a specific 3% target that was called out. Recoveries during the quarter were only 69%, below guidance of 73%. So with the benefit of a bit more material in front of the plant, are you still aspiring to that kind of 73% recovery level? Can you see some potential improvements as we go into fiscal '25?

B
Brendan Harris
executive

Yes. Look, again, I'll throw to Jason, but often so mining was easy, everyone could do it. And I guess the frustrating thing is -- we know with MATSA, we've been, to some extent, working really hard to build the credibility of the underground given some perceptions out there that it's geotechnically more challenging than other mines, which we don't believe is necessarily the case. It should be fairly classic multi-mine underground polymetallic open stope paste fill operation. It has its challenges.

The irony here is we're running, as you said, at record rates of throughput and we've had an issue with our paste fill line. So very, very frustrating. As we've highlighted, we're going to capture -- recapture that zinc metal production in the fourth quarter. The team is running really hard to do everything they can to get that number.

But you're right. And we've also made this point very clearly in the quarterly. We make no bones about the fact that value is in recovery. It's -- I sort of think about it, to some extent, it's free money and we haven't hit the targets. And largely, it's related to the fact that we haven't had the stability in our plan and our blends because of some of this resequencing. But maybe I'll throw to Jason to dig into that. But it's a real focus, Ben, and we're not giving up on it in any respect.

J
Jason Grace
executive

Yes. Look, once again, very good question. Look, you do know -- if we look at copper recovery there, particularly, with copper only sitting at about 83% for the quarter, down from 85% in Q1 and Q2, I'm comfortable that we're definitely moving in the right direction and heading towards our guidance of 86%.

I'm sure you understand when you do a complete about-face on a mine plan very quickly, it throws a lot of the operating strategies and particularly throws the balance out in the mill and certainly, the team we're dealing with that through the bulk of Q3 and particularly early in Q3.

Copper poly, right, we were focusing on -- given that we have reduced our overall processing rate, we were trying to make sure that we were maintaining zinc recoveries and some of the ore that we were mining there, it's probably not the quality that we expected to see during that period of time. I expect we'll start to see those copper poly recoveries start to trend back up, but I still think we've got a way to go before we're consistently achieving guidance around 73% there.

B
Brendan Harris
executive

I think, Jason, it's fair to say talking with Rob Scargill last night in Spain, we are seeing that higher grade zinc material coming into the ROM pad and into the processing facility on a daily basis now.

J
Jason Grace
executive

Correct. Absolutely. We've started -- we're seeing that since really mid-month -- mid- to early months.

B
Brendan Harris
executive

Yes, once we reestablished the paste fill line got back in there. Anything else, Ben?

B
Ben Lyons
analyst

No, I've had my time, so I'll pass it on.

Operator

Your next question comes from Kaan Peker from RBC.

K
Kaan Peker
analyst

Two questions from me, both on Motheo. Just congrats on the maiden resource at A1. It's good grade, shallow, truckable distance. So how are you thinking about how A1 fits into the current approach at Motheo? And I assume there's some net test work that's been done with regards to recovery and how it fits in with the plant -- existing plant? I'll circle back with a second.

B
Brendan Harris
executive

Ye. Thanks, Kaan. Appreciate the question. And I'll pass to Richard in a second, but perhaps a couple of comments I'd make is, this is a maiden inferred resource. If I talk to A4, the initial or maiden resource at A4 was 6.5 million tonnes at 1.5% copper, ultimately grew to 9.8 million tonnes at 1.4%. And we're continuing to test open extents of that deposit itself. So we certainly don't have any certainty of the directional trend of the resource at A1, but we're left optimistic that there's still more for us to do there. And I think that's really important because there is obviously a distance between the processing facility and A1 and that deposit needs to carry that infrastructure investment.

Obviously, there are other targets you can see in our presentation that are in and around that area. And so the more infrastructure, i.e., particularly [indiscernible] that we establish start to provide more pathways to ultimately, if you like, commercialize any future discoveries as well.

I think the key thing, though, if you look at the size of this orebody and you think about the grade, it's very early days, but it would be logical that you want to bleed it in to the operation over time because that's going to be the economic way to do it. And so it's not large scale unless, of course, the resource grows.

But maybe firstly, Richard, anything on the resource that you wanted to add? And then maybe, Jason, in terms of the operating approach.

R
Richard Holmes
executive

Yes. Just your question is on [ Motheo ] testing. We've done some basic testing there, and it looks like -- the performance looks very similar to T3. And obviously, we've tested it with the intent of replicating the T3 process sheet. So all looks very good.

I suppose where it sits in the development [indiscernible]. Look, we've got a fair amount of work to do at A1 yet, we're going to compare study shortly. And then I think we'll see some significant drill programs. And as Brendan said, we hope to increase the size of the resource. It's open down dip and along strike and there's still quite a lot of work to do to understand the foreclosures, which often produce higher grade. So a further way to go, lots of exciting work to come.

B
Brendan Harris
executive

And Jason, maybe just on the configuration. It's very early days. So just...

J
Jason Grace
executive

Absolutely. It is early days. And given our current understanding, I see A1 is analogous to A4 in terms of how it looks operationally. So if we look at A4, A4 on its own would be unable to fill that mill at 5.2 million tonne per annum processing rate. So conceptually, and Richard touched on the studies, conceptually, we're already thinking about the optimum timing there, which would be to bring this online, right? Certainly before the end of my life at T3 and A4 and to be able to use the blend from the 3 and particularly use that baseload of ore supply from T3 to underpin A1 and A4.

B
Brendan Harris
executive

And I think it's the combination of the resource work that's ongoing, but also the clarification and confirmation of the ability to run the processing facility at faster rate. We touched on it earlier that clearly, that provides some upside in the future to metal production. But the critical thing I think a lot about is risk. To me, what it does is it significantly derisks our forward base plan because, in effect, you've got higher capacity to run your run of mine grade material through the mill, which, again, in mining because we all know that we tend to have interruptions from time to time or unforeseen events. This just starts to -- the combination of these things just increasingly derisks how we think about the forward plan, how we think about the value of Motheo. Kaan, next question?

K
Kaan Peker
analyst

Surely. And I suppose it's a great lead in. But Motheo beyond 5.2 million tonnes, I know it's early days, you mentioned it. But over the medium term, if we sort of get to that 5.6 million tonnes per annum, is there likely to be a trade-off on expected recoveries, excluding the impact of [ FID growth ]?

B
Brendan Harris
executive

Look, in short, where, obviously, the biggest issue on recovery has actually been the instability that we've had as we've been commissioning the ball mill, working through the misalignment issue that we've now resolved. That's really what impacts your recovery.

In the last 20 days, not only have we seen the throughput increase, we're seeing recoveries back over 90%. So we don't think there's a trade-off in terms of ultimate recovery. We're still really not even testing the full potential of the plant. So that's where once we get steady state, the team really gets down to the hard nitty gritty of incremental improvement around those recoveries.

Operator

Your next question comes from Rahul Anand from Morgan Stanley.

R
Rahul Anand
analyst

I think we've touched a bit upon the operational side. I wanted to perhaps ask a financial one. You've revised the D&A budgets for both Motheo and MATSA. I guess my first question relates to that. What's driving that? Is that a movement in the asset value? Or is that you're drawing more or quicker and that's basically driving that? But then more importantly for MATSA, am I correct in understanding that the depreciable base from a tax purpose remains unchanged at the asset despite this accounting change that you've indicated?

B
Brendan Harris
executive

Yes. Thanks. Good question, Rahul. So a couple of points I'll pass to Megan. You'll see MATSA is running at a record 4.7 million tonne per annum rate. Differential is incremental, and D&A has a direct link to units of production. And of course, Motheo is running marginally ahead of plan, but there's more work with Motheo. So maybe Megan, I'll pass to you to just explore that.

M
Megan Jansen
executive

Yes. Thanks, Brendan, and thanks for the question, Rahul. Maybe to start with Motheo. And really, that represents the majority of that $23 million increase in the noncash G&A expense. Twofold in terms of contributing factors there. Part of it is having finalized that very detailed fixed asset register for the Motheo assets following achieving commercial production at the start of the financial year. The team has been through that very detailed review, including audit of that register. And with that, and that all now being systematized, comes a more sort of specific understanding of what that charge for the year is expected to look like. So that's the first component.

The second component at Motheo, as Brendan touched on, is really a significant part of that D&A charge is linked to our units of production. So as our ore mine tonnes increased for a component of the D&A charge, that will align with that. So higher throughput, we'll see a slight and sort of aligned increase in the D&A charge. So that's on the Motheo side.

The majority of the increase in MATSA and again, quite modest to MATSA, is really related to higher throughput and the higher rates that we're seeing coming out of the mine with a significant component of massive depreciation charges also linked to that [indiscernible] basis.

To your question on the MATSA tax base. You're correct, no change to the tax base. This is all noncash accounting changes at this time. On a -- from a tax perspective, as we work closer to the end of the year, we true up over the tax accounting and look at our elections on MATSA, some specific nuances in Spanish taxes around the way we claim that tax depreciation base and certain elections that we need to make. And that's something we'll look to refine by the time we get to the end of the financial year.

R
Rahul Anand
analyst

Got it. So I guess, re MATSA, just a quick follow-up. I mean, if your accounting depreciation is accelerating on account of units of production, fair to assume that the Spanish slide, you are still using the cost base of the original asset, right? You're not able to -- and is the rate of depreciation of that cost base mandated by the government? Or is that mandated by units of production as well?

M
Megan Jansen
executive

So there's no change that -- we're not talking about a change to the actual tax base at this stage. The statutory rate in Spain, there's no change to that. What we need to work through is some elections we have around. It's called depreciation at wheels. It does get quite technical and probably not something to sort of bolt down on too much in this call. But we have some flex in the extent of our reduction that we need to review each year. And that's the process the team will look to finalize before the end of the financial year roll in.

R
Rahul Anand
analyst

Okay. Perfect. That's very comprehensive. Look, my second one is on Black Butte. Obviously, some interesting hits there and potentially could develop into a platform, I guess, moving forward. But my question is more related to, I guess, funding it and the balance sheet. So is it fair to say that if the project is available and ready to go, let's say, in FY '25 sometime you probably still wait till FY '26 to have an FID on this one? Or do you think a partnership or somewhat of an equity raise might be an option if the economics look compelling for this one?

B
Brendan Harris
executive

Look, I think it's too early to be specific on all of those things, but I'll just make the general observation that, that we're about to hit our sweet spot. Motheo has ramped up. We need to ensure it's running well. We're coming into what we hope will be a strong 4Q. We think we've established the consistency and predictability in general at MATSA and the way the underground is operating. We're going ex-major capital at Motheo. Megan said net debt should peak. We think, as I think someone mentioned on the call, we would agree that net debt peaks at this level. In fact, we should see a meaningful reduction coming into the fourth quarter.

You put all that together, the time frame that we think we've got to complete the drilling work on the Lower zone, the high-grade zone at Johnny Lee, integrate with Lowery, update capital cost estimates. You're probably talking around 24 months. I think before we're probably really getting towards any sort of formal decision, I think our balance sheet will look very different at that stage.

And this project for us to invest, we need to see very attractive rates of return. And on that basis, I think would also certainly be able to carry if we choose to project finance. So I think if we put those things together, I think we're very well positioned to move forward with Black Butte if it makes sense for shareholders to do so in the time frames that I would envisage a decision being taken. But we don't need to make that decision today. What I am convinced about is every dollar that we're spending at the moment is derisking that investment and making it more valuable.

Operator

Your next question comes from Mitch Ryan from Jefferies.

M
Mitch Ryan
analyst

Brendan, you just outlined sort of, I guess, the position of the company of both assets staying to really -- straps you. You're delivering consistently. You've got a good reputation. Your equity prices that are almost all-time high, if not at an all-time high. And so you [indiscernible], what's next? You're seeing it on a ground of scale, M&A starting to play out for copper units. Is that something that's on the radar? How are you and the Board are having those discussions and thinking about the opportunities that exist out there?

B
Brendan Harris
executive

Look, Mitch, as an old pretty average cricketer, I'm a big believer only as good as your next innings, so I don't get too carried away with things. The reality is we've got a lot of work to do to continue to just eke out the commitments that we've made. It's about being better every day, continual improvement. We still have a lot of value to extract.

I talked to you about the strategic work we're doing around reserves and resources. We've talked about the opportunity at depth at Masa 2. We've touched on A1, but there's a broader land package. I could say that the Board and the executive team were in Botswana circa 3 weeks ago, looking through all of the opportunities that we see, and there's plenty to keep us busy there and continue to extract value, and we just touched on Black Butte.

So I still feel like we have a lot of opportunity embedded within that -- within the business to grow value. And I think we happen to be in a commodity, which will continue to present tailwind for us. So that's how I think about it, Mitch. There the conversations we're having with the Board. So there's probably not much more to add at this stage.

M
Mitch Ryan
analyst

Okay. To move from sort of the macro down to the micro, with regard to Motheo in the A4 expansion, I know you've reiterated sort of first ore 1Q '25. But with that slight delay to the pre-stripping. Just wondering if you could provide a bit more color around the ramp-up profile and the risks to achieving that.

B
Brendan Harris
executive

Yes. Thanks, Mitch. Look, I'll throw to Jason quickly. But in short, we will deliver first ore at A4 as planned. It's a sequencing issue around the stripping. And we see, as we've committed to, no change actually to the targets we've given for our copper equivalent production into next year and the delivery of 50% growth over those 2 years to the end of FY '25 from continuing operations and Motheo is at the heart of that. So we actually don't see any change in terms of the net outcomes. It's a quick, if you like, of the design of the mine plan, but maybe Jason?

J
Jason Grace
executive

Yes, Mitch. Brendan, it's absolutely right. As I'm sure you understand, we continually optimize our mine plans, and we do go through a full annual review of our life of mine plans there, even looking at designs. We've recently updated staging designs on both open pits, and we're very comfortable that we will deliver first ore as expected at A4.

And as we touched on there before, we have a robust mine plan that will deliver the requirements of a 5.2 million tonne per annum rate and enable sort of the plant to go higher when and if we achieve that on a sustainable basis. So from my point of view, I think we're looking very good for achieving all of those outcomes, and I'd see little risk at this point in time.

M
Mitch Ryan
analyst

Sorry, I appreciate the color. It was more around post that first ore. So yes, you achieved first ore, but what is the ramp-up profile beyond that look like?

J
Jason Grace
executive

Yes, yes. If you look at it, that ore supply will be sporadic over the first probably 5 quarters after we get into that first ore. After that, we get ore on a sustainable basis. And that's simply around, if you like, we're taking Stage 1 of that A4 pit down on to the top of the orebody. Once we get into the main part of the orebody there, we actually continue to go down on Stage 1 and then do waste stripping on Stage 2, very similar to what we've done on T3, and that gives us that sustainable ore supply.

B
Brendan Harris
executive

And I think, Mitch, we're running a [indiscernible] there, as you know, later this month. And in the past, we provided some sort of generic directional multiyear trends for volumes. I wouldn't expect you're going to see anything materially different. If anything, as I alluded to, is if we can get comfort in the likely throughput rates that we can achieve. Whilst it wouldn't be our base case today, it's more in the 2- to 3-plus year time horizon, you start seeing higher metal production than previously anticipated because your mine plan actually facilitates, if you like, higher throughput of ROM growth, if you like, material being processed rather than low-grade stocks.

Operator

Your next question comes from Daniel Morgan from Barrenjoey.

D
Daniel Morgan
analyst

Firstly, just on MATSA, maybe Slide 20, where you're talking about the goal to increase your reserves. Can you just remind us of the activities, work streams that underway and when you plan to release results or update the market on this?

B
Brendan Harris
executive

Yes. Perfect. Look, I'll pose straight to Richard, and I'll come back on the back end.

R
Richard Holmes
executive

Again, the work at the moment is focusing around cutting the geophysical plates that we identified down the core of Masa 2. So we've completed one hole, and we're waiting for results on that, and we've just started the second hole. So that should play out in the next probably 1 to 2 months when we can come back and update the market.

And then -- back to Brendan to give sort of the high-level overview.

B
Brendan Harris
executive

I think that's the big one, Dan, is that, that's the big volume opportunity for us down from Masa 2 around 350 meters down plunge. What we're really wanting to prove following up on the original hole and the geophysics that was undertaken is we want to prove that the host rocks continue and we want to prove it as fluids in the system. So that we either encounter or we see the trace elements that would suggest that there's prospectivity for mineralization to commence. That's the game changer for us. So we're hoping that we'll be able to provide some more clarity around that in the very near term.

And then, of course, as we drill more holes into that, we'll continue to keep the market updated. Reality is that's going to take time because you're drilling 1,200 meters downhole with diamond and the geometry means that it's never going to be simple. But we're really, really excited about the potential that we see there.

Beyond that, it's continuing to work and understand the strike extension of San Pedro. It's a similar volumetric opportunity to the down dip extension of Masa 2 and then obviously filling in the gaps around Olivo. There are other Olivo type opportunities that the team is identifying, I can tell you as we speak. But it's too early to talk about them. We want to fill the gaps in there and see as to where there's smoke, there's fire.

Then there's a broader piece around MATSA, which is some of these near-mine opportunities that sit within private hands. We continue to engage and see where that goes. We don't have any immediate motivation, but we do believe that we are the natural home, if you like, as a processing route for some of those resources.

And then ultimately, if you put all that together, it's been that concept study around Sotiel in a world where you're filling the parts at the centralized processing facility with simply Magdalena and Aguas Teñidas. That is that work that Ian is going to move on to once the permanent filter press is up and running, fully commissioned at Motheo. And he's obviously got an incredible track record. If you look recently, obviously, with the work he's done at Motheo, he's not only going to be working -- moving on to the concept study for Sotiel, but he is also going to be moving on to the work around Black Butte, which we're really pleased about. So again, he's been freed up at a pretty pivotal time. Does that give you a good feel for it, Dan?

D
Daniel Morgan
analyst

Maybe switching over to Motheo and a similar vein for Page 17. If you look at it, there's a lot of stars marketing prospects. What makes these prospects? And what is the work streams underway to test them?

B
Brendan Harris
executive

Yes. Look, I'm going to be a little less transparent here, and I'll pass to Richard, but I think a lot of people are starting to wake up to the potential of the Kalahari Copper Belt. We've recently flown a whole basin-wide AGG server using technology that comes out of the U.S. military. We're building a customized understanding of the setting more broadly, the geological setting of the entirety of the Kalahari Copper Belt, which is helping us better understand every day, the genesis of these ore bodies.

And really, what you're seeing there is just an artefact of areas where we think that the prospectivity based on that model is encouraging. And we are doing more and more work every day. But I don't really want to go into the broader thinking around it because I do believe it's commercial in confidence. But Richard, I don't know if there's anything you want to add to that?

R
Richard Holmes
executive

Yes. So just building on what Brendan did, we've now got 3 deposits today for T3 and A1. We've got a much better understanding of the controls and mineralization. So the more we mine, the more we learn, and we're beginning to apply that through to our 3 dimensional modeling. We touched on the AGG, that's the first time that a large-scale survey is being done in Botswana. We covered the whole of the Kalahari Copper Belt and collaborated with some of our neighbors. So building this big 3D model means that we've got a much better handle and a much tighter control in our targeting. And now we can start to play that out and start releasing diagrams by this that just shows you we've got a real pipeline of opportunities to start testing over the next 6, 12 months that all can help, but all can feed into that T3 central processing plant.

B
Brendan Harris
executive

Yes. And I think, Richard, it's fair to say that what you see there down on that map, those names will change. I guarantee that they're going to change as we work through this process because, frankly, whilst we're really pleased to have announced the A1 maiden resource, the reality is we're looking for the next 50 million tonne resource that sits within proximity to Motheo or even more distal that could even support an additional processing hub. We still believe there's an enormous amount of prospectivity, but there's years of work ahead of us to, if you like, unlock the secrets of the Kalahari.

Operator

Your next question comes from Alex Papaioanou from Citi.

A
Alexander Papaioanou
analyst

Given copper is now hovering around $100,000 a tonne, how does this make you think or do anything differently around mine sequencing, particularly at MATSA?

B
Brendan Harris
executive

Look, good question. I think Jason sort of touched on it, that the most important thing for us in this multi-mine complex is actually consistency and predictability. Price will come and go. History says to me start making plans on price. And the very next day, you're probably having to rerun your plans. And often when you're chasing price through high-grading or low grading mines, you end up chasing your tail. So my core philosophy is have a plan. Don't be myopic about it. Don't be blinked, but be very, very hesitant to move away from what you think is the value maximizing strategy on the basis of short run movements in price. Jason?

J
Jason Grace
executive

No, I think you've captured it well. I think if we look -- in my mind, the only real opportunity there is looking long term if we believe this is going to continue. It really starts to open up the potential for Sotiel and what we can potentially do there, which we have a program of work underway.

B
Brendan Harris
executive

In its infancy in honesty because Ian's truthfully been wedded to Motheo a little longer than we would have liked because we're resolving this issue with the filter -- the concentrate filters. But again, we're getting close to, I guess, getting past that challenge and he'll get underway on that work. But yes, look, great question. Easy in hindsight. There'll always be a write-in answer in hindsight, just history said to me, stick to your plan.

A
Alexander Papaioanou
analyst

Yes, and then on to hedging, as you know, zinc can be pretty volatile. With zinc close to $3,000 a tonne here, would you look to add more in zinc hedges?

B
Brendan Harris
executive

Look, again, a lot of people on the call probably know me for a long time. I think our shareholders own us for exposure to the underlying commodity. We have some hedges in place tied to our financing facilities. They will roll off over time. Our main objective is to generate revenue, generate cash flow, pay down debt. We will manage price volatility through having a strong balance sheet.

Again, I remember the years when commodities like copper were $1 a pound. And when they went to $1.50, everyone thought they were amazing prices. And the risk is that you hedge at the wrong time. Again, I think we want to be a good mining company. I think others can play in the forwards. I think the best thing we can do is, again, give our shareholders exposure to the underlying commodity to the maximum extent that we can and then run the business well.

But Megan, I don't know if there's anything on hedging specifically that you wanted to touch on, given we're on the topic?

M
Megan Jansen
executive

Thanks, Brendan. And I think you've covered it pretty comprehensively. We've got the longer-term hedges connected to our Masa 2 facility. And you'll see the table included in the quarterly consistent with other periods, it gives you a good indication to the proportion we have hedged going into FY '25. In addition to those longer-term hedges, we undertake QP hedging for sales that have occurred so as to really mitigate volatility to our income statement and manage our working capital. But as Brendan touched on, longer term, we're not looking to change our strategy and enter into any further long-term hedges.

Operator

Your next question comes from David Radclyffe from Global Mining Research.

D
David Radclyffe
analyst

Just a bit of a follow-up to the MATSA reserve update process. And sort of putting a bit of a twist on that question. I mean we're now sort of over 2 years into the acquisition. So you're actually happy with the pace of unlocking that near term mine and regional resource potential at MATSA. And I guess it goes to the point that you've got some interesting hit, but I presume it's still too early for any of those to come into the actual mine plan and actually outline that new sort of mine contributor that we've all sort of been looking for.

B
Brendan Harris
executive

Yes. Look, David, thanks for that. I'm never happy because you'd always wanted to be quicker. The reality is, my view is this is one of the biggest value levers, if not the biggest that we have. So by definition, the quicker we can bring that into the equation, the more value we realize for our shareholders. So the team here probably would tell you I pushed pretty hard on this area.

But the reality is that the job to this stage, I think, in the 18, 24 months of ownership has been quite remarkable to discover San Pedro and have real confidence in that and be in a position to test a [ fluctual ] extent, Olivo the work I'm starting to see on Masa 2. Of Masa 2, no question a ways away, and it's always going to be because of where it is.

San Pedro and Olivo, I think we actually say in our quarterly that we're currently updating our resource and reserve statements for MATSA, and we would expect to see those bleed in over the course of the coming months into this year and into next. So these things are going to have an impact relatively quickly. The question for us is how do we keep that momentum up and keep building, if you like, our endowment.

We said once before, I think we have between Masa 2 deeps and the San Pedro extension, we have all of the volumetric opportunity we need to achieve that target of 15 years in front of the -- in the face in the next 3 to 5 years. I want us to build confidence or otherwise as quickly as possible because we need to also make sure we've got other options. I'd rather know if we're not going to achieve those sorts of outcomes on the basis of what we see rather than the other way around, because, again, there's so many things and so many opportunities for us to follow up and chase in that broader MATSA district. But as we see today, they are the best opportunities, and they really do have quite incredible prospectivity.

Operator

Your next question comes from Paul Young from Goldman Sachs.

P
Paul Young
analyst

Brendan, just a question on the Motheo mill. Really rare to see project start-up like this in periods of time. A mill run 10% even 20% above nameplate for weeks on end or extended period. So just curious around that performance. Is that driven by different ore characteristics that you anticipate? Or is it purely just conservative design or over design?

B
Brendan Harris
executive

I'll pass to Jason in a moment, but I guess, look, a couple of things from my perspective upfront. Geology, you can never beat the geology. If you get a chance to get across to Motheo, you'll see that the run of our ore mine material is very course in terms of the sulfides when you walk on the high-grade pad and the medium-grade pad. It's really caused [indiscernible] bornite, it floats incredibly well. So it's not an overly complex processing flow sheet.

As I've said before, it's a completely flat topography. So you've got no compromise in the way that you convey as in your mind, if you like, is configured. So as you know, often where you get bottlenecks, particularly in the early days or in your transfer points, it's about as simple as it can be. And of course, there was a degree of conservatism in certain elements that was built into the plan, but I think appropriately.

So I think the other thing, Paul, we did dodge a bullet to some extent, if I can put it that way. The concentrate filter presses in any other part of the world, I think, would be an enormous problem for us. We would have had all the capacity to produce the concentrate, but actually not filter it. But being in Botswana and close to South Africa, quite novel that we're actually able to get hold of 3 mobile concentrate filer presses that we could affect -- our own trucks, and we basically have parked up and are relying upon until that new permanent solution gets in place. So it's not that we haven't had challenges. The way when we were over there with the Board 3 weeks ago, management would describe it as it's probably looked like the duck on the pond from the outside, but I can tell you underneath that they've been paddling really down hard. So there have been challenges, but I think it gets back to geology. It gets back to the simplicity of the flow sheet. It gets back to the topography and gets back to just good execution and good people.

But Jason, I don't know if there's anything else that you want to add on that?

J
Jason Grace
executive

I think you've captured it. Look, coming back to the geology from day 1, we have seen basically, our grinding figure draw less power to do the same work. So we were confident there on the very early stages of commissioning at the 3.2 level, but there was potential upside in this plant. Yes, agree also, the design criteria were appropriate. This was designed for success. And I think we're seeing the benefit of both of those factors come in.

B
Brendan Harris
executive

But there were some really novel engineering work as well, Paul, that we probably over beer can talk about. But it's not gold plated. It's built incredibly well, but it's not like everything has been over scope has been. So in other words, when you look at the capital efficiency of it, it's incredibly good for the throughput rate, yet it's giving us that excess capacity. So I think it's a range of factors. But yes, look, I think we feel fairly blessed at this stage, but we're not resting on our laurels.

P
Paul Young
analyst

Yes. Great position to be. I mean it sounds like it's more around all hardest and grind size. If I'm hearing that, but...

B
Brendan Harris
executive

Yes, ore hardeners, grind size, course, sulfide floats really well, really amenable to getting very attractive recoveries without, frankly, too much work.

P
Paul Young
analyst

Yes. That's great. And then just to clarify, Brendan, some comments about earlier around the mill performs above [ 9% to 5.2% ] that you'll be sort of bleeding in so the low grade ore of stockpiles. Is that a strategy you in the past also provided that chart showing that low-grade stocks from T3 sort of peak in FY '26? If the mill performed strongly, that we won't see that pay you would just continue to process low grade stocks or bleed in?

B
Brendan Harris
executive

Look, again, these things are all fluid for us because we're looking at lot of asset plans at the moment, but your thinking is broadly right. And really, what I'm just wanting to make sure is that people realize that over a 2- to 3-year period, higher throughput can give you an important and meaningful contribution to metal. In the near term, it derisks the operation and as you said, bleeds in low-grade stocks and can give you an incremental improvement in overall metal. But again, not to get ahead of ourselves. Of course, it will give us economies of scale on a cost perspective as well.

P
Paul Young
analyst

Great. And then just finally, I mean, good color on treatment charges in the report, particularly around zinc. TCs and noting that the benchmark prices come in for the current quarter, well below last quarter. Just concern, Brendan, just on zinc and copper treatment charges, is zinc you're going to be realizing at quarterly benchmark and in copper, you won't realize, low I guess, market rates for TCRCs for copper until calendar year '25?

B
Brendan Harris
executive

No. I'll pass to Megan, if you want to color it in. But if you're thinking MATSA, you get the annual benchmark, but zinc only settled after the end of the quarter. And so that's why it was provisionally for when I say that calendar year. So that's why it was provisionally priced for the March quarter, Paul, at the prior benchmark. That's why you'll see a true-up for one of a better term coming through in the fourth quarter. And then you'll see the continuation of those lower TCRCs also moving through into future sales.

And then that's MATSA, whereas Motheo, of course, is effectively exposed to spot. We are starting to move some of the con on to term contracts. Really, there's a range of reasons for that to, if you like, derisk the book to some extent, we want to have a balance. Those term contracts are being done closer to the current benchmarks, but we are still seeing some spot deals being done at fairly attractive rates, as you would see with other companies.

Operator

Your next question comes from Ben Lyons from Jaden.

Pardon me, Ben, you're line is now live.

There are no further questions at this time. I'll now hand back to Mr. Harris for closing remarks.

B
Brendan Harris
executive

Well, thanks, everyone, for joining us. I know how busy you've been this morning. I've been watching the e-mails coming through and all the research. I appreciate reading that as well. Have a good day, and we look forward to catching you for the fourth quarterly call. And for those going to Botswana, I hope you have a great trip. Thank you.

Operator